The Anonymous Widower

Did The Project Management Go Wrong On The Holloway Road Bridge? » Walking Down Holloway Road

1 Comment »

  1. Actually, this picture isn’t really fair to the bridge works at Holloway Road. These are road works are mainly to do with the Archway gyratory road planning that is going on at the same time as the bridge works. Some of this work has been postponed due to the chaos of the bridge works! I wonder which clever bright sparks decided to do all this work at the same time? Their sanity must be brought into question? As if this isn’t bad enough, The rail bridge at Highbury and Islington Station is undergoing work too, with a planned road gyratory scheme at the Highbury Corner roundabout in a similar style to this work going on at the northern end of Holloway Road. This area is rapidly becoming a living hell with road closures, diversion and bus route changes enough to totally confuse anybody!!

    Comment by Tim Hubbard | December 6, 2016 | Reply


Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.