The Anonymous Widower

Crossrail Ltd Outlines Plan To Complete The Elizabeth Line

The title of this post is the same as this statement on the Crossrail web site.

These are a few points from the statement.

The Opening Date Of The Central Section

This is a sentence from the statement.

Crossrail Ltd has identified a six-month delivery window with a midpoint at the end of 2020. Crossrail will be making every effort to deliver the service as early as possible.

Does that meet some date between the 1st October 2020 and 31st March 2021?

And what will open on that date?

There is then this paragraph.

The central section of the Elizabeth line will open between Paddington and Abbey Wood and link the West End, the City of London, Canary Wharf and southeast London with initially 12 trains per hour during the peak.

Twelve trains per hour (tph) gives a capacity of 18,000 passengers per hour, which compares with the 36 tph and 31,500 passengers per hour of the Victoria Line.

Practically, this means that a twelve tph Crossrail could be carrying sixty percent of the number of passengers of the Victoria Line. It’s better than a kick in the teeth!

But then Dear Old Vicky is the Platinum Standard with lots of encrusted diamonds!

Bond Street Station

This is a sentence from the statement.

It is expected that all stations on the route will open except for Bond Street which is delayed because of design and delivery challenges.

The stations are designed so that trains can pass through, so this is not a problem.

Western Branch Services

This is a paragraph from the statement.

TfL Rail services between Paddington and Reading will commence in December 2019 with a frequency of 4 trains per hour in the peak. Testing of the signalling system continues to allow the new class 345 trains to be extended from Hayes & Harlington to Heathrow.

When Crossrail is fully open, the Western Branch frequencies are planned to be as follows.

  • Reading and Abbey Wood – 4 tph in the Peak and 2 tph in the Off Peak
  • Maidenhead and Abbey Wood – 2 tph all day
  • Heathrow Terminal 4 and Abbey Wood – 4 tph all day.
  • Heathrow Terminal 5 and Abbey Wood – 2 tph all day.

Currently, TfL Rail’s services are as follows.

  • Heathrow Terminal 4 and Paddington – 2 tph all day
  • Hayes & Harlington and Paddington – 2 tph all day

It appears that the two Hayes & Harlington services are designed and timed, so they can be extended to Heathrow Terninal 5, with trains leaving Paddington at these times.

  • XX:08 – Heathrow Terminal 4
  • XX:10 – Heathrow Terminal 5
  • XX:23 – Heathrow Terminal 4
  • XX:38 – Heathrow Terminal 4
  • XX:42 – Heathrow Terminal 5
  • XX:53 – Heathrow Terminal 4

Perhaps, if the signalling had worked as intended, we would now be seeing Class 345 trains working as follows.

  • Heathrow Terminal 4 and Paddington – 4 tph all day
  • Heathrow Terminal 5 and Paddington – 2 tph all day

Once the signalling works as needed and signed off in blood, sweat and tears, the difficult part of the job has been done.

The Reading and Maidenhead services could then be added to the mix. Especially, as no problems have been admitted or rumoured with running to these destinations.

These would mean twelve trains per hour in the Peak and ten trains per hour in the Off Peak needing to be handled at the London end of the Western Branch of Crossrail.

Paddington Station Or Central Tunnel?

The twelve tph in the Peak and ten in the Off Peak is an interesting frequency.

In If Crossrail Opens To Reading In December 2019, How Will It Terminate In Paddington?, I describe how Heathrow and Reading services at a frequency of twelve tph,  could run into Platforms 12 and 14 at Paddington.

This was my conclusion.

Platform 12 and 14 at Paddington could be converted into a two-platform Crossrail station handling seven-car Class 345 trains, at a frequency of twelve tph, with its own gate line.

I’ll ralso epeat this paragraph from the statement.

The central section of the Elizabeth line will open between Paddington and Abbey Wood and link the West End, the City of London, Canary Wharf and southeast London with initially 12 trains per hour during the peak.

Twelve tph in the Peak is the maximum frequency of the Western Branch into London.

Crossrail have designed a system, where trains can initially terminate in either Paddington or Abbey Wood stations.

Tp give themselves all options and get the Western Branch running, Crossrail would need to complete and certify the following.

  1. Get the signalling working to Heathrow.
  2. Make sure twelve tph could terminate in Paddington.
  3. Make sure twelve tph could run  through the tunnel between Royal Oak and Abbey Wood.

This would mean it would be possible to run twelve tph from Heathrow, Maidenhead and Reading in the West to either Paddington or Abbey Wood in London.

As twelve tph is only one train every five minutes, this surely could be run safely, once the three tasks above are complete and signed off.

Running A Split Service

This is said in the statement.

When the Elizabeth line opens the railway will operate as follows:

  • Paddington (Elizabeth line station) to Abbey Wood via Central London
  • Liverpool Street (main line station) to Shenfield
  • Paddington (main line station) to Heathrow and Reading

At a first look it appears to be a sensible plan.

  • All three services are independent of each other
  • Liverpool Street and Shenfield is working well and will carry on regardless as long as needed at six tph.
  • The Abbey Wood and Heathrow/Reading services can be run as two independent rail  services.

The following will also get a thorough testing.

  • Paddington (Elizabeth Line station)
  • The interchange tunnel between the Bakerloo Line and Paddington (Elizabeth Line station)
  • The important turnback facility at Royal Oak for trains turning in the Paddington (Elizabeth Line station)

The only problem, is that passengers will have to change trains at Paddington.

Running A Limited Preview Service In The Central Tunnel

Would it be possible to run a preview service in the Central Tunnel, after the following are tested and certified?

  • The turnback facility at Royal Oak
  • Paddington (Elizabeth Line station)
  • The intermediate stations.
  • The operation of trains in the tunnel at twelve tph.
  • Abbey Wood station.
  • The turnback facility at Abbey Wood.

A frequency of four or six tph may give the station systems a thorough testing.

Rolling Out The Full Service

This is a paragraph from the statement.

Once the central section opens, full services across the Elizabeth line from Reading and Heathrow in the west to Abbey Wood and Shenfield in the east, will commence as soon as possible.

I would assume stations and extra services will be added as soon as testing is complete and drivers and station staff are fully-trained.

Conclusion

The plan is good, as it allows these and other systems to be tested independently.

  • The signalling into Heathrow.
  • Twelve tph trains to and from Heathrow, Maidenhead and Reading.
  • Operation of the platforms in Paddington (main line station)
  • Operation of the turnback facility at Royal Oak
  • Operation of the platforms in Paddington (Elizabeth line station)
  • Handling of twelve tph and the signalling in the Central Tunnel.
  • Operation of the turnback facility at Abbey Wood.

I wouldn’t be surprised, that if all goes well, we may be seeing a very limited Crossrail service earlier than anybody currently thinks.

It would also appear to get the Western and Shenfield branches working independently to provide much needed, more frequent and quality services,.

These will then be joined by services in the Central Tunnel, which initially will be run independently.

As I said earlier a twelve tph Crossrail between Paddington and Abbey Wood through the Central Tunnel, would carry sixty percent of the passengers of the Victoria Line!

 

April 26, 2019 Posted by | Transport | , , , , , , , | 1 Comment

Will The Class 230 Trains Be Coming Home?

Long term readers of this blog, will notice, that I keep returning to the short Greenford Branch Line in West London.

  • It is four kilometres long
  • It runs between West Ealing and Greenford stations.
  • Greenford station is step-free and West Ealing station should be by December 2019.
  • There are three intermediate stations.
  • It is mainly double track, with a short length of single track at both ends.
  • Two trains per hour (tph) is provided by a single Great Western Railway (GWR) Class 165 diesel train.

It will be a valuable feeder route for passengers to and from Crossrail, which is rumoured to be opening to Reading in December 2019.

An opening of the Western branches of Crossrail between Paddington and Reading would bring the following services to West Ealing station.

  • Two tph between Paddington and Reading
  • Two tph between Paddington and Maidenhead
  • Four tph between Paddington and Heathrow Terminal 4
  • Two tph between Paddington and Heathrow Terminal 5

Two tph shuttling between West Ealing and Greenford is a bad match to the future ten tph on Crossrail.

Four tph Run Between West Ealing And Greenford Stations

This would obviously be ideal, but is it possible?

This Google Map shows West Ealing Junction, where the Greenford Branch joins the Crossrail tracks alongside the Great Western Main Line.

Note how the two tracks of the Greenford Branch Line start in the North-west corner of the map.

  • They join into a single-track, which passes under the footbridge.
  • The tracks then split a few metres to the East of the bridge.
  • The Northern track goes into the bay Platform 5 at West Ealing station, which must be over eighty metres long.
  • The Southern track joins the Crossrail line towards Paddington.

The track layout allows the ocassional refuse trains to pass along the Greenford Branch Line, but would also allow four tph to be run into the bay Platform 5.

This picture shows the current state of the under-construction step-free bridge at West Ealing station.

Once this bridge is complete, probably later this year, West Ealing station will be ready for four tph to Greenford.

The simplest safe operation would be for an incoming train to West Ealing station, to wait at Drayton Green station, until it was passed by the outgoing train. Once the points and the signals were set, the incoming train, would move into West Ealing station.

This Google Map shows the lines at the Greenford end of the Greenford Branch Line.

Note how the two tracks of the Greenford Branch Line start in the South-East corner of the map.

  • They join into a single track.
  • After a few metres, the tracks split into two.
  • The Western track dives under the Westbound Central Line and goes into the bay Platform at Greenford station.
  • The Northern track goes under both Central Line tracks and joins the Acton-Northolt Line.

It would appear that the track layout is designed so that four tph can work into Greenford station.

The Problem Of The Trains

The current Class 165 train works the line well.

  • A two-car train has enough capacity
  • At 45 metres long the train fits the short platform at Greenford station.
  • I estimate that in a month, the train does about 5,400 miles.

But as the only GWR diesel train, surrounded by large numbers of electric trains, the Class 156 train probably has to trundle some miles to be serviced.

In an ideal world, the train would have the following properties.

  • Less than fifty metres long.
  • Self-powered.
  • Ability to be serviced locally.
  • To run a four tph service, two trains and a spare would probably be needed

To look after the trains and hold the spare train, a convenient facility will be needed.

This Google Map shows the wider area around West Ealing station and West Ealing Junction.

Note the sidings between the Great Western Main Line, the Greenford Branch and the Plasser UK factory.

These sidings are where GWR stable some of their Class 387 trains.

But if the rumours are correct, that Crossrail is going to take over London to Reading services in December 2019, GWR will probably have less use for this facility.

It would surely, be an ideal mini-depot for the Greenford Branch Line fleet.

  • It is a secure site.
  • A refuelling facility could be provided, if necessary.
  • If a passenger service were to be started on the Brentford Branch Line, that is only a few miles away.

There may be a small amount of trackwork needed for efficient operation.

Did A Small Revolution Start In Bedford Yesterday?

In A First Ride In A Revenue-Earning Class 230 Train, I wrote about my ride in the first Class 230 train to enter public service.

This was the conclusion to my post.

It is a well-designed train, that impressed me.

It should find a niche in the train market.

The fact that the train is in service, will in itself provoke interest from train operating companies and Councils and other groups promoting new or reopened train services.

I wouldn’t be surprised to see more orders this year.

So will a small fleet of Class 230 trains be coming back to London, where they spent the first nearly forty years of their working lives?

  • The Class 230 train is the right size.
  • The Class 230 train is a quality train, with an interior, that can be tailored to the route.
  • Servicing can be organised locally.
  • Diesel or battery power is available.

A fleet of four trains would provide the following services.

  • Four tph on the Greenford Branch Line.
  • One or two tph on the Brentford Branch Line.

One train would be spare.

What Is The Likelihood Of A Passenger Service On The Brentford Branch Line?

Like the Greenford Branch Line, the Brentford Branch Line could be a valuable feeder line for Crossrail.

  • Hounslow Council have been pushing for a passenger service between Southall and a station at the Golden Mile (The Great West Road)
  • South of the Golden Mile, the original route can be seen on Google Map and there might be possibilities to extend it to the original terminus.
  • It would be in walking distance of a lot of development at Brentford Lock West.
  • Unfortunately, a new viaductwould need to be built over the Great West Road.

If the branch gets passenger trains, I estimate that one train could run a two tph service between Southall and Brentford Golden Mile.

New developments around Brentford could be what eventually makes adding passenger trains to this freight line worthwhile.

What About The Costs?

Transport for London is probably very happy with the current service on the Greenford Branch Line, as it is not their responsibility.

If Crossrail opens to Reading in December 2019, I suspect GWR will look at this leftover from privatisation as a increasing nuisance.

The Wikipedia entry for the Class 230 train has a section on Cost Comparison.

  • Using the figures for a Class 150 train, GWR are spending about 14,300 pounds a month, plus staff and fuel to provide the current service.
  • Three Class 230 trains providing a four tph service would cost an operator about 25,300 pounds a month, plus staff and fuel.

How much extra revenue for Transport for London, would a four tph service on the Greenford Branch Line generate, if Crossrail were to open to Reading?

An extra train for the Brentford Branch ine would probably add another 9,000 a month, plus staff and fuel.

I have no evidence, but after my ride yesterday, I feel that Class 230 trains could transform the economics of rail services in West Ealing and Brentford.

Conclusion

Bring a small fleet of Class 230 trains home!

And while you’re about it, reopen the Brentford Branch Line to passenger trains with an hourly service.

April 24, 2019 Posted by | Transport | , , , | 1 Comment

Platforms 10-14 At Paddington Station

This Google Map shows the Western end of Paddington station.

Note.

  1. In the top right hand corner of the map you can see the canal boats parked alongside the station.
  2. The light brown flat roof, would appear to be the roof of the London Underground station, which has two platforms and is served by the Circle and Hammersmith & City Lines.
  3. The thin platform pointing out from under the road bridge at the is probably the extension of the two Underground platforms, which are numbered 15 and 16.
  4. The next platform end which is wider, is platforms 12 and 14.

Now look at this picture taken by the end barrier on platform 15.

Note.

  1. The road bridge is over the top.
  2. Platform 14 is opposite, which is fitted with overhead electrification.
  3. The track for Platform 15, is the Westbound Underground line and has typical London Underground electrification.
  4. I think the signal gantry at the end of the platform can be seen on the Google Map.

The Google Map and my photo are two different views of the same area.

The Length of Platform 14

This article on Rail Engineer is entitled All Change At Paddington.

This is an extract, which is talking about Platform 14.

To extend the platform’s operational length to 164 metres, it had to be extended at both ends. On the London end, the buffer stop had already been moved by 11 metres, and that was all the room available. The country end had also been extended as much as possible.

164 metres is an interesting length.

The length of a four-car Class 387 train is just over eighty metres, so two working as a pair would fit Platform 14.

In Weight And Dimensions Of A Class 345 Train, I state that the length of a seven-car Class 345 train is 159.74 metres.

It looks like platform 14 can accept either of the electric trains that work the suburban services out of  Paddington.

The Length of Platform 12

Platform 12 is the other platform face of the island containing platform 14.

I took these pictures as I walked down the Underground platform.

I then left the Underground station and took these pictures on the island containing platforms 12 and 14.

Note that the train in Platform 12 is an eight-car Class 387 train, which is around 160 metres long.

The end of the train appeared to be about the same place as the end barriers on the Eastern end of the Underground platform.

As a S7 Stock train is 117.45 metres long, I estimate that the length of Platform 12 is almost 280 metres.

This picture was taken at the Eastern End of the platforms from behind the buffers.

As there is perhaps forty metres, between the buffer stop and the train, does that mean that Platform 12 and its neighbour; Plstform 11 are long enough to accommodate any of the following.

  • Up to four four-car Class 387 trains.
  • Two seven car Class 345 trains.
  • A Class 345 train at the maximum length of nine or ten cars.

Network Rail seem to have provided a lot of space for future services.

Conclusion

There is certainly enough space to run a Western Cossrail service to Reading. The space is available now, so it should be available in December 2019.

The only restriction would be that Platform 14 can only handle a seven-car Class 345 train.

 

 

 

 

April 21, 2019 Posted by | Transport | , , , , | Leave a comment

Bedwyn, Didcot Parkway And Oxford Services After Crossrail Opens To Reading

When Crossrail opens to Reading as it is rumoured with happen in December 2019, what will happen to the Great Western Railway (GWR) services to Bedwyn, Dicot Parkway and Oxford?

The Current Services

These services currently run to these destinations from London Paddington station.

  • Bedwyn station has an hourly service, that goes non stop between London and Reading and then calls at all stations between Reading and Bedwyn.
  • Didcot Parkway station has a two trains per hour (tph) stopping service, that stops at most stations, including those between Reading and Didcot Parkway.
  • Oxford station has a two tph fast service.
  • Reading station has a two tph stopping service, that stops at most stations.
  • The Didcot Parkway and Reading services give London and Reading a four tph electric service.
  • Other trains stop at important stations and there are some shuttle trains serving Reading, Didcot Parkway and Oxford.

Recent developments have included

  • Oxford and Bedwyn services now generally seem to run from the main station.
  • The fast Oxford services now run by Class 802 trains.

GWR are also testing running Class 802 trains to Bedwyn.

Future Services To Bedwyn

The turnback facility at Bedwyn station has been upgraded, so that it can take a five-car Class 802 train.

When some sighting and safety issues are settled, it is likely that Class 802 trains will take over services to Bedwyn.

  • Five-car bi-mode Class 802 trains will be used.
  • Trains will not stop between London and Reading.
  • Trains will stop at all station between Reading and Bedwyn.
  • Trains will run on electric power between London and Newbury.
  • Trains will run on diesel power between Newbury and Bedwyn.

Will the current seventy minute time be reduced by the faster trains, running at higher speed between London and Reading?

Battery Trains To Bedwyn

In Hitachi Plans To Run ScotRail Class 385 EMUs Beyond The Wires, I wrote about how batteries could be added to Class 385 trains, so they could run services without electrification.

Consider.

  • Class 802 and Class 385 trains are both both members of Hitachi’s A-Train family, sharing many features and systems.
  • Newbury to Bedwyn and back is about thirty miles.
  • Batteries could be charged between London and Newbury.

I very much feel that if Hitachi apply battery technology to the Class 802 trains, that Bedwyn could be an ideal test destination.

Extension Of Bedwyn Services To Marlborough

In A Station For Marlborough, I wrote about a local plan to open a new station in the twon of Marlborough, which would be on a single track branch, that leaves the main line to the West of Bedwyn.

Class 802 trains with a battery capability, would be the ideal trains for this extension.

Future Services To Oxford

GWR have started running bi-mode Class 802 trains to Oxford at a frequency of two tph

  • Services stop at Slough and Reading.
  • I have seen nine-car trains on this route.
  • Trains run on electric power between London and Didcot Parkway
  • Trains run on diesel power between Dicot Parkway and Oxford.

The service is augmented with a diesel shuttle between Oxford and Didcot Parkway.

  • This service runs at a frequency of two tph
  • One train every two hours is extended to Banbury.
  • This service is the only way to get to the intermediate stations of Appleford, Culham and Radley.

I very much feel that services between London and Oxford can be improved.

Four tph To Oxford

If train companies feel that Reading is worth four tph on Crossrail between the city and London, surely Oxford needs a four tph GWR service to the capital.

  • Two would be fast trains stopping only at Reading and Slough.
  • Two would stop at Slough and all stations between Reading and Oxford.
  • Bi-mode Class 802 trains would be used.
  • Trains run on electric power between London and Didcot Parkway
  • Trains run on diesel power between Dicot Parkway and Oxford.

Note.

  1. All intermediate stations would have a direct two tph service to London, Reading and Oxford.
  2. Currently, many journeys involve a long wait or a change at Didcot Parkway.

In addition, no station between Reading and Didcot Parkway gets a worse service than they do now, with the Class 387 trains to Didcot Parkway.

Battery Trains To Oxford

If Hitachi develop them, why not?

A Reading And Oxford Shuttle

I very much believe that important commuter routes need a frequency of four tph, as this enables a Turn-Up-And-Go service and encourage passenger numbers. Especially on a route like Reading and Oxford, where there is a lot of new housing being built.

If two tph are run between London and Oxford, stopping at all staions between Reading and Oxford, perhaps the way to give this service would be to run a shuttle between Reading and Oxford using bi-mode Class 769 trains.

  • A two tph shuttle would give four tph at all intermediate stations.
  • Trains would run on electric power between Reading and Didcot Parkway.
  • Trains would run on diesel power between Didcot Parkway and Oxford.
  • Some or all trains could be extended to Banbury.
  • I estimate that four trains would,d be needed for two tph.

Oxford would only be getting the quality of railway system a city of its size and standing needs.

Conclusion

There is a lot of scope to improve the train services in the Thames Valley, whether or no Crossrail takes over the Reading services.

 

 

April 21, 2019 Posted by | Transport | , , , , , | Leave a comment

When Crossrail Opens To Reading, Will Great Western Railway Have Too Many Class 387 Trains?

Currently, Great Western Railway has a fleet of 45 Class 387 trains

Twelve trains are currently being converted to Heathrow Express duties.

But if Crossrail takes over services between London and Reading, then their main use wuill have disappeared.

As Reading to Oxford is not fully-electrified, they can’t be used on this route, but both Class 802 and Class 769 trains can.

There may be used for trains on routes like.

  • Reading and Didcot Parkway
  • Reading and Newbury

But there won’t be opportunities to use thirty-three trains.

April 20, 2019 Posted by | Transport | , , , , , | 7 Comments

If Crossrail Opens To Reading In December 2019, How Will It Terminate In Paddington?

If you look at the Services in the Wikipedia entry for Crossrail, the services on the Western Branch are the following in trains per hour (tph).

  • Reading and Abbey Wood (5 stops) – Two tph in the Peak, None in the Off-Peak
  • Reading and Abbey Wood (12 stops) – Two tph all day
  • Maidenhead and Abbey Wood (10 stops) – Two tph all day
  • Heathrow Terminal 4 and Abbey Wood (6 stops) – Four tph all day
  • Heathrow Terminal 5 and Abbey Wood (6 stops) – Two tph all day

If these services terminate in Paddington station, then the station must be able to handle twelve tph in the Peak and ten tph at all other times.

Perhaps two platforms could be used as follows.

  • Reading and Maidenhead services handling six tph in the Peak and four in the Off Peak.
  • Heathrow Terminal 4 and Heathrow Terminal 5 services, handling six tph all day.

Or to give a bit of spare capacity and make it easier for passengers, three platforms could be used as follows.

  • Reading and Maidenhead services handling six tph in the Peak and four in the Off Peak.
  • Heathrow Terminal 4 services, handling four tph all day
  • Hesthrow Terminal 5 services, handling two tph all day

For convenience, services could terminate in the two Northernmost platforms 12,and 14. 13 hseems to have disappeared.

  • These platforms have their own short gate line.
  • They are on the same side of the station, as the slow lines that Crossrail will use to leave the station.
  • Platform 14 is 164 metres long, with platforms 11 and 12 longer.

Could these two platforms be turned into a self-contained Crossrail station?

  • Each platform could handle six tph.
  • I don’t think full-length nine-car Crossrail trains could be used, but seven-car trains could fit a 164 metre platform.
  • The lighting needs to be improved.
  • If these platforms could be used for exclusively for Crossrail, there would be no crossing of tracks outside the station involving Crossrail trains.
  • It would be convenient for passengers as they’d just go to the Crossrail station and through the gate.

But above all, there would not be a lot of work needed to create a Crossrail station.

Unless it was decided to make all platforms capable of handling full-length trains. But hopefully, it would only be needed for a couple of years.

Conclusion

Platform 12 and 14 at Paddington could be converted into a two-platform Crossrail station handling seven-car Class 345 trains, at a frequency of twelve tph, with its own gate line.

 

 

 

April 20, 2019 Posted by | Transport | , , , , , | Leave a comment

Crossrail’s Class 345 Trains Are Not Suburban Trumdlers

Over the last couple of days, I’ve had several trips on Class 345 trains, running to Hayes & Harlington station.

  • I found that I was able to time the trains at almost 80 mph in places.
  • They don’t seem to go this fast to Shenfield.
  • Wikipedia says the maximum speed of the trains are 90 mph.

I would not be surprised to see 90 mph cruising on some of the longer stretches between stations towards Reading.

This will surely mean that when Crossrail opens to Reading, the Crossrail service with all its stops might not be the slowest way to travel between Reading and London.

Consider.

  • Some Class 800 trains do the trip in as fast as 26 minutes.
  • Class 387 trains do the trip with eight stops in 56 minutes.
  • Most Crossrail Class 345 trains from Reading To Paddington will have fourteen stops.
  • In the Peak, two Class 345 trains in each hour, will take just five stops.

Although the Class 387 are modern trains, they probably don’t have the performance and certainly don’t have the digital signalling of the Class 345 trains.

I suspect that even with fourteen stops, the Class 345 trains will still do the journey in under an hour, when Crossrail is completed.

I suspect that many travellers between Reading and London will be changing their routes.

Crossrail To Reading In December 2019

It is rumoured that Crossrail will open to Reading in December 2019, with all services terminating at Paddington in Brunel’s station.

I believe that the Class 345 trains will be able to provide a high-capacity service between Paddington and Reading, which will complement the faster and mostly non-stop Great Western Railway services.

April 20, 2019 Posted by | Transport | , , , | Leave a comment

Hayes & Harlington Station – 19th April 2019

These pictures show Hayes & Harlington station.

It will be an important station.

  • There is still a lot of work to do for the station to look like the picture on the hoarding.
  • There are a lot of residential development in the area, including the conversion of an old office block, where I once worked to flats.
  • It will be a step-free interchange for local passengers from the West to Heathrow.

The station and the new bay platform are already fully operational.

Crossrail To Reading In December 2019

As current rumours are that Crossrail will open in December to Reading, it looks like the station will be usable.

It is planned that Hayes & Harlington station will have a train every six minutes.

April 20, 2019 Posted by | Transport | , , | Leave a comment

Southall Station – 19th April 2019

These pictures show Southall station.

The station still needs the new footbridge to be installed and lifts from the station buildings to the platforms.

It appears that there will be a Crossrail train every six minutes  all day in both directions.

The Missing Footbridge

This picture was taken on July 4th, 2016.

Note the footbridge across the station, that doesn’t appear in the pictures I took today.

This picture, that I took today, clearly shows blue barriers around places where the footbridge might be installed on the two island platforms.

Is it a replacement bridge over the station  being installed, or is it just a footbridge connecting the platforms?

Or could it be for both purposes?

Preparing For The Brentford Branch

This map from carto.metro.free.fr shows the layout of lines at Southall station.

Note.

  1. The pair of lines at the top  in blue are Crossrail
  2. The pair of lines in the middle are the fast lines.
  3. The single line going off to the East is the Brentford Branch Line, which has been proposed for reopening.

It would appear that the layout of the footbridge and the lifts would give good access to the Southernmost platform, which is connected to the Brentford Branch line.

So it looks like, that after the station has been refurbished and made step-free, connecting the Brentford Branch line would not be difficult.

As the Brentford Branch is only four miles long, a modern train like a Class 230, Class 710 or a Class 321 Hydrogen train,  could do two round trips per hour between Southall and Brentford stations.

Crossrail To Reading In December 2019

As current rumours are that Crossrail will open in December to Reading, it looks like the station will be usable.

It is planned that Southall station will have a train every six minutes.

April 19, 2019 Posted by | Transport | , , , | 1 Comment

Hanwell Station – 19th April 2019

These pictures show Hanwell station.

Hanwell station will be unlike any other station on Crossrail.

  • It is Grade II Listed.
  • It doesn’t have a high passenger usage.
  • Platforms will be too short for the Class 345 trains and selected door opening will be used.
  • The stairs up to the platforms must be some of the most Victorian in any station.
  • To complete the station, two lifts are to be installed on the Crossrail platforms.

I do wonder if it could become a tourist attraction for those interests in modern metros and Victorian architecture.

Crossrail To Reading In December 2019

As current rumours are that Crossrail will open in December to Reading, it looks like the station will be ready in all its Victorian splendour..

It is planned that Hanwell station will have a train every ten minutes.