Over the next few years there are going to be changes at Barking station.

Barking and Dagenham Council have plans to redevelop the station, but compared to many 1960s stations built by British Rail, Barking station isn’t one where you need to call in the heavy demolition squads. From what I’ve seen elsewhere, a partnership between good architects and a competent construction company, should be able to create a station fit for the twenty-first century.

The station is also served by two ambitious operators; Transport for London, with both Underground and Overground and c2c with services along the Essex Coast.

So I have this hope that between the three of them, they can turn Barking into another East London gateway to Essex alongside Liverpool Street and Stratford.

It has also been announced that the Gospel Oak to Barking Line will now be going to a new station at Barking Riverside.

Transport for London have now produced two options about how this line will link up to the station.

This is Option A, which would need two single track viaducts.

Barking Option A

Barking Option A

And this is Option B, which gives the option of a second station and needs a double-track viaduct.

Barking Option B

Barking Option B

As both link into Platforms 7 and 8 at Barking station, there would appear to be little difference between the two options except for the ability to have a second station with Option B and the possibility of one track layout being cheaper.

This Google Earth image shows Barking station.

Barking Station

Barking Station

Platforms 7 and 8 are at the southern side of the station. So this means that trains from Gospel Oak, will have to criss over several lines to get from the northern side to the southern. But this is not a problem here, as there is a flyover, which has been built to get freight trains across the main lines. If this hadn’t been built sometime in the past, then extending the GOBlin to Barking Riverside would be a lot more expensive.

When I was at Barking recently, Underground and c2c trains were using opposite sides of the same platforms, thus allowing cross-platform interchange.

This would appear to be the platform usage.

1 – Bay platform for Gospel Oak to Barking trains

2 – Eastbound Underground – Paired with 4

3- Bay platform for Underground – Tucked between 2 and 4

4 – Eastbound c2c – Paired with 2

5 – Westbound c2c – Paired with 6

6 – Westbound Underground – Paired with 5

7 – Eastbound c2c – Paired with 8

8 – Westbound c2c – Paired with 7

If there is a problem, it is that to change between c2c and the Underground isn’t always a simple cross-platform interchange, but sometimes up and down steps. As getting on the Underground at Fenchurch Street isn’t simple and West Ham is similar to Barking with lots of steps, it would seem that this neglected part of London needs a few station improvements.

This won’t get any better after Barking Riverside is served, as this will put extra trains through platforms 7 and 8.

I would assume that Network Rail have a cunning plan up their sleeves.

It would surely be better if all c2c trains used either platform 4 to go east and 5 to go to west to Fenchurch Street.

This may not be possible with the current track layout, which would appear to split into the two services via Basildon and Ockendon respectively to the west of Barking station. The southern route via Ockendon, branches away soon after the station, so moving the junction to the east of the station to use just a single platform in each direction, might not be possible.

But a better platform layout would make it more difficult for passengers to get lost or miss connecting trains at Barking.

I think in a few years time, Barking will have an important interchange station, adding significantly to the transport options of the area.

May 14, 2015 Posted by | Transport/Travel | , , , | Leave a comment

Crossrail 2 At South Tottenham/Seven Sisters

In this post, I speculated that South Tottenham and Seven Sisters stations could share a double-ended Crossrail 2 station. This is a map taken from the Crossrail 2 web site.

Crossrail 2 At Seven Sisters

Crossrail 2 At Seven Sisters

The two rail lines are the Gospel Oak to Barking Line (GOBlin) going across the map and the Lea Valley Line into Liverpool Street via Hackney Downs going down. This Google Earth image gives another view.

South Tottenham And Seven Sisters

South Tottenham And Seven Sisters

The orange line is the GOBlin and the blue one is the Victoria Line. Note the area south of the GOBlin, which has been safeguarded. Could this be used for a shaft to access the tunnels or help to build a large double-ended station? I took this picture of the area from a train going to Barking.

 Safeguarded For Crossrail 2

Safeguarded For Crossrail 2

It would probably be in a better state after Crossrail 2 had reinstated the land after use.

At least the distance between Seven Sisters and South Tottenham stations at about two hundred metres or so, would be pretty compatible  with the length and size of a Crossrail-sized train and platforms.

So I come to the conclusion, that Seven Sisters station will built as a double-ended station and be a major  interchange between London Overground ‘s Gospel Oak to Barking and Lea Valley Lines, the Victoria Line, Crossrail 2 and National Rail services. Such an interchange will support major development in a part of London, that desperately needs more housing, jobs and leisure and business opportunities.

March 28, 2015 Posted by | Transport/Travel | , , | 2 Comments

Is The Battery Electric Multiple Unit (BEMU) A Big Innovation In Train Design?

By training I am an Electrical Engineer who specialised at Liverpool University and for a few years afterwards in the mathematics of the control of mechanical, electrical and other systems.

Over the last fifty years, I’ve liked to think of myself as scientifically green and in transport, I’ve come to the belief that we need to be as electric as possible, as this can produce a minimum of carbon dioxide and less noxious fumes and noise.

We may have produced a series of battery-electric vehicles for special purposes such as golf buggies, the electric milk floats of my childhood and light taxis and buses for historic city centres.

 

Electric Taxi In Malta

Electric Taxi In Malta

 

But where are the queues of stylish electric cars waiting for the charging points in my local car park in Dalston?

In my view, electric road vehicles with one or two rare exceptions, don’t really appeal to drivers, owners and users. You read reports that the economics are suspect without large subsidies. That’s as maybe, but having once owned a golf buggy, I can testify that battery life and performance wasn’t acceptable to the special needs on my farm.

So when Bombardier, Network Rail, Greater Anglia and others announced they were going to test a Class 379 4-carriage train as a battery-electric multiple unit (BEMU), I either thought they had more money than sense or there was something I’d missed.

Riding The BEMU

A desire to investigate found me on a cold morning in February boarding what looked to be a outwardly normal Class 379 train at Manningtree.

An Outwardly Normal Class 379 Train

An Outwardly Normal Class 379 Train

The only visible difference was the Batteries Included sign on the side. Inside nothing appeared to have been changed

A Very Familiar Interior

A Very Familiar Interior

Except for the destination display showing we were going the dozen miles to Harwich Town.

As we trundled away and breezed down and back up the Stour Estuary, I could detect no difference between the two runs and between train 379013 and its unmodified siblings, which I use regularly to Cambridge. The conductor assured me that they generally went one way under AC power from the catenary and the other on the batteries.

 

Returning from Harwich, I travelled with the train’s on-board test engineer, who was monitoring the train performance in battery mode on a laptop. He told me that acceleration in this mode was the same as a standard train, that the range was up to sixty miles and that only minimal instruction was needed to convert a driver familiar to the Class 379 to this battery variant.

 

It was an impressive demonstration, of how a full-size train could be run in normal service without connection to a power supply. I also suspect that the partners in the project must be very confident about the train and its technology to allow paying passengers to travel on their only test train. 

It’s All About The Rolling Resistance

The physics of rolling resistance, explain why I was wrong to be sceptical and had now been so surprised and delighted by the Class 379 BEMU.

Most of us have driven a car with soft tyres and know that you need more power to maintain speed, as soft tyres have a higher rolling resistance.

Generally the rolling resistance of a steel wheel on a steel rail is lower, which helps trains move heavier loads for less power than road vehicles with rubber tyres.

But also if you read about the mathematics of rolling resistance, you will find that if you increase the load on a steel wheel running on a steel rail you lower the rolling resistance, so you can move the train for less power. This helps explain the impressive performance of the BEMU.

You have the paradox, that optimally-located heavy batteries, in a steel-wheel-on-rail vehicle, reduce the rolling resistance and mean it needs less power.

One of the most important  rules of life is that you can’t disobey the laws of physics.

A Hybrid Train

In some ways to consider this train a battery electric multiple unit is wrong, as its nearest cousin is probably the hybrid bus, such as the New Routemaster in London. In the bus the battery is charged by a small diesel engine and final drive is all-electric.

In the rest of this article, I will continue to use BEMU, but hybrid electric multiple unit or HEMU might be better. It could be argued that the general public associate hybrid with something good, so there may be sensible public relations reasons for calling the trains HEMUs.

Using a BEMU

One of the main uses of a BEMU would be on a cross-country route that connects two electrified lines. The overcrowded Cambridge to Ipswich route would certainly be possible, as the gap between Haughley Junction and Cambridge is short of thirty miles and well within the capability of a BEMU.

Another use of  a BEMU would be to extend an electrified route  to an important town that needed a rail link bigger than can be provided by a two-coach diesel train of a certain age. London to Great Yarmouth via Norwich would be a typical route.

Branch lines off an electrified main line, such as the Felixstowe branch would be ideal for a BEMU.

The three East Anglian examples I have given could probably be served without spending a penny on infrastructure.

The Greater Anglia Involvement

Greater Anglia’s involvement in the project is significant as East Anglia has several routes suitable for a BEMU, in addition to those mentioned earlier.

The trains would also give the company the ability to extend some of the Liverpool Street to Cambridge services to perhaps Norwich, Newmarket and Bury St. Edmunds.

Some gaps like Ely to Norwich, might be stretching the range, but the trains could give the soon-to-be-two Cambridge stations much better access to a wider East Anglia from Peterborough and Wisbech in the West, Norwich and Cromer in the North and Yarmouth and Ipswich in the East.

East Anglia seems to suffer more than most from track and overhead wire problems and rebuilding. A BEMU would make a superb blockade buster and could even have been used to get passengers to Peterborough, when all the problems happened on the East Coast Main Line at Christmas, by jumping the gap from Ely.

The rail network in East Anglia also suffers from periodic overcrowding, especially in the summer, so extra carriages on many services would be welcome to Greater Anglia and users alike.

East Anglia for so long a rail backwater would love these trains.

Advantages To Network Rail

Network Rail is an infrastructure company so why is it getting involved in the design of trains?

Network Rail has some problems with electrification due to well-publicised issues and in some cases the large quantity, they are being tasked to install, which puts pressure on manpower and resources.

In some sensitive areas, there may be planning issues with putting up the overhead wires. A simple example in Suffolk illustrates the value of a BEMU. It is unlikely the Gainsborough Line will ever be electrified, as it runs through the Stour Valley and the Nimbys would have a field day if Network Rail decided to put overhead line gantries on the iconic listed Chappel Viaduct, which is the second largest brick structure in England. But as the line is only a dozen miles long, running a BEMU on the line would be a sensible idea.

There are probably a lot of places where using a BEMU, rather than electrifying saves Network Rail a lot of installation costs and lawyers fees. Passengers would get a brand new and probably larger electric train, from the day they can be delivered and after the train crew has been trained.

Electrification of passenger services is a proven revenue generator, but predicting how much electrification will increase traffic, is one of the blackest of black arts. The difficulty is illustrated by the North and East London Lines, which were built to run the three-car trains that were thought to be required for the level of traffic. London Overground is now going through the second train lengthening process to cope, which is also requiring various infrastructure changes. If London can’t get this right with their massive journey databases, how can you predict traffic on a branch line in say Dorset or Norfolk? A shiny modern BEMU could be a valuable tool for assessing the increase in traffic, by trialling one for a period to ascertain what needs to be done to improve a service. The solution could be anything from bringing back the terrible diesel multiple unit, through using a BEMU on the line to full electrification.

I think it is true to say, that Network Rail could probably cut the cost of electrification and line improvements, by better planning of the work.

There are also innumerable lines in the United Kingdom, where the distance is less than sixty or seventy miles and both ends of the line are electrified, which are possibilities for running BEMUs.

  • Hurst Green to Lewes via Uckfield and the Marshlink Line in Sussex
  • The Tyne Valley Line between Newcastle and Carlisle
  • Many lines that link to electrified hubs like Liverpool, Manchester, Birmingham and Leeds.
  • Lines in Scotland that link to the current electrification. This could include the new Borders Railway which is only thirty miles long.
  • Any branch from an electrified main line.

Unfortunately for everybody concerned, the hundred miles between Salisbury and Exeter is probably just too far to run on batteries at present. But this could be possible in a few years, as the technology develops.

Many routes with minimal partial electrification could accept a BEMU tomorrow, which could be a more affordable alternative to full electrification.

  1. Full electrification often needs a lot of bridge and tunnel reconstruction to give sufficient clearance to the wires. With a BEMU, this is unnecessary.
  2. Deployment of BEMUs, could also release much-needed modern diesel trains for use on lines away from electrification.

I would argue it’s better to spend the money on rolling stock, rather than use it to enlarge bridges and tunnels.

The Biggest Advantage To Rail Companies And Users

The biggest advantage of the technology is a truly unusual one, which is akin to putting the cart before the horse.

It’s that the new BEMUs start to run as soon as they are delivered and even before the electrification is complete.

Suppose you are possibly going to electrify a line like Carlisle to Newcastle, where both ends are already wired.

Traditionally, you can’t run any electric trains, until the electrification is complete.

But if you used BEMUs to operate the line, you can actually deliver the trains and bring in the new service pattern before you electrify using the power at both ends to charge the batteries.

After electrification, you might replace the BEMUs with a non-battery sibling and move the BEMUs to another line to repeat the process.

So the passengers benefit earlier from new trains. The train company should also benefit, as hopefully all the publicity of better and possibly longer trains generates extra journeys.

Instead of the speed of the electrification works governing the pace of line modernisation, the limiting factor is how fast trains can be built and any necessary much smaller infrastructure improvements like platform extensions are completed.

A Possible Production BEMU

The partners in this project seem to have come up with some fairly tight performance objectives for the train.

  1. A sixty plus mile range. This seems to bridge a lot of network electrification gaps and the length of out and return on the average branch line – Achieved
  1. Performance similar to the standard Class 379 and enough to work the average secondary or branch line – Achieved.
  1. No change of passenger experience to a standard Class 379 – Achieved
  1. Identical Driving Characteristics to a standard Class 379 – Achieved
  1. An overall experience better than a Pacer or a Sprinter – Achieved by a wide margin. I’ve also ridden modern Class 171 and Class 172 diesel multiple units lately and the Class 379 BEMU was certainly better in terms of ambient noise.

Bombardier could just create a Class 379 BEMU, but I suspect that the upcoming Aventra train chosen for Crossrail would be used. After all, why would you use a boring old train, when you could have a sexy new one? Especially one that is lighter and more energy efficient.  You could even borrow the use of a small on-board engine to charge the battery from the bus industry.

Probably the most difficult decision in the design is the train length, but why not make them all identical go-anywhere four carriage dual-voltage trains?

Incidentally, that go-anywhere capability will be enhanced when ERTMS becomes standard for all trains.

How Would BEMUs Affect Various Schemes?

The next few sections will look at various proposed schemes and how BEMUs might affect them.

The Felixstowe Branch

I’ve used the Felixstowe branch for over fifty years and the individual train capacity is now smaller than it was in the 1960s. But the frequency has improved and the service has got better since the Bacon Factory Chord was created.

It carries upwards of thirty freight trains each way every day and has long been mooted for electrification. Unless the complete route from
Felixstowe to Nuneaton and inside Felixstowe Port were also electrified, electrification of the branch line is probably a waste of time, as there would need to be a change of locomotive at some point.

I sometimes wonder if you want to have overhead wiring in a port or goods yard, with cranes lifting containers all the time.

I believe that the Class 88 locomotive is a better solution, as this would give electric haulage on electrified lines like the Great Eastern Main Line and diesel haulage on the branch and in the port.

Passengers on the line would like better and larger trains and this could be solved by a BEMU charging every time it returned to the Ipswich end of the branch.

Ipswich To Cambridge And Lowestoft

If you are going to run a BEMU from Ipswich to Felixstowe, then surely it would be a good idea to run the trains on the services from Ipswich to Cambridge and Lowestoft.

The gap between the overhead wires at Cambridge and Haughley Junction is less than thirty miles and would easily be jumped by a BEMU, charging itself at the two ends of the line.

Ipswich to Lowestoft is fifty miles which would certainly be too far for a BEMU going out and back on one filling of electricity at Ipswich. But as I believe a BEMU should be dual voltage, why not put in a shielded length of third-rail away from the platform side of the train in Lowestoft station. This picture shows the platform layout at Lowestoft with the current Norwich and Ipswich Class 156 trains in the platforms.

Two Class 156 At Lowestoft

Surely, Network Rail’s engineers can come up with a third-rail system in the station for charging BEMUs, that meets the most draconian Health and Safety regulations.

If BEMUs were to also run the Norwich to Lowestoft services, then you’d have electrified the passenger services to the United Kingdom’s most easterly town.

What would a picture of two Aventra BEMU profiles in Lowestoft station, do for the town?

Completing The East Anglian Electrification Of Passenger Services

If some means of range extending like a third-rail-based charger in some terminal stations, then there is no reason that all unelectrified lines in East Anglia could be run successfully by BEMUs. These would include.

  1. Cambridge and Ely to Norwich on the Breckland Line
  2. Norwich to Yarmouth on the Wherry Lines
  3. Norwich to Cromer and Sheringham on the Bittern Line
  4. Marks Tey to Sudbury on the Gainsborough Line

The BEMUs would also be an ideal train for the proposed re-opening of Bramley Line between Wisbech and March and the possible creation of the Norfolk Orbital Railway from Sheringham to Wymondham.

Completing The Electrification In East Sussex

East Sussex Council has produced a document called Shaping Rail In East Sussex, and also proposes the electrification of the Marshlink Line and improving and fully electrifying the Wealden Line and Oxted Line.

I believe that BEMUs could be the key to completing the electrification of this important commuter area and releasing sixteen Class 171 diesel multiple units for areas with no electrification at all.

As BEMUs would effectively be a one-for-one replacement for the Class 171 and no infrastructure work would be needed except for the track work at Lewes, as the new trains were delivered, a Class 171 could be released to go and replace a Pacer or Sprinter.

The Borders Railway

I suspect that various Scots and their politicians will be a bit miffed, that a beautiful new railway will be running second-hand trains. I suspect that something like Class 171 or Class 172 will be used, but wouldn’t it be nice if four-coach electric trains were to be used on the route.

As the route is not being electrified, but power is available at the Edinburgh end and the line is only sixty miles out and back, the line would be an ideal candidate for equipping with sexy new BEMUs.

The only problem is that the Scots have just signed a deal with Hitachi to deliver a whole stable of new AT200 electric trains.

However, it should be noted that Abellio Greater Anglia is one of the partners in the testing of the experimental Class 379 BEMU and that Abellio ScotRail is the new Scottish franchise holder.

Incidentally, Abellio’s parent; Nederlandse Spoorwegen still have sa few diesel multiple units, so perhaps they have other motives in being involved with the BEMU.

Glasgow Crossrail And The Airport Rail Link

Glasgow Crossrail is a proposal to improve rail services in Glasgow described like this in Wikipedia.

The proposed Crossrail initiative involves electrifying and reopening the City Union Line for regular passenger use in conjunction with new filler sections of track which will connect the North Clyde, Ayrshire, and Kilmarnock and East Kilbride suburban routes together, therefore allowing through running of services through the centre of Glasgow in a North-South axis.

It has been an on-and-off project over the years, as has the closely-related Glasgow Airport Rail Link.

Perhaps by selectively using BEMUs on the City Union Line, some of the major problems of rail transport in Scotland’s largest city can be alleviated, until the budget allows full electrification across the city.

Replacing Pacers Out Of Electrified Hubs

I asked in the title of this post if a new battery electric multiple unit (BEMU) could be a replacement for the truly-dreadful Pacers.

On some routes out of Liverpool, Manchester, Leeds and other electrified hubs, Pacers perform out and back services, which could probably be replaced by a BEMU.

As electrification progresses more and more, Pacers will find that they operate more of their routes partially under the wires. All of these routes will become candidates for BEMUs.

As the new trains will elsewhere displace some modern diesel multiple units, these could also probably chase a few Pacers to the scrapyard.

So in my view, new BEMUs may not always directly replace the Pacers, but they will certainly hasten their demise.

Should The Gospel Oak To Barking Line Be Electrified?

I know that freight is an important driver of electrification of the Gospel Oak to Barking Line, but how would the availability of a number of BEMUs affect how the work will proceed?

The Gospel Oak to Barking Line is being electrified at a cost of £115million. In addition eight new four carriage trains are being ordered for the line.

Electrification of the line is said to be difficult, as there are numerous bridges and viaducts.

But the line is also desperately short of capacity for passengers and desperately needs the new electric trains.

As the line is partly electrified, why not drop the full electrification for a few years and buy eight new BEMUs?

They would pick up power east of Woodgrange Park station and around South Tottenham, leaving only about twenty miles to run on the batteries.

If the batteries need a top up at Gospel Oak, why not put in a short length of overhead wire at the western end of the line. Or heresy of heresies, a short length of third rail!

As circumstances and funds allowed the rest of the line would be electrified.

All of the flexibility in the schedule would be down to the unique characteristics of the BEMU.

Some residents along the line might be annoyed by the continuing noise and smell of the diesel freight locomotives passing through if the line remains without full electrification, but passengers will get twice as many carriages as at present, in brand new electric trains. Passengers won’t care that they’re powered by batteries, so long as they are reliable, comfortable and punctual

Conclusion

Who’d have thought that such a rather unusual concept of a battery electric multiple unit would have so many possibilities?

I think I’ve seen the future and it just might work!

 

 

 

February 10, 2015 Posted by | Transport/Travel | , , , , , , , | 22 Comments

Could This Be From Where Crossrail 2 Is Dug?

As I trundled along the Gospel Oak to Barking Line (GPBlin) between Blackhorse Road and South Tottenham stations, I took these pictures.

As the reservoirs to the east of all this dereliction are going to be turned into the new Walthamstow Wetlands, could this be used as the site from where Crossrail 2 is dug?

This image from Google Earth shows the area.

East Of SouthTottenham Station

East Of SouthTottenham Station

The orange line is the GOBlin and the light blue is the Victoria line. The red arrow indicates South Tottenham station.

The area I photographed lies south of the GOBlin. Note how it is bordered by railways, with the West Anglia Main Line in the east and the double-track curve that connects the two lines in the south. Slightly to the south of where the two lines join at South Tottenham Junction, the River Lee runs close to the site in a south-westerly direction.

So the spoil from the tunnelling could either be used to help create the new wetlands or barged down London’s other navigable river to the Thames. When I worked for Enfield Rolling Mills at Brimsdown in the early 1960s. their supplies of copper wirebars were delivered by barge from London Docks using this route. In those days, the river wasn’t as clean as it is now, and there was quite a lot of commercial traffic.

Britain From Above has some wonderful pictures of the area from the 1930s here. This image shows the River Lee as it goes under the railway.

EPW042082

 

This modern picture from Google Earth gives a good comparison.

Note how the tracks on the West Anglia Main Line have been reduced from four to two by the closure of the easterly pair of tracks. Proposals for the line include four-tracking from just south of here to Broxbourne.

The large East Warwick Reservoir is just off the picture to the right and the timber yard is now housing.

The GOBlin is shown in orange on the second image and you can just pick it out on the 1933 aerial photo.

 

February 4, 2015 Posted by | Transport/Travel | , , | 2 Comments

The Party’s Over!

Network Rail and their engineers may have had problems at Kings Cross, but the new bridge at South Tottenham station on the Gospel Oak to Barking Line opened a few minutes before the previously published time of ten o’clock.

I was able to get the 09:45 train westwards from the station towards Gospel Oak.

I wonder how long it takes before a vandal puts some graffiti on the brand new bridge.

December 28, 2014 Posted by | Transport/Travel | , , , | Leave a comment

Would Extending The Gospel Oak to Barking Line Unlock Land For Development?

If the Gospel Oak To Barking Line (GOBlin) is extended to Hounslow, it looks like it will branch off the current line at Junction Road, to join the Midland Main Line through West Hampstead Thameslink and on to the Dudding Hill Line for Old Oak Common and Acton.

This map shows the lines to the east of Gospel Oak station towards Kentish Town.

Railways Between Gospel Oak and Kentish Town

 

The GOBlin runs across the top, with the other orange line being the North London Line. Across the bottom of the picture there is the Midland Main Line. The link between the GOBlin and the Midland Main Line is clearly shown., but note that the area to the east of this link is industrial. It is the headquarters and main London site of the Murphy Group.

Think about the area in the triangle defined by the railways to the east of Gospel Oak station and further east towards Kentish Town.

1. In my A-Z, the area is a big white space.

2. When Thameslink is complete, there will probably some release of land near Kentish Town station.

3. An extended and electrified GOBlin could have a station in this area, giving any new developments better transport links. This station could also give an interchange to the North London Line. This would be a better interchange than the current one at Gospel Oak station.

4. One of the reasons given for linking the GOBlin at Junction Road to the Northern Line at Turnell Park tube station, is to link the GOBlin to a North-South route. But an extended GOBlin going through a properly sorted West Hampstead Interchange, gives passengers access to a multiplicity of North-South routes, including Thameslink, Chiltern, North London line and the Underground.

5. Unless it is needed for freight trains, the stub of the line to Gospel Oak might be closed.

6. The northern part of the site could be linked in a sympathetic way to Parliament Hill Fields. There could even be a green walk to the new station, if one is built.

7. There used to be a link to allow trains coming west on the GOBlin to go South on the Midland Main Line. If there was a need for it, then it could be reinstated.

There is every reason to believe in the next few years, Transport for London will extend the GOBlin and if they do, this site’s development potential could be fully unlocked.

 

December 21, 2014 Posted by | Transport/Travel | , , | 1 Comment

Junction Road And Tufnell Park Stations

When there is speculation about new stations on London’s railways, the possibility of a new Junction Road station on the Gospel Oak to Barking line, linked to Tufnell Park tube station by escalator sometimes crops up.

This map shows the area.

Tufnell Park

Tufnell Park

Tufnell Park tube station is indicated at the bottom and Junction Road leads up from that station to the top right. The Gospel Oak to Barking line runs across the image to the top right corner at a thirty degree angle to the horizontal. The old Junction Road station was where the road and railway cross. Only Station Road survives.

What is interesting is to follow the railway under Dartmouth Park Road towards the top left and you can see some cars parked. This is a school, that has been built over some of the tracks of the railway.

If Junction Road station was to be reinstated, it is not that close to Tufnell Park tube station, so some heroic engineering would probably have to be employed to connect them.

But a better idea for the area must be being considered by Transport for London and property developers! After all, just as the school was created on the west side of Dartmouth Park Road, surely a similar method could be used to build something else over the railway. This map shows the area to a bigger scale.

Junction Road Station

Junction Road Station

If this should lead to a rebuilt Junction Road station, then this will be a bonus for everybody in the area and a good selling point for the developers.

I have since taken a few pictures of the area.

It’s quite a large area and it does seem to my engineering rather than property development brain, that it could be developed to either create housing or perhaps a school. A reinstated Junction Road station is probably not feasible as it is quite a walk to Tufnell Park tube station, which means crossing a busy road.

Note in the picture the actual junction, where the connection to the Midland Main Line, diverts from the Gospel Oak to Barking Line. This would be used if the line is extended to Hounslow.

The question has to be asked that if the line is extended, would the Gospel Oak to Barking Line still terminate at Gospel Oak station?

December 19, 2014 Posted by | Transport/Travel, World | , , | 1 Comment

VolkerFitzpatrick Are Having A Christmas Party At South Tottenham

The bridge at South Tottenham station, that carries the Gospel Oak to Barking Line over Tottenham High Road.

The road will be closed over Christmas and it looks it’ll be quite a party.

Note the large blue bridge in the pictures. If there is going to be a decent webcam, then this could be better Christmas television than most.

December 18, 2014 Posted by | Transport/Travel | , , , | 3 Comments

More Freight Trains On The Gospel Oak To Barking Line?

It has been announced in Modern Railways that DB Schenker is going to build an import/export terminal for new cars at Barking. The article says this.

The site has been chosen as it is the most westerly point of connection to the European rail network via HS1. DBS says it will also have excellent access to the UK strategic highway infrastructure.

The hub will initially handle up to 150,000 vehicles per year and is expected to open in March 2015.

What surprises me about the announcement, is that the terminal will open in just three months.

The only problem, is that there will be extra freight trains on the Gospel Oak To Barking Line.

So the sooner that line is electrified the better, as then at least the locomotives will make less noise and pungent smoke.

December 10, 2014 Posted by | Transport/Travel | , , | 1 Comment

Will We Get Less Diesel Locomotives On The Overground?

I have been reading Network Rail’s Anglia Route Study.

One thing they say will be done is this.

Electrification of the Gospel Oak to Barking  Line and the Thameshaven freight branch.

So if they electrify toThameshaven or London Gateway, as its owners call it, will they also electrify from the Great Eastern Main Line to Felixstowe?

But whatever happens an electrified GOBlin and the ability to take electric locomotives into London Gateway, will surely cut the number of smelly and smoky diesel locomotives passing through the residential areas of North London.

Electrification of the Felixstowe branch would get rid of a few more.

The question has to be asked if we have enough electric freight locomotives.