I have received e-mails worrying about how hydrogen-powered trains and other vehicles, like buses and trucks, will get the fuel they need.

Production Of Hydrogen

There are two major methods of producing large quantities of hydrogen.

Steam Reforming Of Natural Gas

Steam reforming is used to convert natural gas into hydrogen by using high temperature and pressure steam in the presence of a nickel catalyst.

This section in Wikipedia is entitled Industrial Reforming, says this.

Steam reforming of natural gas is the most common method of producing commercial bulk hydrogen at about 95% of the world production of 500 billion m3 in 1998. Hydrogen is used in the industrial synthesis of ammonia and other chemicals. At high temperatures (700 – 1100 °C) and in the presence of a metal-based catalyst (nickel), steam reacts with methane to yield carbon monoxide and hydrogen.

It gives this chemical equation for the reaction.

CH4 + H2O ⇌ CO + 3 H2

I have two questions about steam reforming.

  • How much fossil fuel energy is needed to create the high temperatures and pressures to make the process work?
  • What happens to the carbon monoxide (CO)? Is it burnt to provide heat, thus producing more carbon dioxide (CO2)?

I therefor question the use of steam reforming to produce hydrogen for vehicles, especially, as a system might be required  to be installed in a train, bus or freight depot.

The only time, where steam reforming could be used, is where an existing refinery producing large quantities of hydrogen by the process is close TO the point of use.

Electrolysis Of Water Or Brine

It is fifty years, since I worked in the chlorine-cell rooms of ICI’s Castner-Kellner chemical complex at Runcorn.

The process used was the Castner-Kellner Process and this is the first paragraph of the Wikipedia entry.

The Castner–Kellner process is a method of electrolysis on an aqueous alkali chloride solution (usually sodium chloride solution) to produce the corresponding alkali hydroxide, invented by American Hamilton Castner and Austrian Karl Kellner in the 1890s.

Brine from Cheshire’s extensive salt deposits is electrolysed using a graphite anode and a mercury cathode to produce chlorine, hydrogen, sodium hydroxide and sodium metal.

Large amounts of electricity are needed, but the biggest problem is the poisonous mercury used in the process.

My work incidentally concerned measuring the mercury in the air of the plant.

Since the 1960s, the technology has moved on, and ICI’s successor INEOS, still produces large quantities of chlorine at Runcorn using electrolysis.

More environmentally-friendly processes such as membrane cell electrolysis are now available, which produce chlorine, hydrogen and sodium hydroxide.

In the 1960s, the production of chlorine and hydrogen was a 24/7 process and I would suspect that INEOS have a good deal to use electricity from wind and other sources in the middle of the night.

The Future Of Hydrogen

Hydrogen is a clean fuel, that when it burns to produce heat or is used in a fuel cell to produce electricity, only produces steam or water.

There is also a lot of research going into hydrogen fuel-cells, hydrogen storage and batteries, and some of this will lead to innovative use of hydrogen as a fuel.

As an example, there is a growing market for fuel-cell forklifts. The first one was built in 1960, so fifty years from idea to fulfilment seems about right.

How many other applications of hydrogen will be commonplace in ten years?

  • City buses
  • Local delivery vans for companies like Royal Mail and UPS.
  • Taxis
  • Refuse trucks

I also think, some surprising applications will emerge driven by the need to clean up the air in polluted cities.

Ideally, these applications will need a hydrogen filling station at the depot.

Modern electrolysis technologies should lead to the development of  simple cells, for the electrolysis of water to produce hydrogen and oxygen.

Powered by renewable energy sources or nuclear, this technology could be used to create zero-carbon hydrogen at the point of use.

Diesel Or Hydrogen?

The diesel engine in a New Routemaster bus is a Cummins diesel with these characteristics.

  • 4.5 litre
  • 138 kW
  • 400 Kg

So how much would a 150 kW fuel-cell weigh?

A Ballard FCveloCity-HD, which is capable of producing 100 kW, weighs around 300 Kg.

I feel that as hydrogen and battery technology improves, that more and more city vehicles will be hydrogen-powered.

Hyundai Launch A Hydrogen-Powered Truck

This page on the Hyundai web site is entitled Hyundai Motor Presents First Look At Truck With Fuel Cell Powertrain.

It will be launched this year and looks impressive. Other articles say they have tied up with a Swiss fuel-cell manufacturer called H2 Power and aim to sell a thousand hydrogen-powered trucks in Switzerland.

 

 

 

January 14, 2019 Posted by | Transport/Travel | , , , , , , , | 3 Comments

Gospel Oak-Barking Fleet Plan Remains Unclear

The title of this post is the same as that of this article on Rail Magazine.

In the article, there is a picture of 378232 at Barking station.

According to the Wikipedia entry for Class 378 trains, this unit is listed as being four-cars and TBA (To Be Allocated?)

So is it a spare train, that is used for driver and staff training and route proving?

It was certainly doing the latter at Barking.

The Situation On The Gospel Oak To Barking Line Is Critical

This page on the Barking-Gospel Oak Rail User Group web site is their latest newsletter, which was issued on the 14th of January.

These are the headlines on the newsletter.

  • Train Service On Brink Of Collapse
  • Not Enough Trains For Viable Service
  • TfL Has No Idea When New Trains Will Be Fit For Service
  • Rail Users Demand Mayor Takes Action To Restore Reliable Train Service Now
  • Rail Users Demand Compensation After Years Of Misery

It’s all strong stuff.

Trains that work are urgently needed to replace the diesel Class 172 trains, which will all leave by the end of April or even March.

Possible Replacement Trains

These types of trains have been touted as replacement trains.

Class 315 trains

TfL has started to send some Class 315 trains, made redundant by TfL Rail, for scrapping.

Could some of these be held back for use on the Gospel Oak to Barking Line?

  • They should fit the route.
  • London Overground already runs these trains to Cheshunt, Chingford and Enfield Town.
  • The expertise and driving experience must be there to run a service.

But, as there have been no reports of any Class 315 trains on the route, I suspect that there’s a reason, why these trains can’t fill the gap.

Could it be the disability regulations, which kick in at the end of 2019?

The proposed Class 710 rains ordered for both Gospel Oak to Barking Line and the Watford DC Line are dual voltage.

As the Willesden TMD was built to handle trains with the ability to use third-rail electrification, is this ability needed to access the depot?

But Class 315 trains are 25 KVAC only, so this could mean they are unsuitable.

Class 365 Trains

Class 365 trains got ScotRail out of trouble, but like the Class 315 trains, they are 25 KVAC only, so may have the same stabling issues.

They would also be a new train class for London Overground.

Class 319 Trains

Class 319 trains are dual-voltage and could probably be used on both routes, but they would need a refurbishment and would also be a new train class for London Overground.

Class 378 Trains

Class 378 trains already work the Watford DC Line and after the test of a four-car unit to Barking, London Overground probably know how difficult, it would be for four-car trains to work the route.

The trains are dual-voltage and London Overground’s strategy of basing trains for both routes at Willesden TMD would probably be possible.

Drivers and other staff know them very well, as do the passengers.

I am drawn to the conclusion, that of the trains available in the event of non-delivery of Class 710 trains, the Class 378 trains are the best choice.

How Many Trains Are Needed For The Gospel Oak To Barking Line?

The full service was run by a fleet of eight Class 172 service.

As the same number of Class 710 trains have been pencilled in for the route, I must assume that this is the number of trains required. I think six trains are needed for the service, with two in reserve or maintenance.

How Many Class 378 Trains Are Needed For A Full Overground Service?

If I go through the routes of the original Overground, I find the following.

Dalston Junction And Clapham Junction

Trains take 46 minutes to go South and 44 minutes to come North and a round trip would take two hours.

This means thatthe current four trains per hour (tph) service would need eight trains.

Dalston Junction And New Cross

Trains take 22 minutes both ways and a round trip would take an hour.

This means that the current four tph service would need four trains.

Highbury & Islington And Crystal Palace

Trains take 44 minutes to go South and 43 minutes to come North and a round trip would take two hours.

This means that the current four tph service would need eight trains.

Highbury & Islington And West Croydon

Trains take 52 minutes both ways and a round trip would take two hours.

This means that the current four tph service would need eight trains.

Euston And Watford Junction

Trains take 47 minutes to go South and 50 minutes to come North and a round trip would take two hours.

This means that the current three tph service would need six trains.

Stratford And Richmond/Clapham Junction

Between Stratford and Richmond, trains take 59-64 minutes to go West and 62 minutes to come East.

Between Stratford and Clapham Junction, trains take 62 minutes to go West and 64 minutes to come East.

The round trip times are very similar and are around two and a half hours.

This means that the current eight tph service would need twenty trains.

Summarising, these services gives.

  • Dalston Junction and Clapham Junction – 8 trains
  • Dalston Junction and New Cross – 4 trains
  • Highbury & Islington and Crystal Palace – 8 trains
  • Highbury & Islington and West Croydon – 8 trains
  • Euston and Watford Junction – 6 trains
  • Stratford and Richmond/Clapham Junction – 20 trains

This gives a total of 54 trains. As there are fifty-seven Class 378 trains, this means there are three spares to cope for maintenance and breakdowns.

London Overground have plans to increase frequencies and they are detailed in this table.

Note that four extra services are planned for the East London, North London and Watford DC Lines.

  • Two extra tph between Stratford and Clapham Junction, which has already been implemented.
  • Two extra tph between Dalston Junction and Clapham Junction. This would mean that twelve trains would be needed for this service.
  • Two extra tph between Dalston Junction and Crystal Palace. This would mean that twelve trains would be needed for this service.
  • One extra tph between Euston and Watford Junction. This would mean that eight trains would be needed for this service.

Summarising again gives.

  • Dalston Junction and Clapham Junction – 12 trains
  • Dalston Junction and New Cross – 4 trains
  • Highbury & Islington and Crystal Palace – 12 trains
  • Highbury & Islington and West Croydon – 8 trains
  • Euston and Watford Junction – 8 trains
  • Stratford and Richmond/Clapham Junction – 20 trains

This gives a total of 64 trains.

As London Overground only has 57 Class 378 trains, this proposed timetable is impossible without some new Class 710 trains.

London Overground plan to use some of the Class 710 trains to release Class 378 trains from the Watford DC Line, to reinforce East London Line services.

So it looks like the late delivery of the Class 710 trains has also scuppered London Overground’s plans to increase services on the East London Line.

How Many Class 378 Trains Could Be Scraped Together?

This table shows the number of Class 378 trains needed for the current service.

  • Dalston Junction and Clapham Junction – 8 trains
  • Dalston Junction and New Cross – 4 trains
  • Highbury & Islington and Crystal Palace – 8 trains
  • Highbury & Islington and West Croydon – 8 trains
  • Euston and Watford Junction – 6 trains
  • Stratford and Richmond/Clapham Junction – 20 trains

This gives a total of 54 trains. With just three trains spare.

As the Gospel Oak to Barking Line needs eight trains to run a full service, this is not enough.

What strategies can be applied to increase the number of trains available?

Reduce The Stratford And Clapham Junction Service To Two tph

The Stratford and Clapham Junction service was two tph until recently, when it was raised to four tph.

Reducing it back to two tph, would reduce the number of trains required on Stratford and Clapham/Richmond services by five.

This would give eight spare trains, which would be almost enough to run a full service on the Gospel Oak to Barking Line.

Provided of course, that there was a hundred percent availability, which is rather an impossible dream.

Introduce The Class 710 Trains On The Watford DC Line

The Class 710 trains for the Gospel Oak to Barking Line are dual-voltage trains, which will also run on the Watford DC Line. So would it be a sensible idea to introduce these trains first on the Watford DC Line?

  • The third-rail electrification on the line is at least fifty years old, so must be fully tested.
  • The drivers have extensive route knowledge of running electric trains on the route.
  • Willesden TMD, where the Class 710 trains are stabled, is on the Watford DC Line.
  • The route is only shared with the Bakerloo Line.
  • The route is to be equipped with six Class 710 trains anyway.

Every Class 710 train introduced will release a Class 378 train.

But if the Class 710 trains don’t work, this is no help!

Introduce The Class 710 Trains On The North London Line

Running on the North London Line is more complicated than the Watford DC Line, but five-car Class 710 trains, are planned for this route.

They could be introduced to release Class 378 trains.

The Four-Car Train Problem

Every four-car train created means that a trailer car is removed from a five-car Class 378 train.

I would assume that it is most likely, these spare cars will be put into store until the, the new Class 710 trains finally enter service.

Or would they be added to other Class 378 trains to create six-car trains, which would then be run on the North or West London Lines, where the platforms could be almost long enough? Selective door opening on the trains could also be used at short platforms.

Conclusion

I feel if the London Overground swap trains around and perhaps reduce the Stratford and Clapham Junction service to its old level of 2 tph, then enough Class 378 trains would be available to run a full four-car service on the Gospel Oak to Barking Line.

January 14, 2019 Posted by | Transport/Travel | , , , , , | 8 Comments