The Anonymous Widower

Mystery Tours Of Glasgow

On Saturday, I was staying at Stirling near to the station and wanted to get to Glasgow to have a look at the closure of Queen Street station, for upgrading Queen Street Tunnel, platform lengthening and electrification work.

This article on Network Rail’s web site, which is entitled Glasgow Queen Street Tunnel upgrade, says this.

The work is starting just before the Easter bank holiday weekend, and lasting much longer, with a 20-week closure of the high-level Glasgow Queen Street Tunnel from Sunday 20 March to Monday 8 August so that the concrete slab track inside the tunnel can be renewed safely.

It’s the largest piece of engineering on the Edinburgh to Glasgow line since the railway was built. Renewing more than 1,800 metres of slab will mean 10,000 tonnes of existing concrete slab will be removed, as well as 4,000 metres of new rails laid, and more than 150 staff will be working on the project every day during the 140-day period.

A lot of other work will also be done at the same time.

So Network Rail and Scotrail have called up the spirit of Baldrick, and devised a cunning plan. This map shows the rail lines in the Glasgow area.

Glasgow Rail Lines

Glasgow Rail Lines

My route in from Stirling to the low-level platform at Queen Street was something like.

  • Larbert
  • Croy
  • Lenzie
  • Bishopbriggs
  • Springburn
  • Duke Street
  • Belgrove
  • High Street

Coming back from Glasgow Central, the route was something like.

  • Mount Vernon
  • Bargewddie
  • Kirkwood
  • Coatbridge Central
  • Cumbernauld

Although the train didn’t stop until Stirling.

These are some pictures taken on the Jouney into Glasgow

And these were taken on the way out.

It certainly seems there are more wayus of moving trains through Glasgow, than most other cities.

You almost wonder looking at these pictures and the routes that I took, that Network Rail and Scotrail have an alternative philosophy.

  • Most platforms seem to have been lengthened to at least eight cars, which mean they’ll handle two Class 385 trains coupled together.
  • Most of the lines through Glasgow seem to either be electrified or seem to be having wires installed.
  • It should be noted that the route I took back to Stirling, would also enable a service to be run from Carlisle to Perth via Motherwell, Coatbridge, Cumbernauld and Stirling.
  • Once, the TransPennine routes are electrified, Manchester to Edinburgh can go up the East Coast.
  • Are Network Rail going to apply some of the innovative interchange philosophy I wrote about in Better East-West Train Services Across Suffolk?

If electric trains can get everywhere and they are twice the capacity of the current diesel trains, then mathematics and scheduling rules, says you can get more trains through the system.

So could they be looking to increase the capacity of the two Glasgow stations and open up circular routes between them?

I don’t know the answer, but I do believe that when the EGIP program is complete, it will be interesting to see if more passengers are able to use the trains. What is being done is very different to previous proposals.

June 21, 2016 - Posted by | Transport | , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.