When I wrote Is Liverpool Planning To Invade Manchester By Train?, I enclosed a clip from the October 2015 Edition of Modern Railways about energy storage on the proposed new Liverpool trains.

Merseytravel has indicated that it will be seeking ‘innovative proposals’ from manufacturers, with considerable emphasis being placed on the overall cost of operating the fleet rather than just the basic cost of the trains themselves. Options such as regenerative braking and onboard systems to store energy under braking to be used for acceleration will attract particular interest. The independently-powered EMU (IPEMU or battery train) concept evaluated earlier this year on a modified Class 379 in East Anglia ,might see an application here.

So if energy storage is good for Scousers, surely it would be good for Cockneys! I could add Brummies, Geordies, Mancunians, Bristolians, Glaswegians, Hullensians and lots of others too!

I feel that using the new trains in IPEMU-mode would be a better way to run electric passenger trains on the Gospel Oak to Barking and Dudding  Hill Lines, as all the inept disruption of putting up the catenary could be performed in a more relaxed manner.

But are there any other advantages, other than the energy saving and flexibility, if the trains have energy storage or an IPEMU capability?

  • This morning, the wires are down on the London Overground at Hampstead, so trains are stopped. An IPEMU could possibly get through to provide a limited service.
  • At times, lines are closed for work on the electrification and Rail Replacement Buses have to be used. Would an IPEMU be able to  provide a service in some cases, by perhaps using another track? Obviously, safety for the workforce would have to be ensured, but Network Rail is improving its working methods all the time.
  • London has two different electrification systems; overhead and third rail. Would an IPEMU allow extra services to be developed, which bridge the two systems?
  • Would an IPEMU give advantages in the design, construction and operation of depots, by needing less electrification, as trains could move under their own own power.
  • Suppose a terminal station like Chingford needs to be rebuilt or a new station needs to be built, would it cost less to design and build a station, if the station had no electrification?

Even if the current order for Aventra trains for the London Overground isn’t delivered with energy storage and an IPEMU capability, I believe it will become the standard for it to be installed on trains in the near future.

 

October 6, 2015 - Posted by | Transport/Travel | , , ,

1 Comment »

  1. […] When Transport for London ordered new Class 710 trains for the London Overground, I took a look a detailed look at the trains and posted Will The London Overground Aventras Have Energy Storage? […]