The Anonymous Widower

Standoff on the Cambridge Busway

Cambridgeshire County Council has now blamed the contractor for the delays to the Cambridge Busway according to this report.  Independent inspector Atkins have also been called in.

Atkins points to several defects which must be fixed before the busway is handed over. They include the St Ives Park and Ride site being built at the wrong gradient, the River Great Ouse viaduct leaking water and the maintenance track which runs alongside the busway being constantly flooded.

It would appear that the contractor disagrees.

I’m glad that this project is not needed for the London Olympics.

March 9, 2010 - Posted by | Transport/Travel | , ,

No comments yet.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.