Belgians Give Up On Fyra
The Belgian government has pulled out of the Fyra project to run high speed trains between Brussels and Amsterdam. It’s reported here.
This sorry story has a lot of lessons for governments, who try to implement large projects.
Building railway lines and in particular high-speed lines is not difficult, except for the odd local political and environmental problems, as HS1 found in Kent and HS2 is now finding. But the actual line generally works well from an engineering perspective, with the possible exception of the Wenzhou crash in China, where signalling may have been at fault. None of the high speed train crashes in this country, were caused by engineering problems on new lines.
The main problems with Fyra are all about using new unproven trains. No sensible project manager would ever use unproven technology at the heart of a new project. You could argue, that Boeing used an unproven battery system on the Dreamliner. But look what happened there!
The other major problem with Fyra is that they discontinued the traditional services between towns like The Hague and Brussels, thus alienating a lot of their target market.
So when you do a large project, make sure that it fits the aspirations of your customers.
If we look at HS2 to Birmingham, the technology to be used to build the line will be very much proven, as hopefully will be the trains, which will probably be derived from something that is working well in the UK or Europe.
The line too, will be an addition to the current services between the two cities. This in itself removes a lot of risk from this line, as say there is a problem that cuts capacity on HS2, you don’t have only one basket for your eggs. I also believe the competition from such as Chiltern and Virgin trains and their successors, will make sure that HS2 is competitive and reliable. Those two services, will also act as valuable feeder services to HS2, as say you live in Banbury and want to go to Leeds, you’d hop to Moor Street station in Birmingham and then take HS2 to Leeds, when that section of the line is completed.