Crossrail 2 And The Chingford Branch Line
The Chingford Branch Line will be effected both during construction and after opening by Crossrail 2..
In Rumours Of Curves In Walthamstow, I said this.
But with the design stage of Crossrail 2 well underway, I do wonder, if connecting Chingford station and the related sidings to the West Anglia Main Line, might give Crossrail 2 better options to build the line or provide alternative services, whilst the West Anglia Main Line is rebuilt through the area.
I still think that the Chingford Branch Line will be an invaluable resource to help get the Northern end of Crossrail 2 built.
If the Coppermill Curve is built in the near future, I feel the main reason will be to help build Crossrail 2 and rebuild the West Anglia Main Line to four-tracks.
Once Crossrail 2 is open, I think that the two lines will be connected together at Seven Sisters/South Tottenham. There is a lot of scope for a major passenger-friendly interchange and as it will be a few years after Crossrail, the design will draw on the experience of theearlier line.
Conclusion
The Chingford Branch Line will end up being tightly linked to Crossrail 2.
Related Posts
Improving The Chingford Branch Line
Could Reversing Sidings Be Used On The Chingford Branch Line?
Could The Hall Farm Curve Be Built Without Electrification?
New Stations On The Chingford Branch Line
Rumours Of Curves In Walthamstow
Will Walthamstow Central Station On The Victoria Line Be Expanded?
[…] Crossrail 2 And The Chingford Branch Line […]
Pingback by New Stations On The Chingford Branch Line « The Anonymous Widower | September 7, 2016 |
[…] Crossrail 2 And The Chingford Branch Line […]
Pingback by Improving The Chingford Branch Line « The Anonymous Widower | September 7, 2016 |
[…] Crossrail 2 And The Chingford Branch Line […]
Pingback by Could Reversing Sidings Be Used On The Chingford Branch Line? « The Anonymous Widower | September 8, 2016 |
[…] Crossrail 2 And The Chingford Branch Line […]
Pingback by Rumours Of Curves In Walthamstow « The Anonymous Widower | September 8, 2016 |
[…] Crossrail 2 And The Chingford Branch Line […]
Pingback by Could The Hall Farm Curve Be Built Without Electrification? « The Anonymous Widower | September 8, 2016 |
[…] Crossrail 2 And The Chingford Branch Line […]
Pingback by Will Walthamstow Central Station On The Victoria Line Be Expanded? « The Anonymous Widower | September 8, 2016 |