Wires At Kirkham And Wesham Station – 17th April 2018
These pictures show Kirkham and Wesham station.
Note.
- Two new lifts are being installed.
- The overhead wires appear to be complete on the two main lines.
- The platform used by the Blackpool South Branch appears not to have been electrified.
Does anybody know if the line to Blackpool South station will be electrified?
- After all a four-coach bi-mode train like a Class 769 train could run the service.
- The last two Open Championships at Royal Lytham and St.Annes, were in 2012 and 2001, so it could return in the early 2020s.
But that gives the Blackpool area and Northern time to create the proper transport solution for the next Open at Royal Lytham and St. Annes.












[…] All platforms seem to be being electrified in the pictures I took during construction, that can be viewed in Wires At Kirkham And Wesham Station – 17th April 2018. […]
Pingback by Beeching Reversal – South Fylde Line Passing Loop « The Anonymous Widower | August 9, 2020 |