Should Trains Run From Dalston Junction To Hayes?
The East London Line currently runs at 16 trains per hour, but changes to the signalling and lengthened platforms will allow 24 6-car trains per hour, in the near future.
In my speculation about tram-trains in Croydon, I realised that you could get from Dalston Junction to Hayes with just one change at New Cross, in about 64-67 minutes with a delay of about 10-15 minutes caused by the change, although the change going south is just walking across the platform.
So in a few years time, when ERTMS allows us to run trains closer together would it be a good idea to use some of the extra capacity in the East London Line to run trains direct from Dalston Junction to Hayes via New Cross and Lewisham. I believe even two trains an hour would make a lot of difference.
1. Timings between Dalston Junction and Hayes would drop to about 52-54 minutes.
2. It would give people who live North of the Thames easy access to Lewisham, which is well-connected to Kent. Otherwise you need to go to one of the terminals that serve the area. And often that is the dreaded Victoria.
3. Once Crossrail opens, it will also give those South of the Thames a second route to the line by going direct to Whitechapel, instead of going to either Abbey Wood or Woolwich.
4. Hayes to Heathrow by Crossrail changing at Lewisham and Abbey Wood will be around 1:56, whereas just changing at Whitechapel will be 1:33. What also illustrates the speed of this route is West Croydon to Heathrow via Whitechapel and Crossrail could be about 1:26.
5. It would surely give an alternative route under the river and enable people to get home when problems exist on the primary routes.
The East London Line has very much been a quiet success, that has been enjoyed by those who live in the area it serves. So why shouldn’t we widen its catchment area?
Crossrail will bring a tremendous amount of extra passengers into London. So we must develop the infrastructure that links it to as much of London as possible. Thameslink is being upgraded and to many, the East London Line is just as valuable as a North South route.
If you link Hayes to the East London Line, why not link Orpington to it via Lewisham. Two trains per hour to Orpington, would give an excellent four trains an hour to Lewisham.
I obviously don’t know Transport for London’s passenger figures, but in the four years since the East London Line reopened, I’ve only gone to New Cross once, where I wasn’t going to catch a train on from the station.
So is New Cross the least used direct southern destination on the East London Line? Also, was it only included in the East London Line for historic reasons, as it had been a Metropolitan Line destination?
If so, it might be an idea to see if extension of the four trains per hour services terminating at the station is possible. Perhaps two could go Hayes and two to Orpington, which would double the frequency to both places from New Cross.
I think the only objectors would be Southastern.
If nothing else, this analysis shows how complicated London’s rail network is and how difficult it is to get the train patterns right.
[…] Perhaps one day, they’ll extend the East London Line trains to a proper terminal at another station. like Hayes as I suggested in this post. […]
Pingback by New Cross Station Is Finished « The Anonymous Widower | April 23, 2015 |
[…] In February this year, I wrote Should Trains Run From Dalston Junction To Hayes? […]
Pingback by More Thoughts On Dalston Junction To Hayes « The Anonymous Widower | November 30, 2015 |