London Bridge is Going Up
The picture shows the new bridge going up, that will take the Thameslink tracks to Charing Cross over Borough Market on a viaduct.
When I met one of the project managers at King’s Cross a few weeks ago, he assured me it was all on schedule.
This viaduct at Borough Market will remove one of the worst bottlenecks on the railway network and illustrates how the Victorian builders of the network, often did things on the cheap and without any thought for the future. After a long public enquiry, the permission was finally given for the new viaduct to effectively double the capacity through the area.
Hopefully, when the market is rebuilt underneath the viaducts, it will continue to be an asset to London for many years in the future. Some though have expressed serious doubts about the scheme.

[…] few months ago I showed a picture of the new railway bridge at London Bridge over Borough […]
Pingback by London Bridge Is Nearly There! « The Anonymous Widower | July 10, 2011 |