Could Class 387 Trains Help Out On The Gospel Oak To Barking Line?
This tweet was on the Goblin Users Twitter Account this morning.
We are trying to persuade
@TfL to approach@c2c_Rail to hire in some Class 387s for weekend services, even just on Saturdays would help.@c2c_Rail have 6xClass 387s and they are not used at weekends.
It’s an interesting thought.
- They are very good trains.
- Class 387 trains are four-car Electrostars and many are dual-voltage, if that is needed.
- The Gospel Oak to Barking Line needs three more trains for a full service, after the departure of the Class 172 trains.
- In addition to c2c, they are used by Great Northern and Great Western.
But at 110 mph, are they over-powered for the Gospel Oak to Barking Line?
But what would happen if TfL Rail were to take over services between Paddington and Reading?
- Would this release some of Great Western’s Class 387 trains?
- Great Western are updating twelve trains for Heathrow Express.
I do think that there could be three trains with no place to go because of the late-running electrification of the Great Western Main Line.
January 31, 2019 - Posted by AnonW | Transport/Travel | Class 387 Train, Gospel Oak And Barking Line, Great Western Railway
4 Comments »
Leave a reply to Mark Clayton Cancel reply
This site uses Akismet to reduce spam. Learn how your comment data is processed.
About This Blog
What this blog will eventually be about I do not know.
But it will be about how I’m coping with the loss of my wife and son to cancer in recent years and how I manage with being a coeliac and recovering from a stroke. It will be about travel, sport, engineering, food, art, computers, large projects and London, that are some of the passions that fill my life.
And hopefully, it will get rid of the lonely times, from which I still suffer.
Why Anonymous? That’s how you feel at times.
Charities
Useful Links
Top Posts
- Jamie Oliver's Fish Pie
- The Automatic Splitting And Joining Of Trains
- Where Should You Travel On An Elizabeth Line Train?
- Pedestrian Tunnels In London's Transport System
- The Spitfire Gate At Spitalfields Market
- Stratford Station Secures Funding For Plans Set To Relieve Overcrowding
- Onward To Newbiggin-by-the-Sea For The Northumberland Line?
- Extending The Elizabeth Line – Piccadilly Line To Ealing Broadway
- Could The Gospel Oak To Barking Line Be Extended To Ealing Broadway?
- The Lizzie Line And Circle/District Line Interchange At Paddington - 1st July 2022
WordPress Admin
-
Join 1,883 other subscribers
Archives
Categories
- Advertising Architecture Art Australia Banks Battery-Electric Trains BBC Buses Cambridge Coeliac/Gluten-Free Construction COVID-19 Crossrail Death Decarbonisation Design Development Docklands Light Railway Driving East Coast Main Line Electrification Elizabeth Line Energy Engineering Entertainment Floating Wind Power Flying Football France Freight Germany Global Warming/Zero-Carbon Good Design Gospel Oak And Barking Line Greater Anglia Great Western Railway Heathrow Airport High Speed Two Highview Power Hydrogen-Powered Trains Innovation Internet Ipswich Town King's Cross Station Law Liverpool London London Overground London Underground Manchester Marks and Spencer Network Rail New Stations Offshore Wind Power Olympics Phones Politics Project Management Religion Research Scotland Shopping Solar Power Stations Step-Free Stroke Television Thameslink The Netherlands Trains United States Walking Weather Wind Power Zopa
Tweets
Tweets by VagueShot
The trouble in letting TfL take over railway network around London is that the Mayor is responsible for it and given the electorate then rolling stock, service, fares and even paths would tend to be optimised for commuters within Greater London at the expense of those who live outside – one only has to look at the outer reaches of the Met’ – low frequency, high fares, improvements delayed or cancelled etc.
Comment by Mark Clayton | January 31, 2019 |
A lot of TfL’s problems at the present are because the Mayor promised a fare freeze, if he were to be elected. The Goblin is a scheme that has been mainly funded by Central Government. The problems now are caused by software problems on the new trains, so TfL is having to scratch around looking for suitable trains.
One of the national problems we have is that there is no fleet of suitable trains to use in emergencies. Direct Rail Services will supply two Class 68 locomotives and some clapped out coaches, but what is needed is perhaps ten Class 769 trains or similar, that can run on most lines to be used in the following circumstances.
Late electrification – As in Manchester-Preston
Late delivery of trains – As in Todmorden or the Goblin
Testing new services
Filling in for level crossing accidents – As in East Anglia and Lincolnshire.
Providing extra trains in emergencies – As in Workington
Providing extra trains for big events – As in Glastonbury or the Open
Rail replacement trains
It sounds like a business that Rail Operations Group will be looking at.
Comment by AnonW | January 31, 2019 |
One advantage of using spare C2C trains at weekends is that there is a direct connection from C2C to GOBLIN at Barking Station making it possible to run a train from East Ham Depot to Tilbury branch at Barking which could then reverse and run onto GOBLIN .
It’s worth remembering that the 387s used by C2C operate as Fixed formation 12 carriage trains and their internal layout with plenty of seats many with tables may not be suitable for short distance services .
Could C2C 357s be used as these are used as 4 carriage trains ?
Comment by Melvyn | January 31, 2019 |
I feel that as they only need three trains, something will be found.
On the other hand Bombardier could find a temporary solution to getting the 710s running! Perhaps with an on-board technician! They probably want to be the heroes, so are probably pulling out all the stops!
Comment by AnonW | January 31, 2019 |