The Anonymous Widower

Is A Crossrail For Leeds On The Way?

This article on Insider Media is entitled Schemes Totalling More Than £140m Backed By Investment Committee.

This is introductory paragraph.

Schemes totalling more than £140m to support the region’s recovery from the Covid-19 pandemic, have have been backed by West Yorkshire Combined Authority’s Investment Committee.

These are the two main schemes.

A £24.2m million (including £17m Combined Authority funding) rail station between Morley and Cotttingley on the Transpennine route at White Rose/

A 31.6m (including £13.9m of Combined Authority funding) parkway rail station at Thorpe Park on the Leeds to York section of the route.

There are also several other schemes for West Yorkshire.

White Rose Station

This Google Map shows the White Rose Centre.

The Huddersfield Line runs North-South alongside the Centre and there must be plenty of space for a new White Rose station.

From Wikipedia and other sources, the following seems to be on the agenda for the station.

  • Two platforms.
  • Ability to take six-car trains, with a possibility to extend to eight-cars.
  • Two trains per hour (tph) in both directions.
  • Up to 340,000 passengers per year.
  • Lots of parking.

The station would be about 3.5 miles to the South-West of Leeds station.

Thorpe Park Station

This Google Map shows the area where the station could be built.

Note.

  1. The Selby Line curving across the Northern side of the map.
  2. Cross Gates station is the next station to the West.
  3. Going East on the Selby Line, you pass through Garforth, East Garforth and Micklefield stations before the line divides for York to the North and Selby and Hull to the East.
  4. The M1 Motorway passing to the East of Leeds.

Other features of the proposed station and the area include.

  • Wikipedia says that the station will have two island platforms and the ability to handle inter-city trains.
  • The route through the station would be electrified.
  • High Speed Two could be routed to go close to the station.
  • Lots of parking.

The station would be about 4 miles to the East of Leeds station.

A Crossrail For Leeds

Could these two stations in the future become stations on a high-capacity route across Yorkshire centred on Leeds?

  • The Western end of the route could be Huddersfield.
  • The Eastern end of the route could be both York and Hull.
  • Plans exist and projects have started to fully electrify between Huddersfield and York.
  • Both stations will be Park-and-Ride stations with good connections to the motorway network.
  • Intermediate stations between Leeds and Huddersfield could include Cottingley, White Rose, Morley, Batley, Dewsbury, Ravensthorpe, Mirfield and Deighton
  • Intermediate stations between Leeds and York could include Cross Gates, Thorpe Park, Garforth, East Garforth, Micklefield, Church Fenton and Ulleskelf.
  • Intermediate stations between Leeds and Hull could include Cross Gates, Thorpe Park, Garforth, East Garforth, Micklefield, South Milford, Selby, Wrassle, Howden, Eastrington, Gilberdyke, Broomfleet, Brough, Ferriby and Hessle.

With the exception of the two new stations and the electrification, infrastructure needs would not appear to be large.

These are some thoughts.

Distances And Timings

These are some distances and estimated timings from Leeds.

  • Huddersfield – 27 miles – 32 minutes – 51 mph
  • Hull – 52 miles – 55 minutes – 57 mph
  • York – 15,5 miles – 23 minutes – 40 mph

Note.

  1. With full electrification, timings could be improved.
  2. York and Huddersfield would be under an hour.
  3. Kull and Huddersfield could be under ninety minutes.

These timings would certainly be achievable by a 125 mph Class 802 train, but I suspect, that they could be achieved by a 110 mph electric train like a Class 730/1 train.

Current Services Through White Road, Leeds and Thorpe Park Stations

These services currents pass through the three stations or their proposed sites.

  • TransPennine Express – Liverpool Lime Street and Edinburgh
  • TransPennine Express – Liverpool Lime Street and Scarborough
  • TransPennine Express – Manchester Airport and Newcastle
  • TransPennine Express – Manchester Airport and Redcar Central
  • TransPennine Express – Manchester Piccadilly and Hull

Note.

  1. All of these trains are one tph.
  2. There could be five quality tph on the route, most of which would be five-car Class 802 trains.

In addition the following services would pass through Leeds and Thorpe Park stations.

  • CrossCountry – Plymouth and Edinburgh/Glasgow
  • Northern Trains – Blackpool North and York via Bradford Interchange
  • Northern Trains – Halifax and Hull via Bradford Interchange
  •  

Note.

  1. All of these trains are one tph.
  2. Two trains serve Bradford Interchange.

These services could mean eight tph between Thorpe Park and Leeds stations.

In addition the following services would pass through Leeds and White Rose stations.

  • Northern Trains – Wigan Wallgate and Leeds
  • TransPennine Express – Huddersfield and Leeds

Note.

  1. All of these trains are one tph.

These services could mean seven tph between White Rose and Leeds stations.

A Possible Future Service

I believe that services across Leeds could be recast to give the City a network of railways that would satisfy the needs of the City.

Possible services could include.

Four tph – York and Huddersfield via Thorpe Park, Leeds and White Rose in under an hour.

Two tph – Hull and Huddersfield via Thorpe Park, Leeds and White Rose in under ninety minutes.

Two tph – Halifax and Thorpe Park via Leeds and Bradford

Note

  1. There are a lot of possibilities.
  2. Services would be timed to make interchange easy with other services at Leeds.

I would also arrange for East to West and West to East services to share the same island platform at Leeds.

Conclusion

Leeds will get the electrified local railway the city deserves.

February 14, 2021 - Posted by | Transport | , , , , , ,

3 Comments »

  1. Ludicrous sums of money for a new station or am i missing something?

    Comment by Nicholas Lewis | February 15, 2021 | Reply

  2. The £149 million is for two fair sized stations and lots of other schemes, if you read the full article.

    Comment by AnonW | February 15, 2021 | Reply

    • Yeah i read it but 31m for a two platform station with a footbridge and a couple of lifts and a station booking office is silly money. Don’t know what happened to NR’s modular station approach for cheap stations. The industry needs to get a grip on costs otherwise its going to take years to build out all the aspirations various regional bodies have.

      Comment by Nicholas Lewis | February 15, 2021 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.