Sometimes You Win Slow
Announcements on the East West Rail Link, haven’t exactly come thick and fast, the last one being the route of the section between Bedford and Cambridge, that I talked about in Is Cambridge University Being Pragmatic About The East West Rail Link?, was published in March 2016.
This article on Mix96 is entitled Winslow’s Station Is One Step Closer.
This is said.
Now a station for the town is one step nearer as Bucks County Council has paid £900,000 for a site to build it.
That looks like nine hundred thousand small steps to me.
Winslow station is to be built to the North-West of the town and this Google Map shows the location.
The lower black scar contains a rusty single-track and is all that remains of the original Varsity Line
When open the station will have two services.
- London Marylebone to Milton Keynes Central via Aylesbury, Winslow and Bletchley
- Reading-to Bedford via Oxford, Winslow, Bletchley and possibly Milton Keynes Central.
Wikipedia talks about opening one train per hour on both services in 2019.
No comments yet.

Leave a comment