The Anonymous Widower

Waterloo Upgrade August 2017 – A First Trip Out Of Platform 4

I took these pictures as my train left Platform 4.

It does seem that most of Platforms 1 to 6 have been seen in the Departures display.

 

Note how in this display from about 16:00.

  1. There are still quite a few delayed and cancelled trains due to the overrunning engineering work.
  2. Platforms 1 to 4 and 6 have a departure.
  3. Platforms 20-24 don’t appear. in the display.

It appears that a lot of the objectives have been completed.

August 29, 2017 Posted by | Transport/Travel | , | Leave a comment

Waterloo Upgrade August 2017 – 28th August 2017

I took a quick trip to Waterloo station and took these pictures from a train departing from Platform 19.

There certainly seems to be less piles of track and other construction materials.

August 29, 2017 Posted by | Transport/Travel | , | Leave a comment