The Anonymous Widower

Twyford Station And The Henley Branch

I went for lunch in Henley-on-Thames today taking the Great Western Railway to Twyford station for the Henley Branch Line to Henley-on-Thames station.

These pictures document the journey between my two train changes at Twyford station.

The branch is a typical single-track rural branch line that trundles its way through the countryside, over the River Thames to a single platform, that can take eight car trains.

It is currently served by a single two car Class 165 train, that goes up and down every fifty minutes or so all day, which is augmented by a couple of direct trains in the peak.

I feel that the Henley Branch Line could easily by worked by an IPEMU train. This could be either one of Class 387 trains ordered by Great Western Railway and converted to the technology or a new Aventra train.

Consider the following about the Henley Branch.

  • It is only four and a half miles long.
  • The speed limit of the line is fifty miles per hour.
  • The bridge over the Thames has a lower speed limit and would probably be challenging to electrify.
  • The two intermediate stations of Shiplake and Wargrave are built for eight car trains.
  • There is at least one level crossing on the branch.
  • The bay platform at Twyford station looks like it could take a five car train.

The Class 379 IPEMU test train with its sixty mile range could probably do six up-and-downs without a recharge. When an IPEMU train needed a recharge it would just pull into Platform 4 at Twyford station instead of the normal bay Platform 5, raise the pantograph and charge the batteries. Alternatively, Plstform 5 could have a short length of overhead wiring for recharging the battery.

This Google Map shows Twyford station.

Twyford Station

Twyford Station

Note the two car train in Platform 5 and the Henley Branch Line leading away to the north from the Great Western Main Line..

If Class 387 trains modified with IPEMU technology were to be used, Henley could receive four car electric trains as soon as the power was switched on as far as Twyford, with no major works on the Branch.

Two Class 387 trains could be coupled together to make an eight car train, that could also be run to and from Paddington during the peak and the Henley Regatta.

 

 

December 10, 2015 Posted by | Transport/Travel | , , , , , , | 3 Comments

Why We Should Use Independently-Powered Electric Trains

I was looking for something else and found this article in the Henley Standard entitled Goring rail line work ‘will ruin countryside’. This is said.

THE electrification of the railway line through Goring will ruin the surrounding countryside, say residents.

Network Rail is installing overhead power cables as part of the scheme, which covers the route between Reading and Oxford and is expected to be finished next year.

Last week contractors began felling trees and putting up steel lattice gantries which will span the track at regular intervals to hold the wires in place.

You can argue that on a major line like the Great Western Main Line, we need robust overhead wire systems, as many of us have suffered serious delays on lines like the East Coast Main Line and the Great Eastern Main Line because of the flimsy overhead wire design.

But still the residents have a point and I think there must be a better design that mitigates the visual intrusion. Would Jasper Maskelyne and others skilled in the art of camouflage have ideas to assist Network Rail?

Network Rail can get it right, as is shown at the Grade 1 Listed Wharncliffe Viaduct, where the overhead wires are arranged to reduce the visual impact.

Are they usually as measured about where they place a gantry, as they have been on the viaduct?

Away from main lines, there will be lines like the Settle and Carlisle and the Hope Valley Line, where visual intrusion will be very important and activists will attempt to stop the installation.

It is for places like this where we must have independently-powered trains to service the route. There are two available technologies.

Electro-Diesel Trains

At the present time, there is only one electro-diesel train planned in this country and that is the Hitachi Class 800 train, which soon be seen on the Great Western Main Line and the East Coast Main Line.

They are a solution to the problem and can switch between propulsion modes at line speed, but they require diesel engines to be lugged around the country for where they are needed, so they may not be as efficient as a purely electric train.

There seems to be a few ideas for electro-diesel trains, but none appear to be comng to fruition.

Electric Trains With On-Board Energy Storage (IPEMU)

I rode the Class 379 train, that had been converted to act as a demonstrator for this technology.

It was impressive, as we trundled through the Essex countryside powered by energy stored in batteries, that had been charged from the overhead wires.

The fact that the technology works is all down to the physics of steel wheels on steel rails, which make train travel efficient in the first place.

As an electrical engineer, I know that this is technology, that can only get better.

  • Electricity storage, whether based on batteries, flywheels, capacitors or some other method, will only get better.
  • Trains will roll better through improvements in design.
  • Energy harvesting from sources like regenerative braking will be more comprehensive.
  • Secondary electrical systems on trains like air-conditioning, toilets and the provision of wi-fi will use less electricity.
  • Automatic control systems will control the train tightly according to schedule, terrain and signals to minimise electricity use.
  • Pantograph deployment will be automatic, when overhead wires are available.

But using the on-board storage to power the train on its route, is only one of the reasons it will be installed.

  • If a train has on-board storage and regenerative braking, it will be more efficient.
  • When the overhead line gets damaged or the power supply is cut, an electric train with on-board storage might still get through.
  • Depots can have simplified electrification, which is safer for staff.

Bombardier must be impressed with the concept, as all Aventra trains will be wired so that on-board energy storage can be fitted.

Conclusion

Both technologies for independently powered trains are proven, but you wouldn’t want to use on-board energy storage over more than a limited distance, beyond which the diesel would be ideal.

By using independently powered trains, you can balance electrification cost, installation disruption and visual intrusion against the extra cost of a train with on-board storage or diesel engines.

Provided of course, the independently powered train can handle the route to the satisfaction of passengers and rail companies!

On the Great Western Main Line because of the distances involved and the reliability required, electric trains using overhead power on robust supports are probably the best method we have at present.

Although, Great Western Railway have been reported as saying they might use Class 387 trains with an IPEMU capability to destinations a few miles off the Great Western Main Line, like possibly Bedwyn and Oxford.

 

December 10, 2015 Posted by | Transport/Travel | , , , | 1 Comment

Reaction In The North To Rail Franchise Awards

I have been browsing the local papers in the North, to see the area’s reaction to the award of the new Northern and TransPennine franchises.

This article in the Liverpool Echo is entitled 4,000 more seats in £1.2bn boost for North West trains, which seems a very positive headline. This is the first paragraph.

Nearly 4,000 more seats on Liverpool and Manchester services during the morning peak and a new, direct Liverpool to Glasgow service were among the promised benefits of a trains package announced today.

They use a lot of positive language and only have a slight worry about what it will mean for fares.

This extract from another article, may be a bit parochial, but it is proud of Liverpool’s involvement in formulating the winning bids.

Merseytravel – who were involved in drawing up the specifications for the bidders – said there was a commitment to four fast services an hour between Lime Street and Manchester and two per hour between Liverpool, Leeds and York, as well as more services to Preston.

There will also be an early Northern service from Lime Street to Manchester Airport (arriving no later than 4.45am), and daily services to Manchester Airport via both Newton-le-Willows and Warrington Central.

It is also positive and just as I found in the city, when they introduced the Class 319s electric to Manchester Victoria, Merseysiders seem to be looking forward to better services.

Coverage on the Manchester Evening News, like this article entitled Hundreds of new carriages promised as Arriva and FirstGroup win Greater Manchester rail franchises, seems to be more cynical and snipes at Arriva for other issues. It doesn’t have the practical tone of the Liverpool reporting.

For instance, the Liverpool reporting stresses the much better service to Glasgow, Edinburgh and Newcastle, but despite Manchester will get a doubling of Scottish services, it isn’t given the same prominence.

Across in Leeds, the Yorkshire Post has an article entitled December 10: New age of the train – or not? This said.

Unlike previous deals which did not foresee the untapped potential of this region’s railways, Transport Secretary Patrick McLoughlin has used this opportunity to insist that the new franchise-holders invest in new rolling stock to help ease overcrowding on rush-hour trains. Yet it remains to be seen whether these operators, and their partners, can deliver the “world class rail service” envisaged by Mr McLoughlin and which is so integral to the much-vaunted Northern Powerhouse which aims to improve connectivity between major cities.

It looks to me that the Yorkshire character is shining through.

So on this quick look Liverpool is more positive and Manchester and Leeds are a tad negative.

Could it be that of the three cities, Liverpool is very proud of its locally-managed franchise, Merseyrail and are those in the area bigger train users than people to the East?

I also suspect, that at present, Liverpool with the electric trains to Manchester, has benefited most from rail dvelopment in the last few years.

 

 

December 10, 2015 Posted by | Transport/Travel | , , , , , | Leave a comment