The Crossrail Spoil Conveyors At The Limmo Site
The pictures show the conveyors to take spoil away from the tunnels being dug from the site on the Limmo peninsular.
The pictures were of course taken from the Emirates Air-Line cable-car.
The pictures show the conveyors to take spoil away from the tunnels being dug from the site on the Limmo peninsular.
The pictures were of course taken from the Emirates Air-Line cable-car.
March 3, 2013 - Posted by AnonW | Transport/Travel | Cable-Car, Construction, Crossrail, Emirates Air-Line, Tunnels
This site uses Akismet to reduce spam. Learn how your comment data is processed.
What this blog will eventually be about I do not know.
But it will be about how I’m coping with the loss of my wife and son to cancer in recent years and how I manage with being a coeliac and recovering from a stroke. It will be about travel, sport, engineering, food, art, computers, large projects and London, that are some of the passions that fill my life.
And hopefully, it will get rid of the lonely times, from which I still suffer.
Why Anonymous? That’s how you feel at times.
[…] be fair to Crossrail, they seem to have gone out of their way with green walls to minimise noise, using the river to carry tunnel spoil and being a good neighbour as at Stepney City Farm. They have also launched a well-funded and […]
Pingback by Crossrail And The Super Sewer « The Anonymous Widower | May 31, 2013 |
[…] I doubt they’ll be much disruption from the actual boring of the Greenwich Interconnection Tunnel, as it’ll all be dug from Greenwich from a site with water access. As the tunnel is being bored towards Chambers Wharf, it would seem likely that the large amount of tunnel spoil created will be loaded on barges at Greenwich and taken away for disposal, with little disruption to anybody. It would appear to be a smaller version of the system Crossrail used on the Limmo Peninsular in East London. […]
Pingback by Thames Tideway Tunnel – Greenwich Interconnection Tunnel « The Anonymous Widower | May 14, 2015 |