The Anonymous Widower

Heathrow Southern Railway’s Proposed Chord At Staines

In an article in the December 2016 Edition of Modern Railways about the Heathrow Southern Railway, Chris Stokes proposes a new chord at Staines to connect the lines to Reading and Windsor.

This map from carto.metro.free.fr shows the chord.

 

Note.

  1. London trains take the lines to the East.
  2. Windsor and Heathrow trains take or will take the lines to the North-West.
  3. Reading trains take the lines to the South-West.

The chord is shown as a pair of dotted lines between the Windsor and Reading Lines.

These pictures taken from a train from Egham to London, show how the chord has been developed.

In the article this is said about how the chord could be used.

With the addition of a chord at Staines, it would also be potentially possible to operate a half-hourly Weybridge – Virginia Water – Egham – Terminal 5 service, providing a further attractive local link to Heathrow.

If this service were to be added, that raised the problem of putting the chord through the development.

 

March 29, 2018 - Posted by | Travel | ,

1 Comment »

  1. […] There would appear to be enough paths to squeeze in two extra trains between Terminal 5 and Weybridge, which call at Addlestone, Chertsey, Virginia Water and Egham, and use the new chord at Staines, that I talked about in Heathrow Southern Railway’s Proposed Chord At Staines. […]

    Pingback by Heathrow Southern Railway’s Proposed Service Between Weybridge And Heathrow 5 « The Anonymous Widower | March 30, 2018 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s