No Progress On The Gospel Oak To Barking Line
I was talking to a station guy on the Gospel Oak to Barking Line yesterday and he told me, it will be two weeks before the new Class 710 trains start running.
He indicated that the Class 378 trains don’t fit the route, which I do find strange, as the Class 710 and Class 378 trains should eventually be sharing the North London Line.
According to Wikipedia widths of the trains are as follows.
- Class 172 – 2.69 m.
- Class 378 – 2.80 m.
- Class 315 – 2.82 m.
By comparison a Class 345 Aventra is 2.78 m.
Perhaps that twenty millimetres is critical!.
But the guy had a point, when he suggested the line should have had a slightly larger gauge,, as it might have been possible to run a few redundant Class 315 trains on the route.
A couple of weeks ago, I heard a rumour that the Class 717 trains didn’t fit the tunnels into Moorgate.
It sounds like there has been a lack of people, who can read a tape measure.
January 22, 2019 - Posted by AnonW | Transport/Travel | Class 378 Train, Class 710 Train, Class 717 Train, Gospel Oak And Barking Line, Northern City Line
3 Comments »
Leave a reply to mauricegreed Cancel reply
This site uses Akismet to reduce spam. Learn how your comment data is processed.
About This Blog
What this blog will eventually be about I do not know.
But it will be about how I’m coping with the loss of my wife and son to cancer in recent years and how I manage with being a coeliac and recovering from a stroke. It will be about travel, sport, engineering, food, art, computers, large projects and London, that are some of the passions that fill my life.
And hopefully, it will get rid of the lonely times, from which I still suffer.
Why Anonymous? That’s how you feel at times.
Charities
Useful Links
Top Posts
- Jamie Oliver's Fish Pie
- Where Should You Travel On An Elizabeth Line Train?
- Elizabeth Line - Paddington Bakerloo Line Link - 24th May 2022
- Back To The Future With BYD Double-Deck Buses
- Trump's View On Gluten-Free-Food
- The Automatic Splitting And Joining Of Trains
- Pedestrian Tunnels In London's Transport System
- Leeds Station And The New Entrance
- A Station For Marlborough
- The Edmonton Incinerator
WordPress Admin
-
Join 1,883 other subscribers
Archives
Categories
- Advertising Architecture Art Australia Banks Battery-Electric Trains BBC Buses Cambridge Coeliac/Gluten-Free Construction COVID-19 Crossrail Death Decarbonisation Design Development Docklands Light Railway Driving East Coast Main Line Electrification Elizabeth Line Energy Engineering Entertainment Floating Wind Power Flying Football France Freight Germany Global Warming/Zero-Carbon Good Design Gospel Oak And Barking Line Greater Anglia Great Western Railway Heathrow Airport High Speed Two Highview Power Hydrogen-Powered Trains Innovation Internet Ipswich Town King's Cross Station Law Liverpool London London Overground London Underground Manchester Marks and Spencer Network Rail New Stations Offshore Wind Power Olympics Phones Politics Project Management Religion Research Scotland Shopping Solar Power Stations Step-Free Stroke Television Thameslink The Netherlands Trains United States Walking Weather Wind Power Zopa
Tweets
Tweets by VagueShot
One f**k up after another.
Comment by mauricegreed | January 23, 2019 |
On the Goblin they also measured the gantries wrongly and missed a sewer.
Sounds that better surveying might have avoided a few mistakes.
Comment by AnonW | January 23, 2019 |
London Overground MD staff update regarding Gospel Oak To Barking Line 378 & 710,
Comment by Jimmy Jones | January 25, 2019 |