The Anonymous Widower

Eridge Station – 3rd May 2022

I documented the work at Eridge station in Eridge Station – 12th July 2021 and it was finished a few days ago.

Note.

  1. The platforms can take ten-car trains.
  2. The lift on the National Rail side of the station.
  3. The restored iron supports for the roof.
  4. The two waiting rooms; one by the ticket hall and the other on the platform.
  5. The well-appointed toilets, with quirky signs and the all important coat hook.
  6. There’s even an Amazon Hub.

It certainly is a quality restoration and upgrading to step-free access.

Possible Future Electrification

In Uckfield Third Rail Is NR Priority, I discussed ways that the Uckfield Branch could be electrified.

This picture shows the platforms from the Spa Heritage Railway.

Note.

  1. All National Rail services call in the far platform.
  2. The platform will take a ten-car train.
  3. There is plenty of space for a single extra third-rail between the tracks.

If the power were only switched on whilst trains were in the platform, surely it would be safe.

May 3, 2022 Posted by | Transport/Travel | , , , , , | Leave a comment

Eridge Station – 12th July 2021

It’s been over a year, since I went to Eridge station, so I thought I’d go again.

Note.

  1. The station seems to have moved on.
  2. The steps have had a makeover.
  3. It appears that some painting has been done.
  4. All Southern trains call in Platform 1, which is in the Western side of the tracks.

A lift will be installed on that side, with a slope on the heritage line side.

I’m fairly certain if they get the marketing right, families will pay to go to Eridge station for a day on the Spa Heritage Railway.

 

 

 

 

July 12, 2021 Posted by | Transport/Travel | , , | 1 Comment

Eridge Station – 23rd June 2020

Eridge station is going to have a makeover, which starts this weekend.

So I went to have a look and took these pictures.

Note.

  1. The station certainly needs a new footbridge.
  2. The builders were clearing a work site to get access to the station.
  3. The station will be kept open throughout the work according to this article on Crowborough Life.

The station could end up as a good mix of ancient and modern.

June 24, 2020 Posted by | Transport/Travel | , , , | Leave a comment