The Anonymous Widower

‘710s’ Debut On Goblin

The title of this post is the same as an article in the July 2019 Edition of Modern Railways.

The article is mainly about the introduction of the Class 710 trains on the Gospel Oak to Barking Line.

But the last sentence of the article is worth more investigation.

On the West London Line, TfL is curremtly working with the Department for Transport on options for the devolution of services originally suggested in Chris Gibb’s report on the Govia Thameslink Railway franchise, which could lead to ‘710s’ being deployed here.

I investigate it fully in A London Overground Replacement For Southern’s East Croydon And Milton Keynes Service.

This was my conclusion.

At the present time and until better data is available, I think the replacement service should be as follows.

  • The Northern terminus should be Willesden Junction.
  • The Southern terminus should be West Croydon station, where there are good tram and train connections.
  • The route would be via Shepherds Bush, Kensington Olympia, West Brompton, Imperial Wharf, Clapham Junction, Wandsworth Common, Balham, Streatham Hill, West Norwood, Gipsy Hill, Crystal Palace and Norwood Junction.
  • Going via Gipsy Hill, rather than the current route via Selhurst, would give access to the connectivity at Norwood Junction.
  • The frequency should be four tph.
  • Trains will be four- or five-car Class 710 trains.

The benefits would be as follows.

  • The rail hubs of Clapham Junction, Norwood Junction, West Croydon and Willesden Junction would be connected together by a Turn-Up-And-Go service.
  • The proposed four tph service would need eight Class 710 trains, whereas the current one tph service needs eight Class 377 trains. Would this be better value?

In the future with a connection to High Speed Two in the Old Oak Common area, the benefits would increase.

  • There would be a simple interchange with High Speed Two.
  • South London from Clapham to Croydon, would get a direct service to High Speed Two.
  • There would also be a better connection to Heathrow Airport and other rail services through Old Oak Common.

I think that the connection to High Speed Two trumps everything else.

I will keep returning to this vital link down thw West London Line.

 

 

 

 

 

 

 

 

 

 

June 30, 2019 - Posted by | Transport | , , , , , , , , , ,

3 Comments »

  1. We have already seen what happens when responsibility for rail outside Greater London is transferred to TfL: –

    https://en.wikipedia.org/wiki/Croxley_Rail_Link is now pretty much dead an buried.

    Comment by R. Mark Clayton | July 1, 2019 | Reply

    • I’m riding between Clapham Junction and East Croydon on a Southern service. A lot of passengers got out at Clapham, but it’s pretty empty now!

      Comment by AnonW | July 1, 2019 | Reply

    • The Croxley Rail Link will be built, but in a very different form.Like this service, that I’m on, there isn’t the demand.

      Comment by AnonW | July 1, 2019 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.