The Anonymous Widower

New Tracks And Platforms At Abbey Wood Station

These pictures show construction work going on, mainly on the Southern side of the North Kent Line at Abbey Wood station.

The current southern platform, which is numbered 1, will become an island platform for the North Kent Line between the two tracks., The current Up line will become the Down line , with the new Up line being created to the South side of the platform. As the pictures show work is progressing well on creating a concrete channel for the track.

August 4, 2015 - Posted by | Transport/Travel | , ,

No comments yet.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.