I’m asking this question, as I’ve been following the Gospel Oak to Barking Line electrification for some time and nothing seems to make sense.
In the last few hours, this article has appeared on the Rail Technology Magazine web site. The article has been given the title of TfL tries to reduce line-closure time for GOBLIN electrification.
I suppose a partial closure followed by a full closure is a reduction over a full closure, but it strikes me, as I know it does others, that behind the Press Release and the published story, there has been heated argument between Network Rail and Transport for London.
So What Do We Know?
In no particular order, we have.
- A fourteen-mile double-track railway in generally pretty good condition.
- The line can be considered to be in two parts; a western section in a cutting, with wide margins and an eastern section on a viaduct with lots of businesses underneath.
- There are two short sections of electrified railway and power is available at Gospel Oak and Barking stations, so getting the power to the line, is not the big problem it often can be in electrification schemes
- Most stations need platform-lengthening, but many have original and disused platforms, that appear to be sound if rather overgrown.
- By May 2016, South Tottenham station will be a fully step-free station in the middle of the line with lengthened platforms and a cross-over, so it could be used to split services on the line.
- The worst station on the line; Harringay Green Lanes, will be rebuilt in the near future, as the whole area is being redeveloped by Haringey Council.
- The Class 710 trains, that are being built for the line can’t be delivered until 2018, but there are at least eight Class 387 trains, that will be sitting in sidings, due to Network Rail’s atrocious performance on the Great Western Electrification.
- J. Murphy and Sons, whose yard is conveniently by the line, have been given the contract to do the track, station and enabling works.
We learn a bit about the problems of the electrification from various articles based on the original Press Release.
- From early June to late September 2016, the line will be part-closed, with trains running between Gospel Oak and South Tottenham on weekdays, but none from South Tottenham onto Barking, and no services at all on weekends.
- The 14-mile line will be completely closed from October 2016 to early February 2017, with rail replacement buses operating instead. Once the line reopens, there will be further evening and weekend works until late June 2017, then four months of commissioning works before the wires go live.
- Four sections of track have to be lowered and four bridges rebuilt, with less extensive work required to a further six bridges.
I think that we have not been told anything about the difficult negotiations that have gone on.
What Do I think Of The Plan?
Not much!
But then Network Rail and Transport for London will rightly accuse me of never planning any large infrastructure project.
They’re right!
But I have written software to support the building of some of the world’s lsrgest projects from oil platforms in the North Sea to the Channel Tunnel and the preparing of the Space Shuttle for each flight. So I can count several very good project managers amongst my friends.
I also keep coming across Artemis users on trains. That must have happened upwards of half-a-dozen times.
So what is wrong with the plan?
The main thing is that those who have designed the works are so conservative, that they haven’t taken full advantage of some of the new technology that is now available.
- The Gospel Oak to Barking Line only has no passenger trains running overnight, although freight trains operate. So why is the line not closed totally overnight and the freight trains diverted via the North London Line? Surely, this could be arranged so that much of the work could be done under rthe long summer nights or under lights.
- The Swiss firm of Furrer + Frey have developed innovative solutions for overhead electrification on difficult Swiss mountain railways and other tricky lines. I see no evidence, that some of the methods of this and other companies is being used to shotyern the project length.
- Network Rail also had a large input into Bombardier’s IPEMU development and this short line would be ideal for these trains their battery technology. These innovative trains, seem to have no part in the plans. If nothing else, they could save several million on the cost of the extension to Barking Riverside.
The Gospel Oak to Barking Line is an important railway across North London and I think that the closure could be shorter than that envisaged.
Perhaps Network Rail, Transport for London and Murphys will surprise us in the end!
A few weeks ago, I thought they might. But I’m not so sure now!
February 3, 2016
Posted by AnonW |
Transport/Travel | Electrification, Furrer + Frey, Gospel Oak And Barking Line |
Leave a comment
This is the title of a report written in 2011 by Greengauge 21.
This is how the report starts.
When High Speed Two (HS2) is complete, the longer distance, non-stopping trains on the West Coast Main Line (WCML) will in the main transfer to the new, quicker, route, freeing up valuable capacity. However, until now plans for services on the WCML once HS2 is open have been broad brush assumptions made for the purposes of completeness in the economic appraisal. This report looks ahead in more detail to consider what services should operate on the existing rail network once HS2 is open. The aim is to help kick start the development of this wider strategy in which the benefits of HS2 are maximised, not just for those using the new line, but for travellers on the existing railway. The effective re-use of the capacity released by HS2 is a key project benefit. It will allow new local and regional passenger and new freight trains to operate: services that are and will continue to be prevented by network capacity constraints.
It is well worth reading the full document, even though it was written in 2011,, as I think it explains how HS2 could benefit those other than those, who want to get quickly between London and Birmingham.
Places With Better Services To And From London
The report singles out three areas, that could benefit from a freed-up West Coast Main Line between London and Birmingham.
It says that the following places.
- Walsall
- Shropshire
- Mid and North East Wales.
Could all gain new direct services to and from London.
Feeders To The West Coast Main Line
The report talks about how three new or improved lines and schemes will act as feeders to the services on a West Coast Main Line, that will have more capacity for semi-fast services, connecting London with Birmingham, Liverpool, Manchester and Scotland.
- The Croxley Rail Link will link Watford to a wide area of Hertfordshire and Buckinghamshire.
- The East-West Rail Link intersecting the WCML at Milton Keynes would improve services from a lot of the South Midlands and East Anglia.
- Improvements between Leamington and Nuneaton (Nuckle) would improve connections for Warwickshire.
These three schemes are now progressing and will be fully working by the time HS2 opens in 2026.
Chiltern Electrification
The three feeder schemes mentioned above all contain two ambitious words Chiltern Railways.
Consider the following.
- The Croxley Rail Link could and probably will be extended to Amersham via Rickmansworth.
- TheEast West Rail Link will deliver a Chiltern service from Marylebone to Milton Keynes via Aylesbury.
- The Greengauge 21 report talks of a Marylebone to Coventry service via Leamington and Kenilworth.
- Oxford to Milton Keynes will be electrified.
- Chiltern use some rather elderly but excellent diesel trains.
- Coventry, Milton Keynes and Watford are already electrified.
I can’t believe that there is not more talk about electrifying the Chiltern Railways network.
I don’t think that Chiltern Railways would need full electrification, if they were to use IPEMU technology in conjunction with some limited electrification.
Electrification is a future aspiration of Chiltern Railways and it could give a second 125 mph line between London and Birmingham.
This would mean that a much increased number of towns would have a high speed connection to both major cities and many places in between and North of Birmingham.
I think that enabling electric trains to use the Chiltern Main Line and the Snow Hill Lines, should be given a high priority.