The Anonymous Widower

Improving The Overground

Transport for London’s Transport Plan for 2050 says this about improving the Overground, with particular reference to creating a circular railway by extending the Goblin.

An option for doing this, could be an extension of the Overground in stages, creating new links initially where most feasible.

It does also say that new stations might be added to existing lines, giving a particular mention for Camberwell.

As I found on my trips Tracing the Goblin Extension, most of the infrastructure is already there and in many places, all it needs is innovative timetabling of the extra trains.

Buried in the report are possible plans on improving my local Overground service on the East London Line.

  • Better late night and overnight services on the Overground.
  • Automatic Train Operation on the core of the line from Dalston Junction to Surrey Quays to increase service frequency from 16 tph to possibly as high as 24 tph.
  • Six car trains on the Overground.

At the moment the East London Line has 16 four-car trains an hour in the core route, so 24 six-car trains will mean an increase of capacity of 2.25.

It will be needed, as who knows how many passengers will use the line to get to Crossrail at Whitechapel?

Once Crossrail opens, so many regular journeys I do, like to Ipswich, Oxford Street, Paddington and Heathrow could involve going to Whitechapel and then using the new line.

It should also be said as regards the East London Line, that the report says nothing about extending the line to Willesden in the west or Stratford in the east, by reopening the Eastern Curve at Dalston. This was talked about when the East London Line was created, but I think that passenger numbers might have increased more than they thought they would, so five and possibly six car trains have had a priority.

I shall be adding a bit of speculation about what might happen to the Overground in the next few days. I’ll put links here for ease of reading a post with more jumps than a whole bunch of frogs.

An Overground Station For Camberwell?

Are There Any Sensible Places For New Stations On The Overground?

But whatever happens, it looks like it’s all go on the Overground. In some ways, this disparate collection of lines in and around London, shows how the new breed of railway managers and engineers in the UK are very sensible and cost conscious , and have the needs of the passengers very much to the fore.

 

August 8, 2014 - Posted by | Transport | , , ,

1 Comment »

  1. […] I indicated in this earlier post on improving the Overground, the East London Line could be easily upgraded to take twenty-four six-car trains in each […]

    Pingback by Improving The East London Line « The Anonymous Widower | August 1, 2015 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.