The Anonymous Widower

First Train Tries Out New Northern Line Extension Track

The title of this post is the same as this article on IanVisits.

Ian says this.

The very first train has travelled on the extension of the Northern Line to Nine Elms and Battersea.

Two new junctions which will connect the extension to the existing Northern Line have now been completed, and the first train to travel over them was photographed on New Year’s Day.

As other reports say that more track will be installed, I wonder how far the train actually went!

 

January 14, 2018 Posted by | Transport | , | Leave a comment

How To Recycle A Station

Hanborough station on the Cotswold Line in Oxfordshire in being expanded.

Wikipedia says this, about theplans announced in 2016.

Plans were announced to increase services from Hanborough Station, by Great Western Railway. A launch event was held in Witney, at which GWR’s managing director Mark Hopwood said that the investment needed was £275 million. Double tracking would be reinstated between North Oxford and Long Hanborough and two disused platforms reopened. The local constituency MP and Prime Minister David Cameron told delegates at the meeting ” am utterly convinced of the necessity of investing in this line. I will do everything I can to give this vision a boost.”

This article on IanVisits, is entitled How Crossrail’s Legacy Could End Up In Rural Oxfordshire.

The article describes how the temporary station at Abbey Wood station, during Crossrail construction.

My picture comes from a post called Crossrail Build A Temporary Station.

The station buildings that could go to Hanborough are on the right behind the fence.

January 14, 2018 Posted by | Transport | , , , | 1 Comment