The Anonymous Widower

LO ‘710s’ To Be Tested On ECML

The title of this post is the same as that of an article in Issue 851 of Rail Magazine.

After a period testing at the Old Dalby test track, the first Class 710 train will move to the East Coast Main Line.

I think this could be a pragmatic decision.

  • On the slow lines of the Southern part of the East Coast Main Line, there are typically four trains per hour (tph), which might be a low enough frequency for extra paths to be found for train testing.
  • Trains can access the East Coast Main Line from both the Gospel Oak to Barking and the North London Lines.
  • These lines give access to Willesden TMD, where some of the trains will be stabled.
  • The trains could be turned back at the sidings at Welwyn Garden City station.
  • The Class 710 trains are probably 90 mph units, which is faster than some of the older trains using the slow lines.

It will be interesting to see, where the testing is actually performed.

May 8, 2018 - Posted by | Travel | , , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.