In this article on Transport for the North, which is entitled Northern Powerhouse Rail Progress As Recommendations Made To Government, one of the recommendations proposed for Northern Powerhouse Rail is significant upgrades and journey time improvements to the Hope Valley Line between Manchester and Sheffield.

I shall look at a few of the possibilities for the route.

Northern Powerhouse Rail’s Objective For The Route

Wikipedia, other sources and my calculations say this about the trains between Manchester and Sheffield.

  • The distance between the two stations is 42.6 miles
  • The current service takes 49 to 57 minutes and has a frequency of two trains per hour (tph)
  • This gives an average speed of 52.2 mph for the fastest journey.
  • The proposed service with Northern Powerhouse Rail will take 40 minutes and have a frequency of four tph.
  • This gives an average speed of 63.9 mph for the journey.

This last figure of 63.9 mph, indicates to me that a 100 mph train will be able to meet Northern Powerhouse Rail’s objective.

Current Trains On The Hope Valley Line

In July this year, I went along the Hope Valley Line between Manchester Piccadilly and Dore and Totley stations, which I wrote about in Along The Hope Valley Line – 13th July 2020.

My train was a pair of refurbished Class 150 trains.

These trains can handled the current timetable but they have an operating speed of only 75 mph.

Looking at Real Time Trains for last week, it now appears that Northern are using new three-car Class 195 trains.

These are much better.

  • They are 100 mph trains with much better acceleration.
  • The train was still running the timetable for the slower trains.

With thirteen stops, I suspect that these new trains could be under fifty minutes between Manchester and Sheffield.

Will The Hope Valley Line Be Electrified?

Consider.

  • Currently, the Hope Valley Line is electrified between Manchester Piccadilly and Hazel Grove stations.
  • In the future, the line is likely to be electrified between Sheffield and Dore & Totley stations, in conjunction with rebuilding the Midland Main Line, to the North of Clay Cross North junction for High Speed Two.
  • After the electrification at the Eastern end, just over thirty miles will be without electrification.
  • The Hope Valley Line has an operating speed of 90 mph.

This Hitachi infographic shows the specification of the Hitachi Regional Battery train.

As these are a 100 mph train with a range of 90 km or 56 miles on battery power, these trains could work Manchester and Sheffield in the required time of forty minutes. provided they could be charged at the Sheffield end of the route.

TransPennine’s Class 802 trains can be fitted with batteries to become Regional Battery Trains, so it would appear that TransPennine’s services on this route could go zero-carbon.

In addition Northern, who are the other passenger operator on the route are working with CAF on battery electric trains, as I wrote about in Northern’s Battery Plans,

I don’t believe there are pressing reasons to electrify the Hope Valley Line to allow passenger trains to meet Northern Powerhouse Rail’s objective.

Will Operating Speed On The Hope Valley Line Be Increased?

Under Plans in the Wikipedia entry for the Hope Valley Line, this is said.

Network Rail, in partnership with South Yorkshire ITA, will redouble the track between Dore Station Junction and Dore West Junction, at an estimated cost of £15 million. This costing is based on four additional vehicles in traffic to deliver the option, however, this will depend on vehicle allocation through the DfT rolling stock plan. This work will be programmed, subject to funding, in conjunction with signalling renewals in the Dore/Totley Tunnel area.

Other proposals include a 3,600 feet (1,100 m) loop in the Bamford area, in order to fit in an all-day (07:00–19:00) hourly Manchester–Sheffield via New Mills Central stopping service, by extending an existing Manchester–New Mills Central service. Planning permission for this was granted in February 2018, but delays mean that this will now not be completed until 2023.

These changes to allow three fast trains, a stopping train and freight trains each hour were also supported in a Transport for the North investment report in 2019, together with “further interventions” for the Northern Powerhouse Rail programme.

It would also probably be a good idea, to increase the operating speed of the line to 100 mph where possible.

Effect On Passenger Services

100 mph trains on a track with an operating speed of 100 mph, could show some impressive timings.

On the Great Eastern Main Line, which is a very busy 100 mph double-track railway, 100 mph trains, achieve a 77 mph average for 90 minutes over the 115 miles, between London Liverpool Street and Norwich with a single stop.

A one-stop Manchester and Sheffield service at this speed would take just 33.2 minutes.

The stopping trains would be more of a challenge to get under forty minutes, but at least if they were battery electric trains, they’d have the better acceleration and deceleration of the electric trains.

  • Fifty minutes would be a realistic time.
  • Ten minutes turnround time at each end, would be ideal for charging the batteries and give an efficient two hour round trip.

Efficient timetabling could create a very comprehensive service for the Hope Valley Line.

Freight Trains On The Hope Valley Line

Under Freight in the Wikipedia entry for the Hope Valley Line, this is said.

Over a million tons of cement a year is taken away by rail from Earle’s Sidings at Hope.

That is a very large number of freight trains, all of which are currently hauled by diesel locomotives.

  • Looking at Real Time Trains, there are nearly always two freight trains in every hour of the day.
  • If you look at the routes, they go to a myriad number of destinations.
  • Following the routes between Dore Junction and the quarries to the South of the Hope Valley Line, there are several tunnels.
  • There are numerous quarries in a cluster, all served by their own rail lines.

Electrifying the delivery of the cement and limestone from the quarries would be a large and very expensive operation.

This Google Map shows Earle’s Sidings at Hope.

Perhaps a half-way house solution would be to use diesel to haul trains between the quarries and Earle’s sidings, where the locomotive is changed for an electric one?

  • But that would then mean that all routes from between the Peak District quarries and their destinations would need to be fully-electrified.
  • It should be noted that that the problem of zero-carbon trains, also exists at port and rail freight interchanges, where safe operation with 25 KVAC overhead wires everywhere can be a nightmare.
  • Rail freight companies are unlikely to change their old diesel locomotives for new expensive electric locomotives, until all possible routes are fully electrified.
  • It is also a big problem, all over the world.

Perhaps, what is needed is a self-powered zero-carbon locomotive with sufficient power to haul the heaviest trains?

I believe such a locomotive is possible and in The Mathematics Of A Hydrogen-Powered Freight Locomotive, I explored the feasibility of such a locomotive, which was based on a Stadler Class 68 locomotive.

The zero-carbon locomotive, that is eventually developed, may be very different to my proposal, but the commercial opportunities for such a locomotive are so large, that I’m sure the world’s best locomotive designers are working on developing powerful locomotives for all applications.

Conclusion

Northern Powerhouse Rail’s ambition for Manchester and Sheffield via the Hope Valley Line is simply stated as four tph in forty minutes. But this may be something like.

  • Three fast tph in forty minutes.
  • One stopping tph in perhaps fifty minutes.
  • One freight tph in each direction to and from the quarries that lie to the South of the line.

I didn’t realise how close that the line is to that objective, once the following is done.

  • Introduce 100 mph passenger trains on the route.
  • Improve the track as has been planned for some years.

Note that all the passenger trains, that now run the route; Class 185, 195 and 802 trains, are all 100 mph trains, although they are diesel-powered.

With a length of just under 43 miles, the route is also ideal for battery electric trains to work the passenger services, be the trains be from Hitachi, CAF or another manufacturer, after High Speed Two electrifies the Midland Main Line to the North of Clay Cross North Junction, in preparation for high speed services between London and Sheffield.

I would recommend, that one of High Speed Two’s first Northern projects, should be to upgrade the Midland Main Line between Clay Cross North junction and Sheffield station to the standard that will be required for High Speed Two.

I would also recommend, that the Government sponsor the development of a hydrogen electric locomotive with this specification.

  • Ability to use 25 KVAC overhead or 750 VDC electrification
  • 110 mph operating speed on electrification.
  • Ability to use hydrogen.
  • 100 mph operating speed on hydrogen.
  • 200 mile range on hydrogen.

A locomotive with this specification would go a long way to decarbonise rail freight in the UK and would have a big worldwide market.

Project Management Recommendations

This project divides neatly into three.

  • Perform the upgrades at Dore Junction and add the loop in the Bamford area, as detailed in Wikipedia, which will increase the capacity of the Hope Valley Line.
  • Electrify the Midland Main Line between Clay Cross North junction and Sheffield, as will be needed for High Speed Two. This electrification will allow battery electric trains to run between Manchester and Sheffield and between Sheffield and London.
  • Procurement of the trains. CAF and Hitachi are currently finalising suitable designs for this type of operation.

It would also be helpful, if the freight trains could be hauled by zero-carbon hydrogen electric locomotives, to create a much-improved zero-carbon route between Manchester and Sheffield.

 

 

 

 

 

November 23, 2020 - Posted by | Hydrogen, Transport/Travel | , , , , , , , , , , , , , , , ,

5 Comments »

  1. […] The electrification at Sheffield would allow battery electric trains to work between Manchester and Sheffield as I outlined in Northern Powerhouse Rail -Significant Upgrades And Journey Time Improvements To The Hope Valley Rout…. […]

    Pingback by Northern Powerhouse Rail – Connecting Sheffield To HS2 And On To Leeds « The Anonymous Widower | November 24, 2020 | Reply

  2. […] Significant upgrades and journey time improvements to the Hope Valley route between Manchester and Sheffield. Read more… […]

    Pingback by Northern Powerhouse Rail Progress As Recommendations Made To Government « The Anonymous Widower | November 30, 2020 | Reply

  3. NR is starting work on this during this month https://www.networkrailmediacentre.co.uk/news/passengers-urged-to-plan-ahead-of-major-railway-improvements-on-hope-valley-line

    Comment by Peter Robins | November 1, 2022 | Reply

  4. I think Network Rail are very loathe to give completion dates. If you take the electrification of the short Gospel Oak to Barking Line, it was delayed because they found an old unmarked sewer in Walthamstow. I have seen reports like this in the media many times. There is a serious problem with the documentation of our Victorian railway builders.

    Comment by AnonW | February 15, 2023 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: