The Anonymous Widower

Chaos In The Balls Pond Road

The roadworks that caused all the problems with the buses, last week are still ongoing. There are no open bus stops and just one narrow lane for the traffic.

One Narrow Lane In The Balls Pond Road

One Narrow Lane In The Balls Pond Road

When I left home this lunchtime, I walked to the next stop, where there was an angry crowd and even angrier drivers trying to get onto the Balls Pond Road.

The diversion on Dove Road was congested and totally inadequate, especially as they were running extra buses as the Overground was closed, so putting a large number of extra passengers on the buses. When I returned later in the afternoon, the problems were made worse, by everybody trying to get to the Emirates to see Arsenal at home to Liverpool.

If they’d wanted to organise chaos, they’d created it, in the best way possible.

I was talking to a bus driver and he blamed Boris, which was a bit unfair.

As my background is project planning and management, I believe this chaos was all down to no co-ordination between the parties involved. The Arsenal match has been in the calendar for months, so surely to do the necessary resurfacing work, on a match day was a bad decision. It was probably costly too, as it meant that all of the chaos, meant that not as much progress as had been hoped was made.

Surely too, the Overground should have been kept open, whilst the road was effectively closed, as this closure imposes extra strains on the road network.

The only good thing about the roadworks, was that I could cross Southgate Road with ease.

A Closed Southgate Road

A Closed Southgate Road

But crossing the Balls Pond Road is difficult for pedestrains, as there are no lights and we’ve been left to our own devices and wits.

No-one seems to have any idea, how long this chaos will go on. Although this notice mentions that Phase 5 ends on the first of December.

I can’t help feeling, that traffic problems in the area would be helped on match days, if the Northern City line was open between Finsbury Park and Moorgate. Perhaps, when Thameslink is fully established this line will get some long-needed improvement.

November 2, 2013 - Posted by | Sport, Transport | , , , , , ,

1 Comment »

  1. […] second entrance would have certainly helped on Saturday, with all the chaos in the Balls Pond Road, if of course, the Overground had been […]

    Pingback by Could We Create A Second Entrance To The Overground At Highbury And Islington Station? « The Anonymous Widower | November 3, 2013 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.