The Anonymous Widower

Beeching Reversal – Mid-Cornwall Metro

This is one of the Beeching Reversal projects that the Government and Network Rail are proposing to reverse some of the Beeching cuts.

This is a strange project, as I can’t find a detailed description of what it entails.

All I can think, is that it is a general project to run all the local lines in Cornwall as a unified whole.

Great Western Railway runs these services in Cornwall.

  • Cornish Main Line – London Paddington and Penzance – One train per two hours (tp2h) – Calling at Plymouth, Liskeard, Bodmin Parkway, Lostwithiel, Par, St Austell, Truro, Redruth, Camborne and St Erth
  • Cornish Main Line – Exeter St. Davids and Penzance – One train per hour (tph) – Calling at Newton Abbot, Totnes, Ivybridge, Plymouth, Devonport, Dockyard, Keyham, St Budeaux Ferry Road, Saltash, St Germans, Menheniot, Liskeard, Bodmin Parkway, Lostwithiel, Par, St Austell, Truro, Redruth, Camborne, Hayle and St Erth
  • Looe Valley Line – Liskeard and Looe – One tph – Calling at Coombe Junction Halt, St Keyne Wishing, Well Halt, Causeland and Sandplace.
  • Atlantic Coast Line – Par and Newquay – One tp2h – Calling at Luxulyan, Bugle, Roche, St Columb Road and Quintrell Downs
  • Maritime Line – Truro and Falmouth Docks – Two tph – Calling at Perranwell (1tph), Penryn, Penmere and Falmouth Town
  • St. Ives Bay Line – St. Erth and St. Ives – Two tph – Calling at Lelant Saltings, Lelant and Carbis Bay

Could frequencies and connectivities be improved?

Other Beeching Reversal projects are also aiming to improve the railways in Cornwall.

Transforming the Newquay Line
Reinstatement of Bodmin-Wadebridge Railway and associated works
Increased service provision Bodmin General-Bodmin Parkway

I think the first might increase frequencies on the Newquay to one tph or even two tph and the Bodmin General station improvements should create a useful new platform.

Wikipedia mentions this project.

Reopening The Lostwithiel And Fowey Railway To Passengers

Are there any other lines, stations or platforms, that could be reopened, given a passenger service or or an increase in frequency?

Conclusion

Someone must have a plan somewhere! So can they please disclose it?

 

August 1, 2020 - Posted by | Transport | , , , , , ,

1 Comment »

  1. […] Radstock railway reinstatement St Anne’s Park station Primrose Line Transforming the Newquay Line Mid Cornwall Metro Restoring secondary services on the Great Western Main Line Goodrington and Churston Stations New […]

    Pingback by Beeching Reversal: Fifty Disused Rail Lines On Track To Reopen « The Anonymous Widower | August 1, 2020 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.