The Future At Shenfield Station
There is an article on Rail Technology Magazine, which describes how Network Rail completed £14.5 million preparations for Crossrail over the bank holiday.
This is one of the comments by Andrew Gault, which describes the operation of Shenfield station after Crossrail opens.
Plus the new new bay platform (Platform 6) at Shenfield is soon to be built and once the new Platform 6 at Shenfield is built and opened then Crossrail Elizabeth Line trains will use Platforms 5 and 6 as a terminus with Platform 4 being used for Abellio Greater Anglia’s Southend Victoria trains to stop on Platform 4 freeing up Platform 3 for Semi-Fast trains and Stopping Commuter trains to Ipswich, Braintree, Colchester, Clacton-on-Sea and Intercity trains passing through Shenfield towards Norwich and Ipswich and yes Shenfield will see more passengers using Crossrail Elizabeth Line once the full service is in operation in late 2019/early 2020 and same with Abbey Wood, Reading, Maidenhead and Heathrow Airport.
Is Mr. Gault indicating that some or all fast Ipswich and Norwich trains will stop at Shenfield?
If he is correct, then it will certainly make getting to Portman Road for Tuesday Night matches a lot easier for me.
[…] In The Future At Shenfield Station, I reprinted some comments, which said that Shenfield will become an important interchange. […]
Pingback by Are Crossrail Developing A Philosophy For Linking With Other Lines? « The Anonymous Widower | September 30, 2016 |