Could Access Between Platform And Train Be Improved At Kennington Station?

Before I look at the solutions, I will look at passenger flows around Kennington station, now that the extension to Battersea has opened.

  1. Passengers will enter the station and take a train.
  2. Passengers will arrive at the station and leave.
  3. Passengers will change trains going between say Morden and Battersea Power Station stations.
  4. Passengers will change between the two Northbound services through the station, by walking between Platforms 1 and 3.
  5. Passengers will change between the two Southbound services through the station, by walking between Platforms 2 and 4.

Kennington station has two major access problems for those of restricted mobility.

  • Getting between street and platform
  • Getting between platform and train

There used to be a third problem, which was that there wasn’t enough cross-platform access between Platforms 2 and 4 and Platforms 1 and 3, which has now been improved.

The pictures show the passage between Platforms 2 and 4, which seems to have been built to a high quality.

How will these access problems affect passengers and especially those with reduces mobility?

  • Passengers with reduced mobility may avoid Kennington station, if they are using Routes 1 and 2, as the stairs are difficult.
  • Passengers using Route 3 may find it easier to change at Waterloo, London Bridge or another convenient station.
  • There are lots of buses, which may offer a convenient alternative.

Operating experience will give the correct answer, but I feel that passengers using the station will contain a large proportion, who are using Routes 4 or 5 and just changing from one train to another going in the same direction.

Access Between Street And Platform

These pictures show the stairs that give access to the platforms from the passageway leading to the lifts.

Note.

  1. The stairs are steep and not very wheelchair or buggy friendly.
  2. They are not all the same length.

Unless it is possible to sneak a lift down into the new cross-passages, I suspect that providing step-free access to the platforms will be a long time coming at Kennington station.

It will also probably need passengers to use two lifts between street and platform, which could encourage them to find a better route.

Access Between Platform And Train

These pictures show trains in Kennington station.

Note that a Harrington Hump is fitted to the platform to ease boarding for those in wheelchairs.

The map from cartometro.com shows the platform layout at Kennington station.

Note that in the pictures and this map the platforms are almost straight.

I wonder, if as at Battersea Power Station and Nine Elms stations, the platforms could be arranged so that there is step-free access between train and platform.

These pictures show level access at the two stations on the new extension.

This would surely help those changing trains by walking between Platforms 2 and 4 or 1 and 3.

Conclusion

I am very doubtful, that large numbers of passengers with reduced mobility will use Kennington station, except to change from one train to another going in the same direction.

For that reason, I suspect Transport for London have not gone for full step-free access at Kennington station.

But I do think, that level access could be installed between the trains and all four platforms to make it easier for passengers with reduced mobility to change trains.

Passenger Flows If The Northern Line Is Split Into Two Lines

The Northern Line could be split into two.

  • The Western Line (Charing Cross Line) would run between Edgware and Battersea Power Station via Camden Town, Euston, Charing Cross and Kennington.
  • The Eastern Line (Bank Line) would run between High Barnet and Morden via Camden Town, Euston, Bank and Kennington.

Northbound routes through Kennington station would be as follows.

  • Passengers between Battersea Power Station and a Bank Line station would change between Platforms 1 and 3 at Kennington.
  • Passengers between Morden and a Charing Cross Line station would change between Platforms 3 and 1 at Kennington.

Southbound routes through Kennington station would be as follows.

  • Passengers between a Bank Line station and Battersea Power Station would change between Platforms 4 and 2 at Kennington.
  • Passengers between A Charing Cross Line station and Morden would change between Platforms 2 and 4 at Kennington.

All of these Northbound and Southbound changes are a level walk of perhaps ten metres.

Passengers between Morden and Battersea Power Station would change at Kennington, if they can manage the stairs.

Otherwise, they will need to do two cross-platform interchanges at Kennington and Waterloo.

The rule would appear to be if you’re on one line and are going to a station on the other, you change at Kennington station.

Staff would need to be on the platform to help those, who were changing direction.

But I do think changing can be made to work well with step-free access between train and platform on all four platforms at Kennington station.

 

 

 

 

September 22, 2021 - Posted by | Transport/Travel | , , , , , ,

3 Comments »

  1. I am wondering why didn’t they add a lift next to the new passageways. But at least there are more opportunities for that because of the new cross passages. However, Oval equally has a good chance to have 1 lift to land at both platforms, while Elephant & Castle & Waterloo are being made step-free to the Northern line at least.

    Comment by Vince Koh | September 23, 2021 | Reply

    • Let’s face it, most people have enough sense to avoid difficult stations.

      I usually come home via Moorgate station, as I can get a bus from there direct to my house. But TfL’s journey planner never uses that route.

      It also has a convenient and friendly Leon and an M & S with a good food store.

      We need a journey planner linked to your previous journeys, that uses masses of AI.

      Comment by AnonW | September 23, 2021 | Reply

  2. […] Could Access Between Platform And Train Be Improved At Kennington Station?, I outlined how passengers might use Kennington station to change between the Bank and Charing […]

    Pingback by Thoughts On Splitting The Northern Line « The Anonymous Widower | September 27, 2021 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: