The Anonymous Widower

Wires At Poulton-le-Fylde Station – 17th April 2018

These pictures show Poulton-le-Fylde station.

Note.

  1. The station has been refurbished.
  2. The overhead wires appear to be complete.
  3. A lift has been installed.
  4. The cafe has reopened.
  5. The island platform is wide.
  6. There are a pair of proper clocks.

It is surely now one of the best stations in the country with a single island platform, serving both lines.

April 17, 2018 - Posted by | Travel | ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.