Northern Powerhouse Rail – A New Line Between Manchester And Leeds Via The Centre Of Bradford

In this article on Transport for the North, which is entitled Northern Powerhouse Rail Progress As Recommendations Made To Government, one of the recommendations proposed for Northern Powerhouse Rail is a new rail line between Manchester and Leeds via the centre of Bradford.

I shall look at a few of the possibilities for various sections of the route.

Current And Proposed Timings Between Manchester And Leeds

These are the current typical timings between Manchester Victoria and Leeds stations.

  • 55 minutes for 43 miles, which is an average speed of 47 mph.

With Northern Powerhouse Rail, a time of 25 minutes is the objective, which is an average speed of 103.2 mph.

  • As my helicopter flies it is just 35.7 miles, so a 25 minutes journey time would require an average speed of 85.7 mph.

It is obvious that a new much straighter line is needed with an operating speed of at least 100 mph.

One of the best 100 mph lines in the UK  is the Great Eastern Main Line between Liverpool Street and Norwich.

  • It is generally only double-track.
  • The fastest services take 90 minutes for the 115 miles, which is an average speed of 77 mph.
  • It is a busy line with lots of suburban services closer to London and freight trains to and from Felixstowe.

But even a line built to the standard of the Great Eastern Main Line wouldn’t be good enough for Northern Powerhouse Rail’s objective of 25 minutes.

The mathematics tell me, that a new line is needed, built as straight as possible between Manchester and Leeds.

High Speed Two’s Approach To Manchester

This map clipped from High Speed Two’s interactive map, shows the route of High Speed Two as it approaches Manchester Piccadilly station.

The colours of High Speed Two indicate the type of construction.

  • Black is a bored tunnel. Only in the South East corner, where it continues to Manchester Airport.
  • Purple is a tunnel portal.
  • Brown is a track between retaining walls. Used through Manchester Interchange or Airport station.
  • Red is a viaduct.
  • Orange is a box structure

This Google Map shows a similar area.

Are High Speed Two serious about demolishing a large area of Manchester to the North and East of Manchester Piccadilly station?

  • It will cause massive disruption all over the centre of Manchester.
  • How many businesses will be ruined by this plan?
  • How many residents are there in the area?
  • How will trains from the new platforms at Piccadilly station continue to Bradford, Huddersfield, Leeds and Sheffield?
  • Mrs. Merton could have said “Let’s all have a reverse!” And she’d have been joking!
  • You can’t go through the new platforms, as that would mean demolishing most of Manchester City Centre.

What High Speed Two are proposing is complete and utter rubbish!

In Whither HS2 And HS3?, which I wrote in May 2015, I said this.

I do think though that our designs for HS2 are rather dated and don’t take things that are happening or have happened into account.

Crossrail in London has shown that putting a large twin rail tunnel under a major city, is not the problem it once was. Crossrail have also been very innovative in creating stations with the minimum disturbance to existing infrastructure. As an example, the new Whitechapel station for Crossrail has also used a technique called uphill excavation, where you create escalator and lift shafts upwards from the tunnels, rather than traditionally from the surface, which is much more disruptive.

These techniques can revolutionise the construction of HS2.

Take cities like Birmingham, Leeds, Manchester, Newcastle and Sheffield, which have developed and are continually developing extensive local rail, tram and bus networks. So why are we in Birmingham still talking about creating an HS2 station at Curzon Street? Surely, we just dig a very deep pair of HS2 tunnels under the city and then uphill excavate into not only New Street, but Moor Street and Snow Hill as well. The tunnels would be only made as long as necessary, although the underground station could be very large. But it probably wouldn’t be much bigger than the enormous double-ended Liverpool Street/Moorgate station being created for Crossrail.

The great advantage of this method of construction is that you can continue to develop your network of local trains, trams and other transport links, untroubled by the construction of the new station deep below. Anybody, who thinks this is not possible, should spend half-an-hour walking around Whitechapel station, where the Hammersmith and City, District and East London Lines are passing untroubled over the giant hole and through the building site for the new station.

To some the example of Crossrail in London, would not be a good one, as Crossrail is years late. But the tunnelling under London and the excavations for the stations have gone well and were delivered on time.

In the related post, I went on to propose a double-ended underground station in Manchester with connections to both Piccadilly and Victoria stations. It could even have other connections to locations in the City Centre like Piccadilly Gardens.

There’s certainly space for a stylish entrance at the busy tram and bus interchange.

By applying the lessons learned in the building of Crossrail and other projects like Stuttgart 21, which I wrote about in Stuttgart Hauptbahnhof, I’m sure that a massive underground station in Manchester could be built successfully, on time and on budget.

I am not alone in thinking this way. In The Rival Plans For Piccadilly Station, That Architects Say Will ‘Save Millions’, I write about a plan from world-class architects Weston Williamson, who designed the superb new London Bridge station.

This visualisation from Weston Williamson, shows their proposed station.

Note.

  1. In the visualisation, you are observing the station from the East.
  2. The existing railway lines into Piccadilly station are shown in red.
  3. Stockport and Manchester Airport are to the left, which is to the South.
  4. Note the dreaded Castlefield Corridor in red going off into the distance to Oxford Road and Deansgate stations.
  5. The new high speed lines are shown in blue.
  6. To the left they go to Manchester Airport and then on to London, Birmingham and the South, Warrington and Liverpool and Wigan, Preston, Blackpool, Barrow-in-Furness, the North and Scotland.
  7. To the right, they go to Huddersfield, Bradford, Leeds, Hull and the North East, and Sheffield, Doncaster and the East.
  8. Between it looks like  a low-level High Speed station with at least four tracks and six platforms.
  9. The Manchester Mretrolink is shown in yellow.
  10. The potential for over-site development is immense. If the Station Square Tower was residential, the penthouses would be some of the most desirable places to live in the North.

This station would enable improvements to rail services in the North and Scotland.

  • It would be a through station, to allow East to West services, like Liverpool and Hull.
  • Fewer services would have to reverse.
  • All services using the underground station, that went to the West would serve Manchester Airport.
  • TransPennine services like Liverpool and Edinburgh and Liverpool and Scarborough, would use the station and also call at Manchester Airport.
  • TransPennine services like Glasgow and Manchester Airport could be extended to Leeds and Hull.
  • TransPennine services would not need to use the overcrowded Castlefield Corridor.
  • All existing services to the main section of the existing Piccadilly station, could continue operation as now, during the construction and operation of the underground station. Some would eventually be replaced by high speed services using the underground station.

Manchester Airport would have one of the best train services of any airport in the world. It would certainly be on a par with Schiphol.

Careful alignment of the tunnels under Manchester, could also ease the building of the new line between Manchester and Leeds.

Huddersfield And Westtown (Dewsbury)

The only part of an upgraded TransPennine route between Manchester and Leeds, that is in the planning and design phase and visible to the public, is the upgrade between Huddersfield to Westtown (Dewsbury), which is described on this page of the Network Rail web site. This is the introductory paragraph.

We’re proposing an upgrade to a section of railway between Huddersfield and Westtown (Dewsbury) to deliver passenger benefits along the TransPennine railway.

Network Rail provide this very useful map.

This article on Rail Technology Magazine is entitled Network Rail Reveals Detailed £2.9bn Upgrade Plans For TransPennine Route, which gives the major details of the upgrade.

  • Improvement between Huddersfield and Westtown
  • Grade separation or a tunnel at Ravensthorpe
  • Rebuilding and electrification of eight miles of track.
  • Possible doubling the number of tracks from two to four.
  • Improved stations at Huddersfield, Deighton, Mirfield and Ravensthorpe.

This project would be a major improvement to the Huddersfield Line, but I have one problem with this project. – It doesn’t go anywhere near Bradford.

This Google Map shows Bradford, Leeds, Brighouse and Dewsbury.

Note.

  1. Bradford is in the North-West corner of the map, with the red arrow marking Bradford Royal Infirmary.
  2. Leeds is in the North-East corner of the map.
  3. Brighouse is in the South-West corner  of the map.
  4. The red arrow at the bottom of the map marks Dewsbury and District Hospital, with the towns of Morley and Dewsbury to the East.

The route Network rail are improving goes South-Westerly from Leeds and through both Morley and Leeds, before turning to the West and then going South to Huddersfield.

I am left with the conclusion, that Network Rail’s plans may do wonders for travel between Leeds and Huddersfield, but they don’t do anything for Bradford.

But the plans will have positive effects on travellers between Leeds and Manchester.

Eight Miles Of Electrification

Eight miles of electrification may not seem much, but to a Hitachi Regional Battery train, travelling at speed it is a few minutes to add some charge to the batteries, especially if the train stops at Dewsbury and/or Huddersfield stations.

This Hitachi infographic gives the specification for the Hitachi Regional Battery train.

Note.

  1. It has a range of 90 km or 56 miles on battery power.
  2. It can travel at up to 100 mph on battery power.
  3. TransPennine’s Class 802 trains can be converted to Regional Battery trains, by simply swapping the diesel engines for battery packs.

If these trains fully-charged their batteries on the eight miles of electrification, they could do the following.

  • Going East they could easily reach Leeds, which is under ten miles from Dewsbury station. At a pinch they could even reach York, which is thirty-five miles from Dewsbury.
  • Going West they could reach Manchester, which is twenty-six miles from Huddersfield station. At a pinch, they could just about reach Liverpool, which is fifty-seven miles from Huddersfield.

Note that North of York and West of Manchester are both fully electrified.

This eight miles of electrification would enable the following.

  • Several of TransPennine Express services run by Class 802 trains to become all-electric services.
  • Other operators like Northern could use battery electric trains for stopping services along the route.
  • It might even enable some freight trains to run through the area, with hybrid power.

It looks to me, that Network Rail have chosen this section to electrify, so that it gives a lot of benefit to battery electric trains.

Will Services Be Faster Between Huddersfield And Leeds?

I estimate the the straightened track, the better acceleration of electric trains and other improvements would save up to perhaps ten minutes.

Timings between Manchester and Leeds, would probably be around 45 minutes, which is nowhere near Northern Powerhouse Rail’s objective of 25 minutes

The Problem Of Bradford

Bradford has two central stations; Bradford Interchange and Bradford Forster Square. which have no connection between them.

This Google Map shows the two stations.

It is an area crowded with buildings between the two stations.

There is a Wikipedia entry called Bradford Crossrail, where this is said about the reasons for the two stations.

These stations were built in the nineteenth century by different railway companies with an individual, rather than a comprehensive plan for rail development in the city.

The Wikipedia entry also says this about Northern Powerhouse Rail and the city.

The Northern Powerhouse Rail project has also mooted a project to link Leeds and Manchester with a through route at Bradford. Whilst this would either involve a bypass line south of the city and a parkway station at Low Moor or a new route tunnelling through the city centre, neither option mentions connecting the lines from both north and south of the city together.

I will look at the two solutions to connect Northern Powerhouse Rail to the City.

Low Moor Station

The diagram shows the connections between Bradford Interchange, Bradford Low Moor, Huddersfield and Leeds stations.

It would appear that if a connection were to be made between Low Moor and New Pudsey stations. that could be a solution.

This Google Map shows where the lines to Huddersfield and Leeds join outside Bradford Interchange station.

Note,

  1. Bradford Interchange station is to the North.
  2. Bradford Low Moor station is to the South.
  3. New Pudsey station is to the East.

I suspect it would be possible to create a curve that allowed trains to go between  Bradford Low Moor and New Pudsey stations, but I doubt it would be a fast route.

A Bradford Tunnel

This would be the bold option, where all sorts of routes could be possible.

  • It could go under the City Centre in such a way, that it had pedestrian connections to both current stations and important places with a large number of visitors.
  • It could connect to Huddersfield in the West and Leeds in the East.
  • It might even loop under the City Centre, as the Wirral Line does under Liverpool.

A tunnel under the City, would be my preferred solution.

A Tunnel Between Manchester And Leeds

So far, various people or organisations have advocated the following tunnels on the route.

  • High Speed Two are proposing a tunnel between Manchester Airport and Manchester City Centre.
  • Weston Williamson are proposing a Manchester High Speed station underneath Manchester Piccadilly station.
  • A tunnel has been proposed to connect to Bradford City Centre.

I feel strongly, that a tunnel can be built under the Pennines to link Manchester and Leeds.

Rail Tunnels through the Pennines have been dug before, notably at Standedge, Totley and Woodhead.

I answered the question in detail in Will HS2 And Northern Powerhouse Rail Go For The Big Bore? and this was the conclusion of that post.

I believe that my naïve analysis in this post shows that a TransPennine tunnel is possible.

But I believe that the right tunnel could have one big advantage.

Suppose it was built to handle the following.

    • A capacity of eighteen tph, which is the same as High Speed Two.
    • An operating speed of 140 mph or more. The Gotthard Base Tunnel has a maximum operating speed of 160 mph.
    • High Speed Two’s Full-Size trains.
    • The largest freight trains

It would be future proofed for longer than anybody could envisage.

There are also other smaller advantages.

    • It would by-pass a lot of difficult areas.
    • It would cause very little aural and visual disruption.
    • IIf it were designed with care, it would not affect the flora and fauna.
    • As with the Swiss tunnel, it could be dug level, which would save energy and allow trains to run faster.
    • It could be running twelve tph between Leeds and Manchester Airport via Bradford, Huddersfield and Manchester Piccadilly.
    • Existing surface railways at the Eastern end could serve Cleethorpes, Darlington, Doncaster, Edinburgh, Hull, Middlesbrough, Newcastle, Scarborough, Sheffield and York
    • Existing surface railways at the Western end could serve Barrow, Blackpool, Carlisle, Chester, Glasgow, Liverpool. North Wales, Preston and Wigan.

It would be more like Thameslink for the North turned on its side, rather than Crossrail for the North.

Would such a TransPennine tunnel be realisable?

Consider.

  • 3D design software has improved tremendously over the last decade.
  • The Swiss have shown that these long tunnels can be built through solid rock.
  • There is plenty of space to put the tunnel.
  • It doesn’t have to be one continuous tunnel.
  • It might be possible to built it as a base tunnel, which would be low down and level between two valleys on either side of the Pennines.

I think there could be a lot of flexibility on how the tunnel would be designed and built.

Conclusion

A Manchester and Leeds tunnel via Bradford, could be one of the boldest projects ever undertaken in the UK.

I believe that we have the capabilities to build it.

Project Management Recommendations

This is a large project that will take several years.

  • But the Swiss have dug the Gotthard Base Tunnel of a similar size through solid rock in recent years.
  • It would be a political symbol to the North, that Government is serious about levelling up.
  • In thirty years or so, it won’t be found to have been built with inadequate capacity.

Other projects, such as the Huddersfield and Westtown Improvement wukk old the fort, whilst the tunnel is built.

 

November 22, 2020 - Posted by | Transport/Travel | , , , , , , , , , , , ,

17 Comments »

  1. Lots of good stuff at https://www.nextstopbradford.com/

    Comment by Matthew | November 23, 2020 | Reply

    • Thanks!

      Comment by AnonW | November 23, 2020 | Reply

    • yeah, thanks, Matthew, I wasn’t aware of that either. Looks like they’re proposing a third station for the city centre all within a small area, as in Birmingham. Curiously enough, I was just looking at that area on the map yesterday, and thinking that would be a better place for an NPR station than out at Low Moor or wherever.

      Comment by Peter Robins | November 23, 2020 | Reply

  2. This new document from TfN doesn’t really get us any further; it basically just repeats what’s in their previous proposals. I think we have to wait and see what the Integrated Rail Plan suggests. If you want a fast line between Manchester and Bradford/Leeds, I don’t think there’s any alternative to a tunnel.

    Comment by Peter Robins | November 23, 2020 | Reply

  3. The Greengauge 21 publication “Revisiting High Speed North” makes an interesting read

    http://www.greengauge21.net/revisiting-high-speed-north/

    as does the linked pdf (35 pages)

    Comment by Fenline Scouser | November 23, 2020 | Reply

  4. Whilst fully in favour of the Piccadilly through station as referenced in your post and in the Greengauge 21 proposal I do remember making comment on a previous post regarding cancellation of the 70s Picc -Vic scheme.

    It was widely reported that “secret” cold war era bunker/GPO construction lay below Piccadilly Gardens/Plaza and would impede construction of the route. I have never seen any reference to the extent or depth of the facility but I do wonder whether it might remain a project blocker.

    Comment by Fenline Scouser | November 23, 2020 | Reply

    • I remember you saying about it.

      They might be able to go under or around it. The tunnel could be dug very deep.

      In Liverpool, the sandstone would make it easy. I wonder what the soil is like in Manchester?

      It could be very wet, with all the rain!

      Comment by AnonW | November 23, 2020 | Reply

  5. Small point re. Huddersfield – Dewsbury scheme. The extremely detailed pdf downloads at Network Rail site (specifically pdf 3 OLE) states electrification to continue beyond Dewsbury to Leeds.

    Comment by Fenline Scouser | November 24, 2020 | Reply

    • This is probably sensible for two reasons.

      Operationally, it must be better and save a few minutes.

      But also, it probably means they don’t have to provide an electrical connection for the overhead wires at Dewsbury and can borrow the power from Leeds.

      Comment by AnonW | November 24, 2020 | Reply

      • It also strikes me that given the gradient profile there must be considerable potential for “return to the wire” energy savings.

        Comment by Fenline Scouser | November 24, 2020

    • the detailed maps though only show electrification to Westtown. AIUI, electrification of the entire route is planned as part of the upgrade, but they’re doing it in stages. The main objective is to improve journey times, and clearly there’s no point electrifying before track realignments or whatever. The section from Holbeck through Leeds to Neville Hill is already wired, and Church Fenton-Colton is also underway. I went from Newcastle to Newton le Willows in September on one of TPE’s bi-modes, and was disappointed to find they didn’t make use of the electric in Leeds. The bi-mode diesel engines are no doubt less polluting than old trains, but even so it would be better not to pump fumes into the station. The transitions in York and Victoria were very smooth though.

      Comment by Peter Robins | November 24, 2020 | Reply

  6. I agree, but feel it is more likely, that the power will be stored on batteries on the train.

    That actually saves money with the electrification, as it only has to handle current going one way.

    I’m fairly certain that Aventras do it that way.

    Comment by AnonW | November 24, 2020 | Reply

  7. Those who believe that all lines should be electrified, often forget that to get the highest benefit, you often need to upgrade and relay the track first. Also relaying the track often finds problems like sewers and old mine working, that were not on any surveys.

    The Hitachi trains can raise and lower the pantograph and on real time trains, you can find changeovers in the middle of nowhere.

    If Leeds and Huddersfield is electrified, all of TransPennine Class 802 services could run without diesel if batteries were fitted to the trains. They’re going to regret buying the Mark 5 coaches.

    Comment by AnonW | November 24, 2020 | Reply

  8. […] A new line to be constructed from Manchester to Leeds via the centre of Bradford. Read more… […]

    Pingback by Northern Powerhouse Rail Progress As Recommendations Made To Government « The Anonymous Widower | November 30, 2020 | Reply

  9. It wouldn’t make sense for the Gothard Base crossing to use trains with batteries on the tunnel section and overhead wires on the overground section. Wouldn’t pollution of the tunnels be a an issue.

    I believe that the whole UK network North of the Thames needs to be electrified, just as with the Southern network. The Swiss have got it right.

    Comment by Clive Broadhead | February 10, 2021 | Reply

  10. various press reports today on Bradford’s plans for the new station, on the St James Market site just to the SE of the current Interchange station https://www.bbc.co.uk/news/uk-england-leeds-56485346

    Another development is that NR have started work on preparing for electrification of Victoria-Stalybridge section of TPU. https://www.networkrail.co.uk/news/rail-engineering-upgrades-continue-in-manchester/

    Comment by Peter Robins | March 22, 2021 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: