This post is a musing on the future of the Class 378 trains.

The Thames Tunnel

The Thames Tunnel is the tail that wags the East London Line, when it comes to trains.

  • For evacuation and safety purposed, trains running through the tunnel, must have an emergency exit through the driver’s cab.
  • It hasn’t happened yet, as far as I know, but a version of Sod’s Law states if you ran trains without this emergency exit, you’d need to use it.
  • London Overground’s Class 378 trains have this feature, but their Class 710 trains do not.

So it would appear that until Bombardier build an Aventra with an emergency exit through the driver’s cab, that the existing Class 378 trains must work all services through the Thames Tunnel.

Incidentally, I can’t think of another long tunnel, that might be served by the London Overground, so it could be that Class 378 trains will be the only trains to go through the Thames Tunnel, until they wear out and need to go to the scrapyard.

Six Car Trains On The East London Line

I covered this in Will The East London Line Ever Get Six-Car Trains? and I came to this conclusion.

I will be very surprised if Network Rail’s original plan on six-car trains on the East London Line happens in the next few years.

It might happen in the future, but it would need expensive platform extensions at Shadwell, Wapping, Rotherhithe and Canada Water and Surrey Quays stations.

Increased Frequency On The East London Line

If five-car Class 378 trains are the limit, the only way to increase capacity of the East London Line would be to increase frequency.

The current frequency of the East London Line is sixteen trains per hour (tph)

There are four tph on each of these routes.

  • Dalston Junction And Clapham Junction
  • Dalston Junction And New Cross
  • Highbury & Islington And Crystal Palace
  • Highbury & Islington And West Croydon

Two increases are planned.

  • 2018 – 6 tph – Highbury & Islington And Crystal Palace
  • 2019 – 6 tph – Dalston Junction And Clapham Junction

This would increase the frequency of the East London Line to twenty tph.

It will probably mean an updated digital signalling system on the East London Line.

Eventually, I think it likely, that a full ERTMS system as is fitted to Thameslink and Crossrail will be fitted to at least the East London Line, but possibly the whole Overground network.

Digital signalling would certainly allow the twenty-four tph frequency of Thameslink and CXrossrail, which could mean that the four routes all received a frequency of four tph.

But Thameslink and Crossrail are theoretically capable of handling thirty tph or a train every two minutes, through their central tunnels.

If the two modern multi-billion pound tunnels can handle 30 tph, why can’t their little brother, that started life as a half-million pound pedestrian tunnel in 1843,

The Number Of Trains Needed For The Current Service

If I go through the routes of the original Overground, I find the following.

Dalston Junction And Clapham Junction

Trains take 46 minutes to go South and 44 minutes to come North and a round trip would take two hours.

This means that the current four tph service would need eight trains.

A six tph service in the future would need twelve trains.

Dalston Junction And New Cross

Trains take 22 minutes both ways and a round trip would take an hour.

This means that the current four tph service would need four trains.

A six tph service in the future would need six trains.

Highbury & Islington And Crystal Palace

Trains take 44 minutes to go South and 43 minutes to come North and a round trip would take two hours.

This means that the current four tph service would need eight trains.

A six tph service in the future would need twelve trains.

Highbury & Islington And West Croydon

Trains take 52 minutes both ways and a round trip would take two hours.

This means that the current four tph service would need eight trains.

A six tph service in the future would need twelve trains.

This means that the current four tph on all four routes needs twenty-eight trains.

The Proposed 2020 Service

This will have two extra tph to Crystal Palace and Clapham Junction and will need thirty-six trains.

Six Trains Per Hour On All Four Routes

as each route terminates at both ends in a single platform, which can handle six tph, with the right signalling, I feel that this could be the design objective of the East London Line, when it was built in the early-2010s.

This could be achieved with forty-two trains, leaving perhaps twelve to fifteen trains for other duties, depending on how many are needed on stand-by or are in maintenance.

What Could Be Done With Twelve Trains?

As I calculated earlier, three routes need twelve trains to provide a six tph service.

  • Dalston Junction And Clapham Junction
  • Highbury & Islington And Crystal Palace
  • Highbury & Islington And West Croydon

All three services take between 44 and 52 minutes.

So could another six tph service that takes around this time be added to the current four services?

Willesden Junction As A Northern Terminal

Trains could take the North London Line to Willesden Junction and terminate in the Bay Platform 2.

I estimate the following timings from Willesden Junction.

  • Highbury & Islington – 27 mins
  • Dalston Junction – 31 mins
  • Whitechapel –  – 41 mins
  • New Cross – 49 mins
  • Crystal Palace – 64 mins
  • Clapham Junction – 73 mins.
  • West Croydon – 74 mins

It would appear that the only possible Southern terminal of the current four, would be New Cross, as that is the only terminal within the 44-52 minute range of journey time.

So could a service between Willesden Junction and New Cross replace the current one between Dalston Junction and New Cross?

  • It would need to be run using dual-voltage trains
  • Voltage changeover could be at Highbury & Islington station.
  • Extending the New Cross service would free up a bay platform at Dalston Junction station.
  • It should be possible to have a frequency of six tph.
  • Serious modifications or additions to infrastructure would probably not be required.

As running to Willesden Junction was talked about before the Overground opened, I wonder if the numerous crossovers on the North London Line, already allow trains from the East London Line to terminate at Willesden Junction.

Southern Terminals Via New Cross Station

This map from carto.metro.free.fr shows the lines at New Cross station.

Note how the double-track East London Line, shown in orange, arrives from Surrey Quays station arrives in the North-Western corner of the map, becomes a single-track and then goes under the main lines before going into the bay platform D.

This Google Map shows the same area.

The London Overground track is clearly visible.

Could extra track be added, to enable the following?

  • Southbound trains could join the main line and stop in Platform C
  • Northbound could leave the main line after stopping in Platform A and go towards Surrey Quays station.

If this is possible, then trains could run between Dalston Junction and Lewisham stations.

Once at Lewisham they would have choice of Southern terminal,

Hayes As A Southern Terminal

Consider a service between Dalston Junction and Hayes stations.

  • I estimate that a train could go between the two stations in 53 minutes.
  • Hayes station has two terminal platforms

Six tph would probably be too many services, but 2-3 tph might be very welcome.

Orpington As A Southern Terminal

Consider a service between Dalston Junction and Orpington stations.

  • I estimate that a train could go between the two stations in 47  minutes.
  • Orpington station has three terminal platforms.

Six tph would probably be too many services, but 2-3 tph might be very welcome.

A Combined Hayes And Orpington Service

As a case can be made for services to both Hayes and Orpington via Lewisham, I think the ideal service could be two tph to both Hayes and Orpington.

  • There would be four tph between Dalston Junction and Lewisham.
  • Stations on the East London Line would have access to the important interchange station at Lewisham.
  • Several stations on the routes to Hayes and Orpington would have a two tph service to Crossrail and the Jubilee Line.

Other Stations Via New Cross

Looking at rail maps, there would seem to be several possibilities including with their times from Dalston junction station.

  • Beckenham Junction – 41 mins
  • Bromley North – 40 mins
  • Gove Park – 35 mins

There are probably others.

Southern Terminals Via Peckham Rye Station

As an example Streatham Common station is planned to be a major interchange and is 43 minutes from Dalston Junction.

Would a bay platform work here as an East london Line terminal?

Conclusion

If all fifty-seven Class 378 trains worked the East London Line, they could run six tph on the current routes.

  • Dalston Junction And Clapham Junction
  • Dalston Junction And New Cross
  • Highbury & Islington And Crystal Palace
  • Highbury & Islington And West Croydon

It would need forty-two trains.

Suppose the Dalston Junction and New Cross service was replaced with a Willesden Junction and New Cross service.

  • This would provide a useful direct four tph service between East and North London.
  • Changing at Highbury & Islington station would be avoided for a lot of journeys.
  • The journey time wold be around 49 minutes.
  • A two tph service would need four trains.
  • A four tph service would need eight trains.
  • A six tph service would need twelve trains.
  • Many journeys between North and South London would now be possible with just a single same platform interchange.

To run the following frequencies on this route would mean these total frequencies on the East London Line and total numbers of trains.

  • 2 tph – 20 tph – 40 trains
  • 4 tph – 22 tph – 44 trains
  • 6 tph – 24 tph – 48 trains

I think that if the figures are juggled a bit, there is enough trains to run extra services to one or more Southern destinations from Dalston Junction.

My preference would be a split service of 2 tph to both Hayes and Orpington via New Cross, where some new track would be needed.

This would do the following.

  • Create a frequent connection between South-East and North-East London.
  • Both areas would be connected to Crossrail and several Underground Lines, including the future Bakerloo Line Extension.
  • The Hayes Line would be shared between Overground and Southeastern trains.

No more new trains or large amounts of new infrastructure would be needed.

I suspect that London Overground and the new Southeastern franchise can do better than my musings.

 

 

May 10, 2019 - Posted by | Transport | , , , , , , , ,

2 Comments »

  1. As a supporter of using existing rail infrastructure to the max what a humdinger the OG has proved to be, you’ve got to admire the foresight involved; with yet more to come! As a Lewisham dweller I’d love to see the OG come here. And Lewisham council I understand are pushing hard to achieve this, along with the Bakerloo extension.
    But I have read that the OG beyond New Cross, if doable, would have been completed when it opened; was it a technical thing or a money thing that prevented it at the time.
    The problem as I see it would appear to be the flat junction to the west of Lewisham station which is supposedly at full capacity. Not being technical, would ERTMS help solve this problem?

    Can’t see an Orpington connection, great idea that it is, getting any support from a blinkered Bromley Council (they’ll only back a ‘something’ that links Bromley centre to Canary Wharf!). But Beckenham and Hayes yes (even though they are in the Borough of Bromley), as they will support the identified New Cross/Lewisham/Catford/Lower Sydenham Opportunity Areas.

    Perhaps extending Tramlink, with bi-mode tram-trains beyond Elmers End to a 2 platform bay junction built above the bus stand at Lewisham, with other services to Beckenham or Central Bromley or Orpington may be viable. But again may not get far without Bromley support.
    What you have suggested is certainly the ‘low hanging fruit’ and the OG beyond New Cross fits the bill perfectly. But the Lewisham flat junction I fear is the key. And what with all the new high rise around it and more to come, I think that the time for a station rebuild has now passed.

    Comment by Dave | May 10, 2019 | Reply

    • I’ll take your last point first. Lewisham station should have been rebuilt and probably still should be with tower blocks on the top. Developers get more for flats on a station and if they leave out some of the car parking they make more profits.
      I suspect that ERTMS was too far away when they laid out the Overground and dreams of 30 tph were thought impossible. But dear old Vicky showed 36 tph is possible and we should expect her to achieve the magic 40 tph in a few years time. So all planning of metro stations should be done on the basis, that within their life-time trains will be calling every 90 seconds.

      Comment by AnonW | May 10, 2019 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.