Bolton Station Is Still An Ongoing Project
I Bolton station still needs a lot of work to be done to allow electric trains to pass through.
I had just intended to change trains at Bolton on a trip from Deansgate to Blackburn. But because the trains to Blackburn are only hourly, I had to wait nearly an hour.
Hopefully, when the service between Bolton and Blackburn is doubled in frequency, as I wrote about in Blackburn To Manchester Every Thirty Minutes, the wait will be reduced too!
Hopefully
No comments yet.












Leave a comment