Appleby Bridge

The station at Appleby Bridge would appear to be progressing according to the latest plan and could open on time in August 2015. I went past the site recently but didn’t manage to see much.

Bermuda Park

Bermuda Park station is a small station in Nuneaton, but according to this story in the Nuneaton News, construction appears to be going well for an opening this year.

Cambridge Science Park

Cambridge Science Park station was originally approved in December 2013 scheduled to open in December 2015. This has now slipped to December 2016.

When I last went past the area in March 2015, there appeared to be little happening.

Cassiobridge And Watford Vicarage Road 

Cassiobridge and Watford Vicarage Road are two new tube stations being built on the Croxley Link of the Metropolitan Line linking it to Watford Junction. The link and the new and updated stations were due to open in 2016, but after the takeover of the project responsibility and management by Transport for London, the completion date is now a more realistic 2018.

Coventry Arena

Like Bermuda Park, Coventry Arena is a new station on the Coventry to Nuneaton Line. Like Bermuda Park, things seem to be going well for a scheduled opening in May 2015.

Cranbrook

Cranbrook station is a small single-platform being built in Devon, perhaps using ideas borrowing from James Cook. Progress is summed up by this story in the Exeter Express and Echo.

Ebbw Vale Town

Ebbw Vale Town is a new terminus station for the Ebbw Vale Railway, being built for the town and various reports say it will open this year.

Ilkeston

If ever a station was delayed by great crested newts on the line, it is the new Ilkeston station. This story on the BBC details the problems, which mean that this important station will be delivered over two years late.

Would the Germans, French and Italians allow this sort of construction delay? The Chinese would probably serve them with ginger, pak choi and noodles.

Kenilworth

Kenilworth  station has had a protracted gestation period, with an original planned opening of 2013, which is now scheduled for December 2016, with this report in the Leamington Observer saying work will start this year. It looks impressive and it is one I’m looking forward to use.

Kirkstall Forge

Thje builders must be confident of the schedule for Kirkstall Forge station, as the Wikipedia entry gives a completion date of the  station is given as October 2015, which is confirmed on this page on the Leeds Metro web site. When I passed recently, there certainly seemed to be an embryonic station at the site.

Lea Bridge

It was hoped that Lea Bridge station would reopen in late 2014, but despite one sighting of the orange army, nothing seems to be happening. and the new hoped-for opening date of December 2015 would appear to be optimistic.

Oxford Parkway

Oxford Parkway station is not only a new station, but one at the interim end of a new privately-funded railway route from London. As it is key to the opening of the line, I would suspect that the planned opening date of September 2015 will be achieved.

Wixams

Wixams railway station was originally promised to be completed this year. This report on Bedfordshire on Sunday takes about broken promises and a much-delayed station. In other words, it is an aspiration, that has not been planned.

The lateness with some of these stations is a trend that is worrying, but in many cases it seems that you can’t blame the politicians but bad planning and the not getting everything sorted before announcing start and finish dates.

And of course there are the newts at Ilkeston!

 

April 4, 2015 - Posted by | Transport | , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.