How do you raise a 200 tonne masonry arch bridge by 900 mm, so that you can fit overhead electrification and freight trains with large containers under the bridge?

You used to call in Paul Daniels, but now he’s gone you have to use other forms of magic!

If finesse doesn’t work, you resort to the brute force technique that IK Brunel used to launch the Great Eastern – hydraulic power.

This article on the Freyssinet web site, describes how the bridge was lifted.

For an encore, the engineers then lowered the bridge by 465 mm.

Why raise a bridge like this?

Surely, to use a simple method, like explosives or a large hydraulic breaker and rebuild is a lot easier.

The trouble is it isn’t as this method disturbs the working railway much less and is quicker.

Network Rail also have five hundred bridges like this that need to be raised.

It would certainly make an interesting live stream from the Internet. Perhaps, a fee could be charged to watch for a charity like Cancer Research UK.

Brunel, who played the showman at times, would have approved of that!

 

December 8, 2016 - Posted by | Travel | , , ,

1 Comment »

  1. […] I wrote about the technique in Levitation Magic. […]

    Pingback by Is Electrification Of The Windermere Branch Line Really Necessary? « The Anonymous Widower | May 28, 2017 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s