The Anonymous Widower

To Middlesbrough By LNER

Today, I took the new LNER service to Middlesbrough.

It left at 15:25 and should have arrived in just under three hours. But it was eighteen minutes late.

I took these pictures of our arrival in Middlesbrough.

Note.

  1. The train wasn’t full at Middlesbrough.
  2. Quite a few passengers left and joined at York.
  3. There were also a good number of leavers at Thornaby.
  4. The train was five cars.

As it is only the third day of the new service, passenger numbers seem to me to be on-line with what I’ve seen for other new services.

I have a few thoughts.

Is A London and Middlesbrough Service Needed?

In the 1970s, when I worked at ICI, I would regularly travel to Middlesbrough from London for a day’s work at their Wilton site.

In those days there was no direct train and you had to change at Darlington.

Since then I’ve also travelled to Middlesbrough to see football matches and visit the local countryside.

I suspect I’ve done well over fifty trips between the town and London, but today’s trip was my first one that was direct.

Will More Services Be Added?

If you look at LNER’s service patterns to Harrogate and Lincoln, they started with a single service and have quietly grown to between five and seven trains per day (tpd) in both directions.

I suspect that an early and a late train are essential to allow a full day in London or Middlesbrough.

Could This Route Be Run By A Nine-Car Train?

I suspect normally, a five-car train would be sufficient, but suppose one of the big London football clubs was playing Middlesbrough in an FA Cup quarter final, LNER might like to add capacity for the match.

King’s Cross and York stations regularly handle nine-car Azuma trains and from my pictures, it looks like Middlesbrough can too! The only other stop is Thornaby station, which is shown in this Google Map.

I suspect that it might just be possible, if Thornaby passengers were told to get in the first six cars.

Could This Route Be Run By A Battery-Electric Train?

Consider.

  • The trains run on diesel power North of Longlands junction, where they leave and join the East Coast Main Line.
  • It is a distance of only 22.2 miles.

With some form of charging at Middlesbrough, I think that within a few years, this could be an all-electric service.

It would be very handy for Hitachi, as any possible customers for battery-electric trains could be given a demo to or from London.

I Think The Stop At York Is A Good Idea

It could be argued that LNER’s King’s Cross and Middlesbrough service is two services in one.

  • A direct service between London King’s Cross and Thornaby and Middlesbrough.
  • A fast non-stop service between London King’s Cross and York, that takes several minutes under two hours.

Hence my view, that the York stop is a good idea.

Could The Middlesbrough Service Split And Join With Another Service At York?

The Middlesbrough service takes five minutes for the stop at York, but other services only take three minutes.

Has the longer stop been inserted into the timetable, so that the Middlesbrough timetable can be split to serve two separate destinations?

  • Secondary destinations would have to be North of York or York station itself.
  • These could include Bishops Auckland, Edinburgh, Newcastle, Scarborough and Sunderland.
  • Given the arguments, there have been over the new timetable not calling at smaller stations, could these be served by a train to Newcastle?

There are quite a few sensible possibilities.

An alternative could be to split and join at Thornaby to serve both Middlesbrough and Sunderland.

December 15, 2021 - Posted by | Transport/Travel | , , , , , , , ,

1 Comment »

  1. Surely the whole point of the 5 cars was to allow services to be split such that more destinations could be served without requiring their own path to London. In Germany this is still a key way operating services with splitting and joining easily undertaken in 2-3mins but in the UK we seem to fear it now. The Southern region was very adept at splitting and joining trains all day long without issue.

    Comment by Nicholas Lewis | December 22, 2021 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: