The Anonymous Widower

Construction Ramps Up At £260 Million Mossend International Railfreight Park In Scotland

The title of this post, is the same as that of this article on Rail Engineer.

This is the first paragraph.

The development of a major new low carbon, multi-modal rail freight facility located in the heart of Scotland has taken a significant step forward with the laying of a private rail track to facilitate construction. Once complete, Mossend International Railfreight Park (MIRP) will provide 2.2 million sq ft of logistics space and Scotland’s first 775-metre electric rail terminal.

This looks to be all good stuff.

But Glasgow has needed the capability to handle 775-metre electric freight trains for some time.

So what took politicians so long to decide to upgrade the MIRP, as surely the ability to handle the longest electric freight trains will surely encourage the following?

  • The movement of freight from road to rail.
  • A reduction in freight traffic on the roads of Scotland and to a lesser extend England.
  • The ability to run electric freight trains between Glasgow and Continental Europe.

If freight ramps up after the MIRP is completed, there’ll probably be a need for the following.

Some new highly capable locomotives like the Class 93 locomotive.

More than the proposed 16 trains per day (tpd).

They will certainly need the planned 24/7 operation.

This Google Map shows the site of the MIRP at the current time.

It will be interesting to see how the site grows.

 

October 5, 2021 Posted by | Transport/Travel | , , , , , | 2 Comments