The Anonymous Widower

East Midlands Railway Announces Three Brands

The title if this article is the same as that of this article on Railway Gazette.

This is a quote about their electric trains to Corby, which will run under the brand name of EMR Electrics.

EMR said that once various developments had been completed, passengers would be able to reach the terminal at Luton Airport in ‘a little under half an hour’ from central London.

Currently, the fastest services going to between St. Pancras and Luton Airport Parkway stations take twenty-four minutes using 125 mph Class 222 trains with Luton Airport Parkway as the first stop.

Thameslink using 100 mph Class 700 trains take 30 minutes and more!

I question, whether the 100 mph Class 360 trains, running with Luton Airport Parkway as the first stop, can do the trip in the 24-26 minutes to get to the terminal in under half an hour, even with Luton Airport’s  DART shuttle train working!

In Are Class 360 Trains Suitable For St. Pancras And Corby?, I looked at Class 360 trains running the service between St. Pancras and Corby stations.

I came to this conclusion.

In my view there is a lot of upgrade work to be done to the Class 360 trains to make them suitable for working on the services between St. Pancras and Corby.

  • They need a new upgraded interior.
  • The trains need upgrading to at least 110 mph.
  • A possible upgrading with digital signalling.

I can’t help feeling that the Class 360 trains would make a good stop-gap, but in the long-term it might be better to have a small fleet of electric trains.

Electric AT-300 trains must be one of the favourites, although Class 745 trains, similar to those that Abellio will run between Liverpool Street and Stansted Airport, would do nicely.

So will East Midlands Railway have updated and faster Class 360 trains or will they be bringing in 125 mph trains to hit the required schedule to Luton Airport Parkway?

Conclusion

Luton Airport will have a real Airport Express!

But will the Class 360 trains, be able to deliver it? I have my doubts!

August 21, 2019 - Posted by | Transport | , , , , , , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.