The Anonymous Widower

£14m Peak District Rail Freight Extension Unveiled

The title of this post is the same as that of this article on Rail Technology Magazine.

I discussed this project in full in Peak District Freight Sidings Get £18m Network Rail Boost, where I showed this Google Map of the sidings at Buxton, where the stone trains must reverse.

This latest Google Map, which is to a more detailed scale and 3D, clearly shows the lengthened sidings alongside the Manchester-Buxton Line.

Note the footbridge across the lines appears in both maps.

Conclusion

It looks to me that Network Rail have managed to implement this freight project to bring more stone out of the Peak District by train.

As the cost of the completed project is quoted as less than the figure quoted before the project started., the project could even have been completed within the budget.

This has been a project when £18million has been spent for these benefits.

  • Each train will transport 2,500 tonnes of materials.
  • Each train will take 76 lorry loads from the roads.
  • Less trains will be needed to transport the same tonnage.

How many other small projects like this could be undertaken?

 

 

 

April 30, 2019 - Posted by | Transport | , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.