The Anonymous Widower

Should The Blackpool South Branch Be Electrified?

I can find nothing on the Internet, which states whether the branch line between Kirkham and Wesham and Blackpool South stations will or won’t be electrified.

However, I did get create this Google Map of Kirkham West Junction, where the lines to the two Blackpool stations divide.

Note.

  1. Kirkham and Wesham station is to the East.
  2. Blackpool North station is to the North-West.
  3. Blackpool South station is to the South-West.

This image was captured during the recent construction phase on the Blackpool Branch Lines.

As my train to Blackpool North on Monday afternoon passed the junction I took these pictures.

It looks to me, that the contractors are doing the following.

  • Improving the junction.
  • Laying some new track at the start of the branch line.
  • I also think, that the junction is being electrified.

The electrification could be for the following reasons.

  • It is the start of electrification of the branch.
  • Network Rail are providing an electrified turn-back facility at Krkham and Wesham station.
  • It could also be sensible future-proofing to make sure the branch can be electrified easily in the future.

If the branch is going to be worked by Class 769 trains or other bi-mode or battery powered trains, then I believe the work becomes clearer.

  • Trains from Blackpool South would have an electrified place, where they can change to electrical power and wait until the main lines are clear before crossing over to the Preston-bound track.
  • Trains to Blackpool South would be able to wait in Kirkham and Wesham station, until the line to Blackpool South was clear.
  • Trains to Blackpool South  could of course start their journey, as soon as the train from Blackpool South is waiting to cross over, using the new track, that is visible in my pictures.

The works will also create a very safe junction at Kirkham West.

The Blackpool South Branch 

The branch line has the following characteristics.

But there are other issues that should be considered.

Football At Bloomfield Road

If you are going to football at Bloomfield Road, as I have several times, Blackpool South is the closest station.

Blackpool Pleasure Beach

Blackpool Pleasure Beach has its own station, but there are reports on the Internet, that the walk between the station and the theme park needs to be improved.

An Increase In Capacty And Frequency

I once travelled between Colne and Blackpool South stations on a beautiful sunny day in early September.

  • Northern had laid on a pair of Pacers, working as a four-car train.
  • They were packed with families going for a day on the coast.

The conductor told me this often happens, when the weather is good.

When I passed through Preston station earlier in the week, I might have seen a notice, saying that the service between Colne and Blackpool South will run all week.

Passing Loops

There is no passing loop on the branch, so it makes it very difficult to run a more passenger-friendly two tph.

Until, the works at Kirkham West Junction are complete we probably won’t know if the junction is being designed, so that a train entering the branch could wait safely for a train to emerge from the branch.

But this would be more for reliable operations, than increasing frequency of trains.

The Open Championship At Royal Lytham And St. Annes

Ansdell and Fairhaven station is nearest to the course at Royal Lytham.

  • The Open Championship is a very important event on the golfing calendar.
  • Other important golfing events are also held on the course
  • Royal Lytham and St.Annes, last held the Open in 2012 and 2001. So it might come back to Royal Lytham in the mid-2020s.

Ansdell and Fairhaven station used to have two platforms, as described in Wikipedia.

The station was set out as an island platform with tracks on both faces until the singling of the line in the 1980s. Trains now only use the southern face. A disabled access ramp now covers the northern part of the station.

So could a rebuild of the station do the following?

  • Restore two platforms on an island at the station.
  • Put in full disabled access.
  • Create a passing loop.
  • Lomger platforms might be a good idea.

This Google Map shows the station.

Note.

  1. The disabled ramp winding away.
  2. The platform is probably about a hundred metres long.
  3. It would appear that there is space at the far end to extend the platform.

I suspect that an ambitious architect with vision, could design a station that met all objectives.

Rebuildng Of The Railway Between Skipton And Colne

The link between Skipton and Colne stations is promoted by SELRAP and has now been backed by the Government and large businesses like Drax, who say it would improve efficiency of biomass deliveries.

This map from Wikipedia shows the route.

Note that if the missing link is built, it does the following

  • Creates another much-needed route across the Pennines
  • Creates a second route between Leeds and Blackpool
  • Encourages visitors to the area.
  • Creates an easy link between Lancashire and the Settle and Carlisle Line.
  • Creates an alternative and faster freight route across the Pennines.

It could even become an iconic route famed for the scenery.

I feel that if this missing link were to be reinstated, it would be very well-used by passengers.

This increase in passengers would surely increase traffic between Colne and Blackpool South stations, means more pressure for two tph.

How Fast Could A Train Go Between Kirkham & Wesham and Blackpool South Stations?

Currently, the Class 142 trains take around 27-29 minutes to do the journey six intermediate stops.

Trains like a Class 769 train have improved performance.

  • They are being converted from Class 319 trains, that were built for high frequency commuter services.
  • The trains have two double-doors on each side of each of the four carriages.
  • Seat layout diagrams show the possibility of wide aisles and a lot of 2+2 seating.
  • They are faster, as the Class 142 trains have an operating speed of 75 mph and this article on Rail Magazine, says that the Class 769 trains can do 91-92 mph on diesel.
  • They have better acceleration and braking.
  • They can probably carry out stops much faster.

Newer trains built in the last couple of years will be even better.

Other factors will also speed up the service.

  • Level access between train and platform at all stations.
  • Relaying the track to allow higher operational speeds.
  • Modern signalling.
  • High-quality train driving and operation.

I am sure that the the time for a train to go from Kirkham and Wesham to Blackpool South and back will be substantially reduced.

But is it possible to do the trip in under thirty minutes, so that two tph will be possible?

Could Two Tph Be Run Between Preston and Blackpool South Without Electrification?

I believe that the Class 769 trains could be fast enough to run a two tph service on the Blackpool South branch, when passenger numbers say it is needed and track and station improvements have been completed.

An express shuttle could be provided for big events at Royal Lytham.

  • It would run between Preston and Blackpool South stations.
  • It would stop at Kirkham and Wesham and Ansdell and Fairhaven
  • The platforms at Ansdell and Fairhaven  and Blackpool South stations were to be lengthened to accept two Class 769 trains working as an eight-car train.

Network Rail would only need to lengthen two platforms and increase the operating speed of the line.

Effectively, by replacing a 1980s scrapyard special with a refurbished train of the same vintage and improving the track, the capacity of the Blackpool South Branch can be increased.

If some platforms were to be lengthened, it should be possible to run eight-car trains for events like the Open Championship at Royal Lytham.

Who needs electrification?

The Blackpool South Branch certainly doesn’t!

 

 

 

 

I

 

 

April 20, 2018 - Posted by | Transport/Travel | , , ,

4 Comments »

  1. Pacer in “preservation”
    https://www.urbanghostsmedia.com/2017/04/crashed-pacer-142059-manchester-victoria/

    Comment by Mark Clayton | April 21, 2018 | Reply

  2. Looking at the Colne to Skipton route, in Earby and Sough it looks like the tracked has been built on in places and it looks like A56 runs on part of the old route. Could be problematic re-opening evn though it could be a useful secondary route.

    Comment by mauricegreed | April 22, 2018 | Reply

  3. Have you read their web site.

    http://www.selrap.org.uk/index.html

    There’s a lot of solidity there and I can’t find much serious opposition.

    I think it could be one of those routes that attracts passengers, if it gets built and all forecasts are wrong.

    Comment by AnonW | April 22, 2018 | Reply

  4. […] Should The Blackpool South Branch Be Electrified?, I said this about improvements to Ansdell and Fairhaven […]

    Pingback by Beeching Reversal – South Fylde Line Passing Loop « The Anonymous Widower | July 28, 2020 | Reply


Leave a reply to Beeching Reversal – South Fylde Line Passing Loop « The Anonymous Widower Cancel reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.