The Anonymous Widower

Beeching Reversal – Mid-Cornwall Metro

This is one of the Beeching Reversal projects that the Government and Network Rail are proposing to reverse some of the Beeching cuts.

This is a strange project, as I can’t find a detailed description of what it entails.

All I can think, is that it is a general project to run all the local lines in Cornwall as a unified whole.

Great Western Railway runs these services in Cornwall.

  • Cornish Main Line – London Paddington and Penzance – One train per two hours (tp2h) – Calling at Plymouth, Liskeard, Bodmin Parkway, Lostwithiel, Par, St Austell, Truro, Redruth, Camborne and St Erth
  • Cornish Main Line – Exeter St. Davids and Penzance – One train per hour (tph) – Calling at Newton Abbot, Totnes, Ivybridge, Plymouth, Devonport, Dockyard, Keyham, St Budeaux Ferry Road, Saltash, St Germans, Menheniot, Liskeard, Bodmin Parkway, Lostwithiel, Par, St Austell, Truro, Redruth, Camborne, Hayle and St Erth
  • Looe Valley Line – Liskeard and Looe – One tph – Calling at Coombe Junction Halt, St Keyne Wishing, Well Halt, Causeland and Sandplace.
  • Atlantic Coast Line – Par and Newquay – One tp2h – Calling at Luxulyan, Bugle, Roche, St Columb Road and Quintrell Downs
  • Maritime Line – Truro and Falmouth Docks – Two tph – Calling at Perranwell (1tph), Penryn, Penmere and Falmouth Town
  • St. Ives Bay Line – St. Erth and St. Ives – Two tph – Calling at Lelant Saltings, Lelant and Carbis Bay

Could frequencies and connectivities be improved?

Other Beeching Reversal projects are also aiming to improve the railways in Cornwall.

Transforming the Newquay Line
Reinstatement of Bodmin-Wadebridge Railway and associated works
Increased service provision Bodmin General-Bodmin Parkway

I think the first might increase frequencies on the Newquay to one tph or even two tph and the Bodmin General station improvements should create a useful new platform.

Wikipedia mentions this project.

Reopening The Lostwithiel And Fowey Railway To Passengers

Are there any other lines, stations or platforms, that could be reopened, given a passenger service or or an increase in frequency?

Conclusion

Someone must have a plan somewhere! So can they please disclose it?

 

August 1, 2020 Posted by | Transport | , , , , , , | 1 Comment

Truro Station – 19th November 2019

I took these pictures as I changed trains at Truro station yesterday.

Note.

  1. The station has two footbridges, neither of which are step-free.
  2. There are two through platforms and a bay platform for the Maritime Line service to Falmouth Docks.
  3. The frequency of the main lines is two trains per hour (tph).
  4. As the frequency of the Maritime Line is rge same services should connect.

But I had to wait thirty minutes on both my changes at the station.

In some ways for people like me, the lack of a step-free bridge at Truro station is a pain.

In one of my waits, at the station, I was on a cold platform with the coffee shop on the other.

So I skipped coffee, as I didn’t want to spill it getting back over the footbridge.

This Google Map shows Truro station.

Note the level crossing at the Eastern end.

In Winner Announced In The Network Rail Footbridge Design Ideas Competition, I wrote how the competition was won by this bridge.

So could a factory-built bridge like this be installed at Truro station?

There could be possibilities at the Eastern end, especially, if the level crossing were to be improved.

November 19, 2019 Posted by | Transport | , , , , , , | Leave a comment