Ealing Broadway Station – 19th April 2019
These pictures show Ealing Broadway station.
There’s still a lot of work to be done, to make the station, look like Crossrail’s image on the hoarding.
These are the proposed train frequencies at the station in the Off Peak, when Crossrail opens.
- Four trains per hour – Great Western Railway.
- Ten trains per hour – Crossrail.
- Six trains per hour – District Line
- Nine trains per hour – Central Line
There will be extra services in the Peak.
Crossrail To Reading In December 2019
As current rumours are that Crossrail will open in December to Reading, it looks like the station will be usable, if the architects have got the design right.
It is planned that Ealing Broadway station will have a Crossrail train every six minutes.
No comments yet.





Leave a comment