More Trains Watford Junction To London Euston Route Thanks To Class 710s
The title of this post is the same as that of this article on Rail Advent.
This paragraph sums up the new service.
From Sunday 17 November, Transport for London (TfL) will start to run four trains per hour (approximately every 15 minutes) throughout the day.
Currently, there are only three trains per hour (tph), which until a couple of months ago, were five car trains.
- So it appears that the service will be increasing from three trains and fifteen cars per hour to four trains and sixteen cars per hour.
- Checking the on-line timetable, it also appears that service might be a few minutes faster.
- I can’t be sure of the latter as the on-line timetable or my internet connection seems to be playing up.
- The Watford DC Line will now have the standard London Overground frequency of four tph.
The big improvement with both the the Watford DC Line and the Gospel Oak and Barking Line using identical trains could be in service recovery.
- Eight trains are needed to run a full service on both lines.
- Eighteen trains have been ordered.
- This would mean one could be in maintenance and one can be kept as a hot spare.
It is not as tight as it looks, because I suspect a five-car Class 378 train can fill in on the Watford DC Line, if required.
November 6, 2019 - Posted by AnonW | Transport/Travel | Class 378 Train, Class 710 Train, Gospel Oak And Barking Line, London Overground, Watford DC Line
2 Comments »
Leave a reply to AnonW Cancel reply
This site uses Akismet to reduce spam. Learn how your comment data is processed.
About This Blog
What this blog will eventually be about I do not know.
But it will be about how I’m coping with the loss of my wife and son to cancer in recent years and how I manage with being a coeliac and recovering from a stroke. It will be about travel, sport, engineering, food, art, computers, large projects and London, that are some of the passions that fill my life.
And hopefully, it will get rid of the lonely times, from which I still suffer.
Why Anonymous? That’s how you feel at times.
Charities
Useful Links
Top Posts
- Back To The Future With BYD Double-Deck Buses
- Jamie Oliver's Fish Pie
- Could Sheffield Station Become A Battery-Electric Train Hub?
- US Government Sends Stop Work Order To All Offshore Wind Projects Under Construction
- Last '319s' On Thameslink This Summer
- Beeching Reversal - A New Station At Waverley In Sheffield
- Around London Road Depot Of The Bakerloo Line
- Access To Toton - Scheme 6 - Trowell Curve
- The Class 319 Trains Keep Rolling On
- Could Crossrail 2 Go To Grays?
WordPress Admin
-
Join 1,883 other subscribers
Archives
Categories
- Advertising Architecture Art Australia Banks Battery-Electric Trains BBC Buses Cambridge Coeliac/Gluten-Free Construction COVID-19 Crossrail Death Decarbonisation Design Development Docklands Light Railway Driving East Coast Main Line Electrification Elizabeth Line Energy Engineering Entertainment Floating Wind Power Flying Football France Freight Germany Global Warming/Zero-Carbon Good Design Gospel Oak And Barking Line Greater Anglia Great Western Railway Heathrow Airport High Speed Two Highview Power Hydrogen-Powered Trains Innovation Internet Ipswich Town King's Cross Station Law Liverpool London London Overground London Underground Manchester Marks and Spencer Network Rail New Stations Offshore Wind Power Olympics Phones Politics Project Management Religion Research Scotland Shopping Solar Power Stations Step-Free Stroke Television Thameslink The Netherlands Trains United States Walking Weather Wind Power Zopa
Tweets
Tweets by VagueShot
What if 710’s from 4 mean can 1 additional coach into 5-car carriages on Watford DC Line, meaning 20 carriages per hour, can they, at least peak times?
Comment by James Brown | December 7, 2019 |
I think that going to four x four-car trains, is so that the Watford DC and Gospel Oak to Barking Lines have identical stock.
This means they can have a single spare train for both lines ready at Willesden Depot, should a train fail on either line.
Five-car Cass 710 trains can be built and will be for the North London Line, but they don’t fit the Gospel Oak to Barking Line, which has some short platforms.
Comment by AnonW | December 7, 2019 |