I use Moorgate station regularly, as there’s a Leon Restaurant just outside the station, that looked after me properly during the Covid-19 Pandemic, so when I’m in the area and need feeding I pop in.
These pictures show the four bay platforms on the Sub-Surface lines.
Note.
- The pair of platforms to the left or South are numbered 5 and 6 and used to handle Thameslink trains, that ran to Moorgate station.
- Platforms 5 and 6 used to be electrified with 25 KVAC overhead wires.
- The pair of platforms to the right or North are numbered 3 and 4 and are used to terminate some Metropolitan Line services at Moorgate station.
- Platforms 3 and 4 are electrified with London Underground four-rail electrification.
- The number for Platform 4 can clearly be seen.
This map from cartometro shows the track layout in Farringdon, Barbican and Moorgate stations.
Note.
- The multi-coloured tracks and platforms of the Metropolitan, Circle and Hammersmith & City Lines running through Platforms 1 & 2 at Farringdon, Barbican and Moorgate stations.
- The multi-coloured tracks and platforms of the Metropolitan, Circle and Hammersmith & City Lines terminating in Platforms 3 & 4 at Moorgate station.
- The purple tracks and platforms of the Elizabeth Line running underneath the Metropolitan, Circle and Hammersmith & City Lines and their stations.
- The maroon and white tracks and platforms of Thameslink running through Platforms 3 & 4 in Barbican station and terminating in Platforms 5 & 6 at Moorgate station.
- The black tracks of Thameslink running through Farringdon and City Thameslink stations.
- It would appear there used to be two junctions to allow trains from Moorgate to go North through Farringdon station or South through City Thameslink station.
- The Thameslink tracks have two useful crossovers.
- The black tracks of the City branch of the Northern Line running through Old Street, Moorgate and Bank stations.
- The black tracks of the Northern City Line running through Old Street station and terminating in Moorgate station.
- The red tracks of the Central Line running through Chancery Lane, St. Paul’s and Bank station.
Because of the layout of the various tracks new connections and improvements may be possible.
Extending The Northern City Line To Bank Station
In Walking Along Moorgate – 30th September 2020, I describe some of the possibilities opened up by the design of Moor House, which has been built to allow more tunneling underneath.
I believe two extensions South from Moorgate station would be possible.
- It was intended by the builders of the Northern City Line, to take the route to just North of Bank station at Lothbury.
- Has The Possibility Been Created For A Pedestrian Tunnel Between Bank And Moorgate Stations?
Note.
- As the extension to Bank station has dug tunnels all over the place, I would expect that the engineers on that project would have a good idea on the best way to connect Moorgate and Bank stations.
- I usually use the Northern Line between Moorgate and Bank stations, but sometimes the Northern Line is rather crowded.
- The Northern City Line is being resignalled and may have an increased number of trains, so more passenger capacity may be needed.
- If a new station were to be built at Lothbury, it might be possible to improve step-free access to the Northern City Line.
- A new station on the Northern City Line and a pedestrian tunnel could connect to the newly-installed travelator at Bank station.
There are certainly serious possibilities to improve connections between Moorgate and Bank stations.
Could Metropolitan Line Trains Be Turned At Moorgate Station?
Currently, there are eight trains per hour (tph) between Aldgate and Uxbridge in the Off Peak.
With the new signalling on the Sub-Surface Lines would it allow more trains to operate, if some Metropolitan Line services were terminated in Platforms 3 & 4 at Moorgate station.
Would It Be Worthwhile To Run Thameslink Trains Again Into Moorgate Station?
It would only need to terminate trains from the North, as trains from the South can terminate at Black friars Station.
Perhaps a two tph service from a convenient station would suffice.
A Pedestrian Connection Between City Thameslink Station And St. Paul’s Tube Station
I covered this in A Pedestrian Connection Between City Thameslink Station And St. Paul’s Tube Station.
March 29, 2025 - Posted by AnonW | Transport/Travel | Bank And Moorgate Moving Walkway, Bank Station, Barbican Station, Circle Line, City Thameslink - St. Paul's Pedestrian Link, City Thameslink Station, Elizabeth Line, Farringdon Station, Hammersmith & City Line, Leon Restaurants, London Underground, Metropolitan Line, Moorgate Station, Northern City Line, Northern City Line Extension To Bank Station, Thameslink, Uxbridge Station
7 Comments »
Leave a reply to Mark Clayton Cancel reply
This site uses Akismet to reduce spam. Learn how your comment data is processed.
About This Blog
What this blog will eventually be about I do not know.
But it will be about how I’m coping with the loss of my wife and son to cancer in recent years and how I manage with being a coeliac and recovering from a stroke. It will be about travel, sport, engineering, food, art, computers, large projects and London, that are some of the passions that fill my life.
And hopefully, it will get rid of the lonely times, from which I still suffer.
Why Anonymous? That’s how you feel at times.
Charities
Useful Links
Top Posts
- Jamie Oliver's Fish Pie
- Did This Get Lost In The Covids?
- UK Gov’t Tweaking CfD Rules Ahead Of 8th Allocation Round, Proposes ‘Other Deepwater Offshore Wind’ Category
- Where Should You Travel On An Elizabeth Line Train?
- There's A Hole In The Bus
- Beeching Reversal: Fifty Disused Rail Lines On Track To Reopen
- Electrification Between Newbury And East Somerset Junction
- Chiltern Sets Out New Fleet Ambitions
- Asthma Carbon Footprint 'As Big As Eating Meat'
- A Message To All Customers Of Currys/Dixons plc
WordPress Admin
-
Join 1,883 other subscribers
Archives
Categories
- Advertising Architecture Art Australia Banks Battery-Electric Trains BBC Buses Cambridge Coeliac/Gluten-Free Construction COVID-19 Crossrail Death Decarbonisation Design Development Docklands Light Railway Driving East Coast Main Line Electrification Elizabeth Line Energy Engineering Entertainment Floating Wind Power Flying Football France Freight Germany Global Warming/Zero-Carbon Good Design Gospel Oak And Barking Line Greater Anglia Great Western Railway Heathrow Airport High Speed Two Highview Power Hydrogen-Powered Trains Innovation Internet Ipswich Town King's Cross Station Law Liverpool London London Overground London Underground Manchester Marks and Spencer Network Rail New Stations Offshore Wind Power Olympics Phones Politics Project Management Religion Research Scotland Shopping Solar Power Stations Step-Free Stroke Television Thameslink The Netherlands Trains United States Walking Weather Wind Power Zopa
Tweets
Tweets by VagueShot





Original there was a plan to hold trains on the old lines between Farringdon and Moorgate so they could inject them into the system to maximise frequency in the rush hour. Covid has put paid to that as well as the Lizzie line. The points and short section of track was installed on the East side of Farringdon but thats as far as its got.
Comment by Nicholas Lewis | March 29, 2025 |
I think there used to be something in Wikipedia, about turning some Uxbridge trains at Barking or something similar.
TfL also bought an extra S8 set for the cancelled Croxley Link. This might allow them to run a more intensive service to Uxbridge.
Comment by AnonW | March 29, 2025 |
I can’t see how TfL can usefully repurpose them – sorry.
Comment by Mark Clayton | March 29, 2025 |
Impossible – the branch was closed to extend the platform at Farringdon to cater for 12-car trains.
Comment by Brian Armitage | March 30, 2025 |
I think the only way it could be done would be to use eight-car or even six-car trains.
Comment by AnonW | March 30, 2025 |
I say again, it is impossible.
When the platform was extended at Farringdon the space that the old tracks to Moorgate occupied was built over. No Thameslink trains, however long, are going to call at Moorgate without an extensive rebuild that would limit the length of all southbound trains, not to mention eliminate the interchange with the Elizabeth line.
Comment by Brian Armitage | March 30, 2025
Had it been a realistic possibility I wished they did more historically with platforms 5 and 6 for Thameslink and/or Metropolitan, basically a sharp Baker Street like turn at Moorgate towards Tower Hill away from Finsbury Circus and east of Bank of England building before running parallel onto mainline tracks akin to DLR from Bank beneath Tower Hill to Shadwell beyond.
It would have also helped had LT&SR reached Lime Street as planned prior to route up to the old Limehouse station being put underground as envisaged in one scheme over a century ago. The same with the Northern line platforms at Bank being where present day platform 3 and DLR platform 9/10 are, which would have helped Northern City at Moorgate run further south than proposed stop at Lothbury.
Meanwhile platforms 3 and 4 could be used as additional termini for either sub-surface tube or Thameslink.
Comment by 912 Carrera | March 30, 2025 |