Tottenham Hale Station – 1st October 2018
These pictures show the progress being made at Tottenham Hale station.
Note.
- The third platform at Tottenham Hale station is taking shape.
- The steelwork is up for the lift towers.
- A lot of the third track and the electrification is in place.
I am also coming to a couple of conclusions.
- There appears to be enough space alongside the third track to insert a fourth.
- The Ferry Lane road bridge though may need to be rebuilt to get the fourth track through.
Progess also appears to be in-line with completion of the station and the third track before the end of 2019.
A Greater Anglia Train In An Unexpected Place
I took these pictures from Drayton Park station of a Greater Anglia train, which consisted of a Class 90 locomotive, Mark 3 coaches and a DVT going South on the line above the station that leads to the Canonbury Curve.
I wonder what it had been doing?















