The title of this post, is the same as that of an article in the July 2019 Edition of Modern Railways.

This is an extract.

Current estimates gave a cost range of between £1.3 billion and £3 billion, which Mr. Williams said depended on whether services shared tracks with existing Southeastern services east of Abbey Wood or had their own segregated tracks.

Mr. Williams is Transport for London’s Direct of City  Planning; Alex Williams.

This Google Map shows Northfleet and Ebbsfleet stations.

Note.

  1. The large Ebbsfleet International station towards the bottom of the map.
  2. Northfleet station on the North Kent Line in the North East corner of the map.
  3. The two stations are about five hundred  metres apart as the  crow flies.

There has been a lot of pressure in the past to build a pedestrian link between the two stations, as reported by the Wikipedia entry for Northfleet station.

The station is very close to Ebbsfleet International station (the NNE entrance is only 334 yards (305 m) from Northfleet’s station), but passengers (using public transport) will find it far easier to access Ebbsfleet International from Gravesend or Greenhithe, as these stations are more accessible and offer easy access to Fastrack bus services. The walking route between the two stations is 0.6 miles (1 km) or 0.8 miles (1.3 km) and a suitable pedestrian link has not been built because of funding issues and objections from Land Securities.

Why when Ebbsfleet International station was built in the early 2000s for opening in 2007, was a pedestrian link not built between the two stations?

How much did omitting the link save?

Luton Airport are building the Luton DART, which is a people mover to  connect Luton Airport Parkway station with the airport.

  • It is 1.4 miles long.
  • It is fully automated.
  • It might have an extra station serving the mid-stay parking.
  • It appears to be taking three years to build.

All of this very comprehensive system appears to be costing around £200 million.

I doubt that a simple pedestrian link, like a bridge with travelators,  would have cost more than a few tens of million pounds.

To me, it is one of the great mysteries of the building of the Channel Tunnel Rail Link, that this pedestrian link wasn’t built.

I think, in future, we could come to regret that it wasn’t built along with the rest of Ebbsfleet International station in the early 2000s.

The extension of Crossrail to Ebbsfleet is about the following.

  • Creating a high-frequency railway to serve all the new housing developments in the Thames Gateway and along the South Bank of the Thames.
  • Connecting  Ebbsfleet International station and other developments around the station to Crossrail.

In some ways, these two objectives are incompatible.

  • To serve the housing developments along the river, the Crossrail extension needs to run roughly along the route of the North Kent Line.
  • To serve Ebbsfleet International station, the route needs to be further inland.

Choosing either route is going to annoy people who live on the other.

For this reason, I feel we need a good old-fashioned British compromise or some very-radical thinking.

Current Services Along The North Kent Line

I shall start by looking at current services on the North Kent Line.

Thameslink – Luton And Rainham (Kent)

A Thameslink service

  • Two trains per hour (tph)
  • South of the Thames, the service calls at London Bridge, Deptford, Greenwich, Maze Hill, Whatcombe Park, Charlton, Woolwich Arsenal, Plumstead, Abbey Wood, Slade Green, Dartford, Stone Crossing, Greenhithe for Bluewater, Swanscombe, Northfleet, Gravesend, Higham, Strood, Rochester, Chatham and Gillingham.
  • Eight-car Class 700 trains work the route, which have a 100 mph operating speed.
  • The service calls at Northfleet for a possible interchange with services running from Ebbsfleet International station
  • The service calls at Abbey Wood for interchange with Crossrail.

If there needed to be more capacity on this service, I suspect Thameslink could run twelve-car trains.

Southeastern – London Charing Cross And Gravesend

A Southeastern Metro service.

  • Two tph
  • Calls at Waterloo East, London Bridge, New Eltham, Sidcup, Bexley, Crayford, Dartford, Stone Crossing, Greenhithe for Bluewater, Swanscombe and Northfleet
  • The service calls at Northfleet for a possible interchange with services running from Ebbsfleet International station.
  • The service calls at Gravesend for interchange with Southeastern HighSpeed services between St. Pancras International station and North-East Kent, East Kent and soon-to-be East Sussex.
  • Class 465 trains work the route, which have a 75 mph operating speed.

This picture shows a train for Gravesend in London Bridge station.

My feeling, is that the service would be improved by modern 100 mph trains, as these antique slow-coaches must restrict the speed of faster trains.

Southeastern – London Cannon Street And Dartford Loop Line

A Southeastern Metro service.

  • Four tph in both directions.
  • Calls at London Bridge, Deptford, Greenwich, Maze Hill, Westcombe Park, Charlton, Woolwich Dockyard, Woolwich Arsenal, Plumstead, Abbey Wood, Belvedere, Erith and Slade Green.
  • Two tph return to Cannon Street via Crayford and Sidcup and two tph return to Cannon Street via Barnehurst and Bexleyheath.
  • The service calls at Abbey Wood for a planned interchange with Crossrail.
  • Class 465 trains work the route.

As I said with the previous service, these 75 mph trains need replacing with 100 mph trains.

Southeastern – London Charing Cross And Dartford

A Southeastern Metro service.

  • Two tph
  • Calls at Waterloo East, London Bridge, Lewisham, Blackheath, Charlton, Woolwich Dockyard, Woolwich Arsenal, Plumstead, Abbey Wood, Belvedere, Erith and Slade Green.
  • The service calls at Abbey Wood for a planned interchange with Crossrail.
  • Class 465 trains work the route.

As I said with the two previous services, these 75 mph trains need replacing with 100 mph trains.

Southeastern – London Victoria And Dover

A Southeastern Mainline service.

  • Two tph
  • Calls on the North Kent Line at Rochester, Chatham, Gillingham and Rainham.
  • Class 465 trains work the route.

As I said with previous services, these 75 mph trains need replacing with 100 mph trains.

Southeastern – London Victoria And Ramsgate

A Southeastern Mainline service.

  • One tph
  • Calls on the North Kent Line at Rochester, Chatham, Gillingham and Rainham.
  • Class 465 trains work the route.

As I said with previous services, these 75 mph trains need replacing with 100 mph trains.

Southeastern – London St. Pancras And Faversham

A Southeastern HighSpeed service.

  • One tph
  • Calls at Stratford International, Ebbsfleet International, Gravesend, Strood, Rochester, Chatham, Gillingham, Rainham and Sittingbourne.
  • The service calls at Ebbsfleet International for an interchange with Continental services.
  • Class 395 trains work the route, which have a 100 mph operating speed on lines electrified using a third-rail.

This picture shows a Class 395 train at Gravesend station.

East of Ebbsfleet International, this service can be considered a 100 mph local train, that gets slowed by the 75 mph services.

Southeastern – London St Pancras International Loop Service

A Southeastern HighSpeed service.

  • One tph
  • Calls at Stratford International, Ebbsfleet International, Gravesend, Strood, Rochester, Chatham, Gillingham, Rainham, Sittingbourne, Faversham, Whitstable, Herne Bay, Birchington-on-Sea, Margate, Broadstairs, Ramsgate, Sandwich, Deal, Walmer, Martin Mill, Dover Priory, Folkestone Central, Folkestone West, Ashord International, Ebbsfleet International and Stratford International.
  • The service calls at Ebbsfleet International and Ashford International for an interchange with Continental services.
  • Class 395 trains work the route.

East of Ebbslfleet International, this service can be considered a 100 mph local train, that gets slowed by the 75 mph services.

Southeastern – London St Pancras International And Ramsgate

A Southeastern HighSpeed service.

  • One tph
  • Calls at Stratford International, Ebbsfleet International, Ashford International, Canterbury West, Ramsgate and Broadstairs
  • The service calls at Ebbsfleet International and Ashford International for an interchange with Continental services.
  • Class 395 trains work the route.

East of Ashford International, this service can be considered a 100 mph local train, that gets slowed by the 75 mph services.

A Summary Of Services By Station

I will look at the current number of trains at stations between London Bridge and Faversham.

  • Deptford – 6 tph
  • Greenwich – 6 tph
  • Maze Hill – 6 tph
  • Westcombe Park – 6 tph
  • Charlton – 8 tph
  • Woolwich Dockyard – 6 tph
  • Woolwich Arsenal – 8 tph
  • Plumstead – 8 tph
  • Abbey Wood – 8 tph
  • Belvedere – 6 tph
  • Erith – 6 tph
  • Slade Green – 6 tph
  • Dartford – 12 tph to London and 6 tph to the East
  • Stone Crossing – 4 tph
  • Greenhithe for Bluewater – 6 tph
  • Swanscombe – 4 tph
  • Northfleet – 4 tph
  • Gravesend – 6 tph to London and 5 tph to the East
  • Higham – 2 tph
  • Strood – 4 tph
  • Rochester – 7 tph
  • Chatham – 7 tph
  • Gillingham – 7 tph
  • Rainham – 7 tph to London and 5 tph to the East
  • Sittingbourne – 5 tph
  • Faversham – 5 tph

This is almost a train every ten minutes all the way from London to Faversham.

In addition Ebbsfleet International has four tph to and from London St. Pancras International.

Could Extra Services Be Run Along The North Kent Line?

Consider.

  • Six tph is not a high frequency for a relatively simple route like this.
  • The East London Line, which has about the same level of complication easily handles sixteen tph and it is planned to go to twenty tph in the next couple of years.
  • Digital signalling and Automatic Train Control will handle twenty-four tph on Crossrail and Thameslink.
  • Freight trains do not run at a high frequency on the route.

I wouldn’t be surprised to see another eight-ten tph added to the route.

How Many Trains Should Terminate At Ebbsfleet?

Currently, Crossrail has six fully-planned and built terminals.

  • Abbey Wood will handle twelve tph in the Peak and ten tph in the Off Peak
  • Heathrow Terminal 4 will handle four tph all day
  • Heathrow Terminal 5 will handle two tph all day
  • Maidenhead will handle two tph all day.
  • Reading will handle four tph in the Peak and two tph in the Off Peak
  • Shenfield will handle twelve tph in the Peak and ten tph in the Off Peak

It would appear that most terminals only handle between two and four tph.

I very much suspect, that research will show that four tph to and from Ebbsfleet will be sufficient.

It certainly meets the requirement for a Turn-Up-And-Go service, as used by London Overground and Merseyrail.

Possible Terminals For Crossrail In Kent

Wikipedia gives services to Abbey Wood station under Services as follows.

  • Peak – Twelve tph
  • Off Peak – Ten tph

There are several possible terminals for Crossail in Kent

Gravesend Station

When Crossrail was planned, the route was safeguarded to Gravesend station, with a depot at Hoo Junction to the East.

This section in Wikipedia, which is entitled To Gravesend And Hoo Junction, gives more details. This is the first sentence.

The route to Gravesend has been safeguarded by the Department for Transport, although it was made clear that as at February 2008 there was no plan to extend Crossrail beyond the then-current scheme.

These pictures show Gravesend station.

The station is well-appointed and has good services.

  • The station is close to the Town Centre.
  • It is step-free.
  • There is a West-facing bay platform, which is currently used for a two tph service to Charing Cross.
  • The platforms are very long.
  • HighSpeed commuter services and Thameslink call at the station.

Crossrail services could either terminate in the bay platform or run through the station to a turnback siding at Hoo Junction.

Either way, I’m sure four tph could be easily handled.

Ebbsfleet International Station

Ebbsfleet International station is named in the title of this post and many are expecting that Crossrail will be extended to the station.

This Google Map shows this station.

Note.

  1. The High Speed platforms 1 to 4, for St. Pancras, Ashford International and the Continent are to the left.
  2. The two separate platforms 5 and 6 for high-speed services to and from North Kent.
  3. The large amount of car parking around the station.

It’s not obvious, where a platform or two for Crossrail could fit in.

The Wikipedia entry for Ebbsfleet International station, says this about Crossrail.

It was formerly planned that Crossrail would terminate at a separate station between Northfleet and Ebbsfleet International but under the current plan, Abbey Wood further west will be the eastern terminus. However, a Crossrail extension from Abbey Wood to Gravesend (Hoo Junction) remains safeguarded

Perhaps, Crossrail platforms could be on the Northfleet side of the station, to the North of platforms 5 and 6.

If two platforms are good enough for Abbey Wood station, then surely, two platforms would be sufficient at Ebbsfleet International station.

This Google Map shows where the North Kent Line rrosses the Channel Tunnel Rail Link about five hundred metres North of Ebbsfleet station.

Could a flyover or dive-under be created to create a spur from the North Kent Line, that would allow Crossrail trains to sneak down the Eastern side of the high speed lines to platforms, alongside the current Platforms 5 and 6?

This picture was taken from a train on the bridge that carries the North Kent Line over the high speed lines.

I suspect there is a solution in there somewhere.

One interesting possibility could be for the Crossrail trains to share Platforms 5 and 6 at Ebbsfleet International station with the HighSpeed commuter services to North Kent.

This picture shows the flying junction, where the tracks through Platforms 5 and 6, join the North Kent Line between Northfleet and Gravesend stations.

As currently, only two tph use the link, surely, Crossrail services of four tph could share, if they were to go through Ebbsfleet International and terminate at Gravesend?

I’m not an expert on designing bridges, but to my untrained eye, a flyover to connect the Ebbsfleet loop to the North Kent Line to the West of the station, wouldn’t be much more complicated, than the flyover to the East.

I think, a loop to serve Ebbsfleet would have other advantages.

  • Crossrail would have access to a much-needed Park-and-Ride site.
  • The interchange between Crossrail and Continental services would be a short walk.
  • Probably only minimal improvements would be needed to Ebbsfleet International station.
  • There would be a same-platform interchange between Crossrail and HighSpeed commuter services to and from St. Pancras.
  • Construction would be more affordable and less disruptive.

Perhaps, it’s a better idea, than I originally thought?

Abbey Wood

Abbey Wood station has been designed to handle twelve tph.

The picture shows the four platforms at Abbey Wood station with a Class 345 train in one of the two Crossrail platforms.

  • Two platforms can handle twelve tph.
  • A turnback facility that has been built at the station to handle more trains or service recovery.
  • There are three bridges, two escalators and at least two lifts to facilitate transfer between Crossrail and other services.
  • Platforms are spacious.
  • There is a wide gate line controlling entry to the station.
  • The station is well-served by buses, but car parking is limited.

It is one of the better new stations and would certainly have no problems handling the eight tph, it would need to in the Peak, if four tph, carried on to terminate at Ebbsfleet.

Dartford Station

Dartford station probably has claims to be terminal for Crossrail.

It is a large town, clustered around the station.

There is a lot of new housing close to the station.

It has regularly services to several London terminals, by a variety of routes.

But it appears to be a very cramped station with narrow platforms, as some of these pictures shows.

Services at the station include.

  • Eight tph – Charing Cross
  • Two tph – Victoria
  • Four tph – Gravesend

Thameslink also run two tph between Luton and Rainham.

It is much-more a station where travellers change trains, than one where services terminate..

But even for that it needs improvement.

My Preferred Crossrail Option

I would extend Crossrail to Ebbsfleet in a simple manner, that was capable of being expanded, as traffic needs changed in the future.

Four tph Would Continue Through Abbey Wood Station

I feel that a Turn-Up-And-Go service between Abbey Wood and Ebbsfleet, of four tph would be sufficient, especially if other services on the route, were to be increased in frequency and capacity.

Services Would Terminate At Gravesend Station

The original safeguarded plan for Crossrail to be extended to Gravesend, with a depot at Hoo Junction, is in my mind a good plan.

  • Gravesend station is probably Crossrail-ready.
  • Gravesend station could handle the turnround of Crossrail running at a frequency of four tph.
  • There is plenty of space for a depot at Hoo Junction.

But perhaps most importantly,, it is the original plan suggested in the original design of Crossrail.

Have decisions been made by the various councils on the extended route, based on this plan?

Crossrail Services Would Use The North Kent Line

The extended Crossrail service would call at Belvedere, Erith, Slade Green, Dartford, Stone Crossing, Greenhithe for Bluewater, Swanscombe and Northfleet.

Frequencies of trains at the stations between Abbey Wood and Gravesend would be.

  • Belvedere – 10 tph
  • Erith – 10 tph
  • Slade Green – 10 tph
  • Dartford – 16 tph to London via a variety of routes and 10 tph to the East
  • Stone Crossing – 8 tph
  • Greenhithe for Bluewater – 10 tph
  • Swanscombe – 8 tph
  • Northfleet – 4 tph

In addition, Gravesend would have ten tph to and from London.

Handling these frequencies on a modern double-track railway shouldn’t be a problem.

Will Digital Signalling Be Needed?

Crossrail and Thameslink are both digitally signalled and will use a degree of Automatic Train Control, to handle up to twenty-four tph.

I could see advantages in applying similar systems to the Crossrail extension to Ebbsfleet.

Merging Of Services Between Abbey Wood And Belvedere Stations

Services through both these stations would include.

  • 4 tph – Crossrail between London and Ebbsfleet/Gravesend
  • 2 tph – Thameslink between Luton and Rainham, which don’t stop at Belvedere.
  • 4 tph – Southeastern which are the Dartford Loop service to and from Cannon Street.
  • 2 tph – Southeastern between Charing Cross and Dartford

The current track layout appears to allow Crossrail trains to access the North Kent Line, but Class 345 trains are not fitted with shoes for third-rail elecrification.

This Google Map shows the Western end of Belvedere station.

Note how there appears to be space on either side of the double track, which continues as far as Abbey Wood station.

I suspect that a track layout can be designed between the two stations, so that trains can merge and diverge efficiently between the four tracks at Abbey Wood and the two tracks at Belvedere.

Digital signalling would make it easier.

Station Improvement Between Abbey Wood and Grsvesend Stations

As I indicated earlier, Dartford station would need improvement.

On the other hand Abbey Wood, Greenhithe for Bluewater and Gravesend will need very little modification.

I also suspect, Dartford would not be the only station, that will need improvement.

All stations would be made step-free.

A Loop For Ebbsfleet International Station

I feel that the best way to give access to Ebbsfleet International station would be to create a loop from the North Kent Line and use the current island platform 5 and 6 at the station for Crossrail as well.

The Eastern end of the loop has already been built to a high standard and it would only need a Western connection to be designed and constructed.

I’ll repeat the advantanges of this scheme, I listed earlier.

  • Crossrail would have access to a much-needed Park-and-Ride site.
  • The interchange between Crossrail and Continental services would be a short walk.
  • Probably only minimal improvements would be needed to Ebbsfleet International station.
  • There would be a same-platform interchange between Crossrail and HighSpeed commuter services to St. Pancras.
  • Construction would be more affordable and less disruptive.

Each side of the he island platform 5 and 6 would handle.

  • Two tph – HighSpeed commuter services.
  • Four tph – Crossrail services.

They may even be able to handle more trains in the future.

Will Crossrail’s Class 345 Trains Fleet Need Upgrading?

Crossrail’s Class 345 trains have a 90 mph operating speed, as opposed to the 100 mph operating speed of Thameslink’s Class 700 trains.

Southeastern Class 465 trains are even slower at 75 mph.

If all trains working the North Kent Line were 100 mph trains, it would surely make a robust timetable easier to create and operate.

I would expect that in a few years time, all trains working between London and Kent will be capable of at least 100 mph.

Where Will Gravesend and Ebbsfleet International Services Terminate In The West?

The obvious terminal would surely be Heathrow, as this would give a useful service Heathrow and Continental rail services, without the need to change trains.

Wikipedia is quoting 52 minutes between Heathrow and Abbey Wood on Crossrail and current times give  twenty-three minutes between Abbey Wood and Gravesend stations, with perhaps four minutes less to Ebbsfleet in the future.

So timings could be as follows.

  • Heathrow and Ebbsfleet – 75 minutes
  • Heathrow and Gravesend – 79 minutes

Surely, this will be better than struggling around a crowded M25.

Southeastern HighSpeed Commuter Service Improvements

The Southeastern franchise may change later in the year and speculation has started on what this will mean for services and the trains used.

A Revamped HighSpeed Service

In an article in the July 2017 Edition of Modern Railways, which is entitled Kent On The Cusp Of Change, some well-founded speculation is made about the future of the HighSpeed commuter service.

  • More Class 395 trains or similar need to be procured.
  • A new service between St. Pancras and Hastings is planned.
  • An all-day service between St. Pancras and Maidstone West via Gravesend.
  • An extra two tph between St. Pancras and Ebbsfleet International.
  • A second London terminal may be opened at possibly Waterloo or even Victoria.

Only the Maidstone West service would pass through platforms 5 and 6 at Ebbsfleet International station and would add a third hourly HighSpeed service.

In some ways, it might be better for HighSpeed services to run at four tph between Gravesend and St. Pancras via  Ebbsfleet International and Stratford International, as this would fit much better with a four tph Crossrail service.

Improvements To Stratford International Station

Pedestrian routes between the various services and the Olympic Park at Stratford International station are not good.

  • If HighSpeed services are going to be expanded, then it is only right that Stratford International station is improved, to a good modern connectivity standard.
  • If Stansted Airport and Cambridge services serve Stratford in the future, then there must be an easy pedestrian route between the two services.
  • Connectivity between HighSpeed and Great Eastern Main Line and Crossrail services is particularly poor.
  • The HighSpeed platforms at Stratford International station are bleak and draughty and need improvement.

It’s almost as if, the whole station complex was designed for the Eastfield Shopping Centre.

A Summary Of Services By Station

I will look at the current number of trains at stations between Abbey Wood and Faversham, after adding in two extra HighSpeed sevices.

  • St. Pancras and Maidstone West via Strood.
  • St Pancras and Faversham.

These would give.

  • Belvedere – 10 tph
  • Erith – 10 tph
  • Slade Green – 10 tph
  • Dartford – 16 tph to London via a variety of routes and 10 tph to the East
  • Stone Crossing – 8 tph
  • Greenhithe for Bluewater – 10 tph
  • Swanscombe – 8 tph
  • Northfleet – 4 tph
  • Gravesend – 8 tph to London and 7 tph to the East
  • Higham – 2 tph
  • Strood – 6 tph
  • Rochester – 8 tph
  • Chatham – 8 tph
  • Gillingham – 8 tph
  • Rainham – 8 tph to London and 6 tph to the East
  • Sittingbourne – 6 tph

Thameslink Improvements

My only thought about Thamesink, is that if Crossrail and Southeastern’s HighSpeed services run at a frequency of four tph, through Gravesend, then surely Thameslink should run at the same frequency Between St. Pancras and Rainham.

I say St. Pancras rather than Luton, as it would probably be sensible to send the extra two tph up the East Coast Main Line to either Welwyn Garden City, Peterborough or Cambridge.

A Summary Of Services By Station

I will look at the current number of trains at stations between Abbey Wood and Faversham, after adding in two extra Thameslink sevices.

These would give.

  • Belvedere – 12 tph
  • Erith – 12 tph
  • Slade Green – 12 tph
  • Dartford – 18 tph to London via a variety of routes and 12 tph to the East
  • Stone Crossing – 10 tph
  • Greenhithe for Bluewater – 12 tph
  • Swanscombe – 10 tph
  • Northfleet – 6 tph
  • Gravesend – 10 tph to London and 9 tph to the East
  • Higham – 4 tph
  • Strood – 8 tph
  • Rochester – 10 tph
  • Chatham – 10 tph
  • Gillingham – 10 tph
  • Rainham – 10 tph to London and 6 tph to the East
  • Sittingbourne – 6 tph

When you consider that these frequencies are obtained by trains running at 100 mph on a railway, that was most;ly built in the mid-nineteenth century and electrified with 750 VDC third rail before the Second World War.

Southeastern Improvements

Both Southeastern’s Metro services to and from Dartford and Chatham and their main line services to East Kent will probably be improved under the new franchise holder

  • New or refurbished 100 mph trains will replace the 75 mph Class 465 trains.
  • Dover and Ramsgate will get increased frequencies from Victoria.
  • Metro services to and from Dartford and Chatham will be at least a Turn-Up-And-Go four tph.
  • The enhanced performance of the new trains would enable faster services and more stops to be made without degrading the timetable.

I feel that it would not be impossible to see every station between London Bridge and Rainham having twelve tph.

The Pedestrian Link Between Northfleet And Ebbsfleet International Stations

I am not saying a pedestrian link between Northfleet and Ebbsfleet International station shouldn’t be built, but consider that the loop through Ebbsfleet International station gives two routes between Swancombe and Gravesend.; one via Northfleet and the other via Ebbsfleet International.

A lot depends on how many passengers will actually want to travel between the two stations.

  • Those from the West could change at a station like Dartford or Greenhithe for Bluewater to a train going to their required destination.
  • Those from the East could change at Gravesend to a train going to their required destination.

All changes would be same-platform changes and the best stations could be encouraged by coffee kiosks and comfortable waiting rooms.

For passengers starting from Northfleet the following rules would apply.

  • Passengers going East would take the first train and change if required at Bravesend, Rochester or their preferred station.
  • Passengers going West would take the first train and change if required.
  • Passengers going to Ebbsfleet International would probably catch the first train for a single stop and then cross-over to the other platform for a train to Ebbsfleet International.

If there were upwards of six tph on both routes and step-free access at all stations, these procedures would not be unduly tiresome.

Similar rules would apply for those starting their journeys at Ebbsfleet International.

Note that, as more trains ran on both routes between Swanscombe and Gravesend, the time to get between the two stations would decrease.

If as seems to be planned, a lot of housing is built on the undeveloped land between the two stations, I wouldn’t be surprised to see a progressively-minded developer build a pleasant tree-lined pedestrian and cycling route between the two stations.

This would be mainly to give easy access to the development to the two stations, but it would also link them together.

Conclusion

Everything, I have written in this post is based on sound facts and is possible with today’s technology.

  • 100 mph suburban electric trains have been around for several decades.
  • Digital signalling has been successfully running on Thameslink in the UK and other places in the world for a couple of years.
  • The construction methods to build a loop at Ebbsfleet station are nothing out-of-the-ordinary.

What I have outlined would be much more of a £1.3 billion project than a £3 billion one!

I also believe everything can be achieved without massive disruption or inconvenience to passengers and probably delivered in full by 2025.

It should be noted that North Kent will be reaping the benefit of three major new cross-London high-capacity railways.

  • The Chanel Tunnel Rail Link between Ebbsfleet International and St. Pancras via Stratford International.
  • Crossrail between Abbey Wood and West London via Canary Wharf, the City and West End of London, Paddington and Old Oak Common.
  • Thameslink between Kent and North of London via London Bridge, Blackfriars and St. Pancras.

As cross-London routes continue to develop in future decades, other commuter routes will benefit from similar strategies.

 

 

 

 

 

 

 

 

June 28, 2019 - Posted by | Transport/Travel | , , , , , , ,

4 Comments »

  1. There is a lot of new build of housing going on around Ebbsfleet too, close to the station – it is a 10 or 20 year project. A lot of the new properties are within walking distance of Ebbslfleet International Station. Nothing above 3 stories, lots of green space and duck ponds, and rather expensive in the opinion of of a northerner such as myself – just short of £300,000 for a 2 bed apartment. However, my daughter who lives in one, is within walking distance of Ebbsfleet should be want to (or be able to afford to) nip for a shopping day in Paris.

    Comment by nosnikrapzil | June 30, 2019 | Reply

  2. Excellent report. The problem however, is that you makes too much logical sense. The government, the Thames Estuary Growth 2050, KCC and of course, Ebbsfleet Development Corporation, are hell bent in seeing any extension terminate at Ebbsfleet only.
    It seems that the large economically deprived town of Gravesend, is not trendy enough for them.
    Ridiculous I know, however, these folk turn their nose up at towns like Gravesend, so no real surprise at all.

    Comment by Andy | July 16, 2019 | Reply

  3. You get it all over the country, where one town gets favouritism over its neighbour, just because one is not considered a posh town. A senior civil servant, once said “Poor You!” to me, when I told him I lived in Hackney!

    He probably went to Eton and Oxford, whereas I went to Minchenden and Liverpool!

    Comment by AnonW | July 16, 2019 | Reply

  4. […] of the analysis is an update of a post called Up To £3 Billion For Crossrail To Ebbsfleet, that I wrote in June […]

    Pingback by An Analysis Of The Train Service On The East Kent Line With Respect To The Three Options For Crossrail To Ebbsfleet (C2E) « The Anonymous Widower | August 1, 2021 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: