The Wikipedia entry for the Dogger Bank, describes it like this.

Dogger Bank is a large sandbank in a shallow area of the North Sea about 100 kilometres (62 mi) off the east coast of England.

But many of my generation remember it from its use in the Shipping Forecast and as a joke place like the Balls Pond Road, Knotty Ash and East Cheam, in radio and TV comedy from the 1950s and 1960s.

But now it is being turned into one of the largest wind powerhouses!

According to Wikipedia’s list of the UK’s offshore wind farms, these wind farms are being developed on the Dogger Bank.

  • Sofia Offshore Wind Farm – 1400 MW – Under Construction – Commissioning in 2023/26 – £39.65/MWh – RWE
  • Dogger Bank A – 1235 MW – Under Construction – Commissioning in 2023/24 – £39.65/MWh – SSE/Equinor
  • Dogger Bank B – 1235 MW – Pre-Construction – Commissioning in 2024/25 – £41.61/MWh – SSE/Equinor
  • Dogger Bank C – 1218 MW – Pre-Construction – Commissioning in 2024/25 – £41.61/MWh – SSE/Equinor
  • Dogger Bank D – 1320 MW – Early Planning – SSE/Equinor
  • Dogger Bank South – 3000 MW – Early Planning – RWE

Note.

  1. These total up to 9408 MW.
  2. The Dogger Bank wind farms have their own web site.
  3. The Sofia offshore wind farm has its own web site.
  4. The Dogger Bank South wind farms have their own web site.
  5. Dogger Bank A and Dogger Bank B will connect to the National Grid at Creyke Beck to the North of Hull.
  6. Sofia and Dogger Bank C will connect to the National Grid at Lazenby on Teesside.

But this is only the start on the British section of the Dogger Bank.

This map, which comes courtesy of Energy Network Magazine and 4C Offshore is entitled 2001 UK Offshore Windfarm Map shows all UK offshore wind farms and their status. It looks to my naive mind, that there could be space for more wind farms to the North and West of the cluster of Digger Bank wind farms.

The North Sea Wind Power Hub

The UK doesn’t have full territorial rights to the Dogger Bank we share the bank with the Danes, Dutch and Germans.

In the Wikipedia entry for the Dogger Bank wind farm, this is said about the North Sea Wind Power Hub.

Dutch, German, and Danish electrical grid operators are cooperating in a project to build a North Sea Wind Power Hub complex on one or more artificial islands to be constructed on Dogger Bank as part of a European system for sustainable electricity. The power hub would interconnect the three national power grids with each other and with the Dogger Bank Wind Farm.

A study commissioned by Dutch electrical grid operator TenneT reported in February 2017 that as much as 110 gigawatts of wind energy generating capacity could ultimately be developed at the Dogger Bank location.

Note.

  1. 110 GW shared equally would be 27.5 GW.
  2. As we already have 9.4 GW of wind power, under construction or in planning around the Dogger Bank, could we find space for the other 18.1 GW?
  3. I suspect we could squeeze it in.

If we can and the Danes, Dutch and Germans can generate their share, the four countries would each have a 27.5 GW wind farm.

What would put the icing on the cake, would be if there could be a massive battery on the Dogger Bank. It wouldn’t be possible now and many would consider it a joke. But who knows what the capacity of an underwater battery based on concrete, steel, seawater and masses of ingenuity will be in a few years time.

Where Does Norway Fit In To The North Sea Wind Power Hub?

It could be argued that Norway could also connect to the North Sea Wind Power Hub.

  • 110 GW shared equally would be 22 GW.
  • Norway can build massive pumped storage hydroelectric power stations close to the landfall of an interconnector to the North Sea Wind Power Hub.
  • the British, Danes, Dutch and Germans can’t do that, as they don’t have any handy mountains.
  • Norway is a richer country the others involved in the project.

I can see Norway signing up to the North Sea Wind Power Hub.

The North Sea Link

The Wikipedia entry for the North Sea Link, introduces it like this.

The North Sea Link is a 1,400 MW high-voltage direct current submarine power cable between Norway and the United Kingdom.

At 720 km (450 mi) it is the longest subsea interconnector in the world. The cable became operational on 1 October 2021.

It runs between Kvilldal in Norway and Blyth in Northumberland.

I wouldn’t be surprised to see that the North Sea Link is modified, so that it has a connection to the North Sea Wind Power Hub.

 

 

November 22, 2022 - Posted by | Energy, Energy Storage | , , , , , , , , , ,

5 Comments »

  1. At least the Balls Pond Road, Knotty Ash and Dogger Bank exist, East Cheam doesn’t but that didn’t stop the great and good of Sutton and Cheam getting copies newspaper articles following Tony Hancock writing of his impressions of the people of Cheam Village. I can tell you it was the heaviest paper round I ever experienced.

    Comment by fammorris | November 22, 2022 | Reply

    • I live just off the Balls Pond Road. My grandmother was born close to its Eastern End and she was actually posh!

      Comment by AnonW | November 22, 2022 | Reply

  2. The map link is very useful but it shows how far behind England Scotland has become with offshore wind although its maxed out over England for onshore by a country mile. If this was 1950’s again we would have a CEGB planning this all so it was sequenced to maximise the speed with which the sites were built rather than all competing with each other for the limited supply chain and installation vessels driving up costs.

    Comment by Nicholas Lewis | November 22, 2022 | Reply

    • It was a free-for-all in the 1970s and the software I wrote; Artemis did well out of organising the resources.

      Someone will do the same with the much larger second helpings!

      They are much larger as there are more wind farms, than oil and gas rigs and platforms.

      Comment by AnonW | November 22, 2022 | Reply

      • Not so sure software today is too bloated and too complicated such that testing it is a nightmare. Look at Crossrail debacle and whilst computers are wonderful its just as well the basics of electric engineering were put in place before computers took hold. As my old boss all used to say KISS keep it simple stupid.

        Comment by Nicholas Lewis | November 22, 2022


Leave a reply to Nicholas Lewis Cancel reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.